Post Job Free

Resume

Sign in

Civil Engineering Engineer

Location:
Lahore, Punjab, Pakistan
Posted:
April 25, 2024

Contact this candidate

Resume:

Page * of *

SYED HAMMAD ALI

LAHORE, PAKISTAN

PHONE NO. +92-333*******

E-MAIL: ad49wt@r.postjobfree.com

LinkedIn: www.linkedin.com/in/s-hammadali/

SUMMARY

I’m a licensed Civil Engineer with a Master of Engineering in Civil and nearly two decades (19 years) of experience in project development and construction management for top-tier companies in Qatar and Pakistan. I have a proven track record of success as an accomplished engineering professional. Throughout my career, I have gained invaluable hands-on experience in executing a wide range of complex and diverse construction projects. From highways, bridges, and underpasses to commercial and residential buildings, PEMB structures, oil & gas plants, fertilizer plants, and R&D projects, my expertise spans across various sectors, making me confident in my ability to tackle any construction project with the utmost skill, efficiency, and expertise. EDUCATION

Qualification Institute Year

Master of Engineering, Civil Engineering NED University of Engineering & Technology, Karachi, Pakistan 2010

(Major in Transportation Engineering)

Bachelor of Science, Civil Engineering University College of Engineering & Technology, Multan, Pakistan 2004 AFFILIATIONS

• Lifetime member of Pakistan Engineering Council: Registration No. CIVIL/24840

• Member of Pakistan Standards and Quality Control Authority’s technical committee BDC-13 & BDC-17

(2010-2011)

TECHNICAL EXPERTISE

• Site management, project execution and monitoring, estimates, cash flows, contract matters and IPC verification

• Project handover, engineering queries, technical proposals, method statements, as-built’s/ redlines, project dossiers, shop drawings, snags, SOR’s and NCR closures

• AutoCAD, MS Project, Primavera and MS Office

• Design coordination, client inspections and quality compliance with QHSE standards PROFESSIONAL EXPERIENCE

CIVIL MANAGER, UNISON PVT. LTD., PAKISTAN (DEC. 2019 – DATE) From June 2022 to date:

Project: Construction of Lake City Roof Garden Apartments Lahore (Ground plus 11 Floors), Cost: (PKR) 11 Billion

• Leading the construction manager’s team and managing the day-to-day activities of the process, including establishing priorities and work assignments to labor contractors.

• Budget monitoring, cash flows, scheduling of project resources, and its allocation to ensure project activities are running safely, within budget and on time.

• Conducting weekly meetings with client and contractors for progress review.

• Analyzing contractor’s plans, technical submittals and look ahead plan. From Dec 2019 to May 2020:

Project: Construction of FFC Tower Lahore initiated by Imperium Hospitality (Pvt.) Ltd (4 Basements, Ground plus 18 Floors with flat slabs using Unidome special bi-axial voided slab system)

• Worked in PMO, steered the project and oversaw the development of the project and ensured that team members carried out their tasks efficiently while upholding the company's standards.

• Developed Project management plans, including setting deadlines, prioritizing tasks, and assigning team members to various project deliverables.

PROJECT ENGINEER, AL-JABER ENGINEERING, QATAR (AUG. 2015 – MAY 2019) Project: Design and Build of New Orbital Highway and Truck Route Contract 3, Cost: (USD) 1,687,000,000. Scope: The New Orbital Highway is a 57 km road connecting 5 main Interchanges, 4 grade separated clover leaf type Interchanges and 1 grade separated junction, comprising 24 bridges, 18 braiding structures, emergency exists, bicycle underpasses, protection of Qatar Petroleum pipelines and other major utilities. Page 2 of 3

From February 2017 to May 2019: Worked closely with all levels of management, engineers and field operations staff to finalize and streamline the handover process which involved closure of NCR's, snags, Outstanding works and SOR's. Coordinated with supervision consultant AECOM and client ASHGHAL RMD to arrange handover inspections, finalizing redlines, as-built drawings and Operation Maintenance manual. From August 2015 to Jan 2017: Worked as execution engineer and successfully finished mock-up bridge, main bridges, ramp bridges and truck underpasses. Supervised excavation, foundations construction, waterproofing (dry & wet conditions), backfilling, abutments & pier columns, bearing plinths, bearing shelves, stem walls, approach slabs, counterbalance slabs, Freyssinet MSE walls, VSL precast bridge segments and MAURER expansion joints and bridge pre-cast elements. PROJECT ENGINEER, UNIVERSITY OF LAHORE, PAKISTAN (JAN. 2013 – JUL. 2015) Projects: Construction of various projects including Engineering Block-1 &2, biogas plant, swimming pool and teaching hospital with KIRBY structure, computer science department building, mosque, pavilion, link bridge, hostel extension, roads, auditorium, CSSD kitchen and underground facilities, including service ducts for IT network, manholes, storm water drainage and sewer network, Cost: PKR 722,000,000.

• Assisted Project Director and managed multimillion rupees projects initiated by the university.

• Ensured the quality of construction by direct supervision, and led the team of engineers, supervisors and quantity surveyors deployed in main and sub campuses.

• Performed budget monitoring and trend tracking, reviewed and approved bids, contractor's invoices, claims, change orders and engineering audits of sub campuses.

