Post Job Free

Resume

Sign in

Project Management Business Development

Location:
El Mansheyah El Bahareyah, Alexandria, 21, Egypt
Salary:
60000
Posted:
March 23, 2024

Contact this candidate

Resume:

Page *

Emad Eldin Megahed Abou-Alazm

Personal Information

Egyptian

E-MAIL: ad4iw3@r.postjobfree.com

Mob: +201*********.

Objective & Aspiration

I am looking for a challenge in the field of General Management, projects management and Contracting Management where I can put to good use my engineering consultancy background and my strong experience of team management with Highly Leadership Skills. Ideal positions would be in company growth and business development departments. I am also very knowledgeable in the fields of tendering, contracts and claims to meet the highest standards from draft to execution and supervision.

Summary of Skills

• More than 30 years of project management, engineering and construction experience, within design construction.

• Civil Engineering Master Degree.

• PMP Degree.

• Fluent in Arabic and English.

PROFESSIONAL EXPERIENCE

1- Projects Manager. More than Two Years. From Sep 2021 until Nov 2023- Egypt. Alforat Development (One of the Biggest Company in Real Estate & Construction in Egypt). Alforat has cemented its place as the leading residential and gated community developer - Alexandria, Egypt. Team Leader of the following Projects: -

As a main link between Board of Directors of the Company and the all projects and their managers to follow up the stages of work execution, give them Technical Support and solve any problem they faced.

• Muruj Compound (Under Construction 80%): (102) Villas – Egypt: Total area 63000 m2 at a Cost about 70 million dollars.

• Sawary Square (Under Construction 75%): (3) Residential towers (11) residential floors with Total area 9500 m2 at a Cost about 20 million dollars.

• Twin Towers (Under Construction 90%): (2) Residential towers (11) residential floors with Total area 2400 m2 at a Cost about 10 million dollars.

• Saba Residences (finished): one Residential tower (11) residential floors with Total area 750 m2 at a Cost about 7 million dollars.

• Club Side (Under Construction 90%): one Residential tower (11) residential floors with Total area 600 m2 at a Cost about 5 million dollars.

• Followed Up on supervised execution for lots of Projects with cost about 112 million dollars. Page 2

This Period Including working as General Manager of Project Management at Al-Nasr Facilities and Installations / Mostakbl City – New Cairo. (In Co-Operation with Alforat Development).

As a main link between Board of Directors of the Company and the Project team work to follow up the stages of work execution, give them Technical Support and solve any problem they faced.

• Bloom Fields Down Towns (Under Construction 50%):(6) Residential Down Towns (7) residential floors with area about 6000 m2 for each one and Total area 50000 m2 for all at a Cost about 45 million dollars.

• Bloom Fields Villas (Under Construction 25%): (50) Villas – Egypt: Total area 35000 m2 at a Cost about 35 million dollars..

2- CEO of Projects and the General Manager - Technical Department. More than Three Years and Half. From Feb 2018 until Sep 2021- Egypt. Elmasherek for Building & Reconstruction (Company had big experience in Real Estate & Construction Field in Egypt)

Elmasherek has cemented its place as the leading residential community developer - Alexandria, Egypt. Team Leader of the following Projects: -

As a Decision Maker and main link between Board of Directors of the Company and the all projects and their managers to follow up the stages of work execution and solve any problem they faced.

• Saraya El Mashrek (Done): (5) Residential towers (11) residential floors with Total area 2500 m2 at a Cost about 15 million dollars.

• Porto Lagoons Project with Delmar Tourism Development Company – Alamain City – North Coast – Egypt (Done): (5) Residential towers + an Artificial lake + machine room + 36 Villas at a cost about 60 million dollars.

• West El Shrouk (Done): (3) Residential towers (7) residential floors with Total area 3500 m2 at a Cost about 15 million dollars.

• Followed Up on supervised execution for lots of Projects with cost about 90 million dollars. 3- Contract Administrator (Contract Management Expert). More than Two Years and Half. From Dec 2015 until Feb 2018- Oman. Ministry of Transport and Communication – Sultant of Oman. Responsibilities: -

• Provide technical support to the Ministry and Department as an expert in the field of tenders and contracts.

• Prepared and reviewed tenders and assigned to companies & institutions in coordination with the relevant directorates.

• Prepared and reviewed contracts with consultants or contractors.

• Followed Up on contractual procedures and supervised execution for more than 200 Mega Projects with cost about 3 billion dollars.

4- G.Manager of Technical Dep. Three Years. From august 2011 until Dec 2015 – Egypt. Elsarya Invest Mental Estate Company.

As a Decision Maker and main link between the Board of Directors of the Company and the managers of the Projects to follow up the stages of work execution, give them Technical Support and solve any problem they faced.