• Assisted in assessing maintenance, renovation and facility upgrading needs. CONTRACTS ENGINEER/ PROJECT LEAD ENGINEER, ETIMAAD QATAR LLC, DOHA, QATAR (MAY 2011 – NOV 2012) Executed various EPIC projects inside live plants including EPIC of OSGP work for 2012 shutdown at ORYX GTL, EPIC of new facilities at crude oil Tank Farm in Qatar Petroleum, Supply and installation of power and lighting cables to the new Warehouses and lay-down area at JBOG Port site Qatar gas, Construction, installation & commissioning of

“collection, storage & transfer of waste water” system in QAFCO.

• Reported to Sr. Project Manager and responsible for execution of all structural works involved in shutdowns inside the live plants.

• Handled overall activities including setting out, excavation, reinforcement, formwork, getting pre-pour approvals, concrete pouring, protective coats and miscellaneous works adhere with safety and quality.

• Prepared QIP's, JHA's, RFI's, method statements, material submittals, shop drawings and necessary formats.

• Interface with client for the approvals, progress review and scheduled meetings.

• Executed excavation of utility trenches, supply, laying & termination of power cables at JBOG

• Handled construction of 150 m3 waste water collection pits, underground tanks, shoring piles, utility trenches, manholes, pipes laying, pavement cutting and restoration inside QAFCO SR. RESEARCH OFFICER, COUNCIL FOR WORKS & HOUSING RESEARCH, GOVT. OF PAKISTAN (APR 2010 – APR 2011) Engaged in research and development activities and offering testing facilities on commercial basis:

• Assisted Principal Research Officer for quality testing under the scope of GTRR (geo-techniques and road research) laboratory, conducted technical tests (Sieve Analysis, Atterberg Limits, Hydrometer Analysis, Moisture Density relation and field density test) and submitted the reports to clients.

• Conducted tests on road material for various regions of Sindh, evaluated and submitted investigation reports on President of Pakistan Directives.

• Received membership of Pakistan Standards Quality Control Authority PSQCA technical committees BDC- 13 & 17 for developing Pakistan Highway Standards.

• Attended various international/national seminars and workshops on various areas with active participation from R&D organizations, industries, overseas OEMs and academic institutions. ASST. RESIDENT ENGINEER, INTERNATIONAL DESIGN GROUP, KARACHI, PAKISTAN (APR 2009 – APR 2010) Project: Infrastructure Development of Sindh Industrial & Trading Estate, Cost: PKR 954.828 million

• Developed project estimates, PC-1, Project documents, work schedules, tenders for the roads, culverts and residential buildings.

• Conducted site surveys, geometric design of roads and culverts, field tests and quality inspections SITE ENGINEER, NOOR DURRANI ASSOCIATES, KARACHI, PAKISTAN (JULY 2008 – MARCH 2009) Project: Construction of Metro Cash & Carry Store Karachi, Cost: PKR418.84 million

• Supervised KIRBY structures, fence, boundary wall, gatepost foundations, guardhouse, lampposts, truck canopies, road barriers and signage structures.

• Supervised utility structures i.e. grease traps, manholes, storm water collection tanks, shafts, trenches under slabs, electrical cable ducts.

• Supervised diesel storage tank, underground storage tanks, car parking foundations, good receiving truck canopy platforms and transformer room, asphalt pavements, concrete pavements and Rinol floors. Page 2 of 3

QA/QC ENGINEER, ECHO WEST INTERNATIONAL, KARACHI, PAKISTAN (FEB 2008 – JUNE 2008) Project: Construction of New US Consulate Compound Karachi, Cost: USD 6,418,493

• As subcontractor of BL Harbert International Supervised the construction of utility structures i.e. Pile work, deep trenches, duct banks, manholes, electrical ducts, catch basins and storm drains.

• Organized site tests, check requests, daily/monthly progress reports, materials submittals RESIDENT ENGINEER, NAYYAR ALI DADA & ASSOCIATES, MULTAN, PAKISTAN (FEB 2006 – JAN 2008) Project: Construction of MCB Regional Office Building, Basement plus 8 floors, Cost: PKR158 million

• Worked as the lead liaison between the client, designer and the contractor and managed the planning, coordination and implementation of project processes

• Performed site supervision of entire RCC building structure, plumbing works, and complete building finishes.

• Managed contracts, verification of contractor’s bills, claims and day to day site issues.

• Ensured progress monitoring through meetings and coordination with client, designers and contractors TRAINEE ENGINEER, NATIONAL HIGHWAY AUTHORITY, MULTAN, PAKISTAN (OCT 2004 – JAN 2006) Project: Construction of Sher Shah Bridge over River Chenab (N-70), Cost: PKR 950.4 million

• Worked closely with contractor and consultant for site supervision of earthwork, drilling, rebar work and concreting of piles.

• Involved in operations related to casting, stressing and grouting of girders. PROFESSIONAL TRAININGS/CERTIFICATIONS

• Confined Space Entry, Enertech Qatar, Jan 2018

• PMP Preparatory course of Advanced Project Management, Green International Qatar, 2017

• Lifting Supervisor (in accordance with BS 7121), Vibrant Qatar, 2016

• Scaffold Supervisor (in accordance with BS EN 12811-1:2003), Vibrant Qatar, 2015

• PTW Level-1 training course ORYX GTL Qatar, 2012

• PTW training course Level 1, 2 & 3 Qatar Petroleum, 2011

• PTW training course Qatar Gas, 2011

• PTW training course QAFCO, 2011

• H2S/BA (QP Approved), Enertech Qatar, Dec 2011

PERSONAL INFORMATION

• Date of Birth December 23, 1981

• Nationality Pakistani

• Notice Period 1 Month

• Marital Status Married

• Driving License Qatar & Pakistan



Contact this candidate