Page 3

Projects (Done) and Responsibilities: -

• Saraya Royal Plaza – Alexandria – Egypt: (4) Residential towers (11) residential floors with Total area 4800 m2 at a Cost about 30 million dollars.

• Saraya Gardens Compound – Alexandria – Egypt: (11) Residential towers with Total area 23000 m2 at a Cost about 70 million dollars.

• Sahel Hashish Resort - Hurghada – Egypt: Resort over Red sea with area about 25000 m2 at cost of 50 million dollars.

• Followed Up on contractual procedures and supervised execution for 3 Mega Projects with cost about 150 million dollars.

This Period Including working as General Manager of Technical Department. As a Sister Company.

Elmasherek for Building & Reconstruction (Company had big experience in Real Estate

& Construction Field in Egypt).

Responsibilities: -

• Draft and review all kinds of Tenders and contracts with the consultants or / and contractors.

• Review all drawings and estimative sheets from consultants.

• Provide Updates on contract performance to senior management.

• Followed Up on contractual procedures and supervised execution for more than 5 Mega Projects with cost about 100 million dollars.

This Period also Including working as General Manager of Project Management Department and Technical office. As a Free Lancer. At Pharos University. As a Decision Maker and main link between the Owner of the University and the managers of the Projects to follow up the stages of work execution, give them Technical Support and solve any problem they faced.

Projects (Done) and Responsibilities: -

• King Ranch Hotel – Borg Al Arab – Alexandria – Egypt: at cost of 35 million dollars.

• The residential University hotel - Alexandria – Egypt: at cost of 20 million dollars.

• The University Mosque Alexandria – Egypt: at cost of 8 million dollars.

• The College of Pharmacy Alexandria – Egypt: at cost of 25 million dollars.

• Followed Up on contractual procedures and supervised execution for 4 Mega Projects with cost about 90 million dollars.

5- Project Manager. More than Two Years and Half. From Mar 2009 until July 2011 – Egypt. Horse Alex Company.

As Project Manager of About 5 Projects Belongs to the Private Business of the Owner. Projects (Done) and Responsibilities: -

• Establish Maintenance Center for Chinese Vehicles (Jelly & Jack) - Cairo – Egypt: at a Cost about 5 million dollars.

• Erect Three Palaces with an area of 1600–1800 m2 for each mansion – Giza – Egypt: at a Cost about 1.5 million dollars for each one.

• Supervise audits and work with auditors on an interface level to accomplish results. Page 4

This Period Including working as Project Executive Manager Gama Company…

(In Co-Operation with Horse Alex Company).

As Project Executive Manager of the Project of the Factory of Recycling Plastic Products Supervised audits and collaborated with auditors.

Project (Done): -

• Factory of Recycling Plastic Products, Truck Scale, Warehouse Complex and an Administrative building - Cairo – Egypt: at a Cost about 40 million dollars. 6- Officer civil engineer. About Sixteen Years. July 1993 until March 2009 – Egypt. The Egyptian armed forces.

As an Officer Engineer for more than 16 years in Egyptian Armed Forces Who Design, Establish, Erect, Build and Supervise on many kinds of Structures (Fortificated Structures – Traditional Buildings

– Special Structures – Roads works – Bridges).

Projects (Done) and Responsibilities: -

• Executed many of Strong Points of Reinforced Concrete, including the hard layers along all external and internal road networks.

• Executed and supervised the implementation of manholes for fiber optics lines.

• Executed and finished of a concrete fortress including the implementation of the hard layers to fortify it with a luxurious surface of 2400 m2.

• Implemented and finished of a Building consisting of three floors for the Reconnaissance and War Security Agency with a surface area 1000m2.

• Established the Central Security Brigade affiliated with Ministry of Interior in Luxor – Egypt.

• Executed and supervised the implementation of the sports arena in Alexandria - Egypt, and supervised improvement of the Olympic Sports Center in Smouha area.

• Executed and finished of a residential tower for project management with a height of ten floors the Northern Military Region Command.

• Several more assignments on execution and maintenance of many projects related to the Northern Military Region Command.

• Executed all maintenance requirements for civil cities included all electronics, blooming and sewage networks.

• Supervised audits and collaborated with auditors.

Education & Certificates.

• 2022: Project Management Institute (PMP).

• 2011: Arab Academy for science, technology & maritime transport (Primavera course)

• 2000: Master degree, civil branch from Ain Shams University – Faculty of engineering.

• 1993: Bachelor of civil engineering with excellent degree from Military Technical College.

Language Skills.

• Arabic Mother Tongue.

• English: fluent.

• French: good understanding.

REFERENCES FURNISHED UPON REQUEST

Page 5

Page 6

Page 7

Page 8

Page 9

Page 10

Page 11



Contact this candidate