CURRICULUM VITAE
N.THABRAZ Personal details
EMAIL: ad47oy@r.postjobfree.com
CELL: +91-979*******
*/**** *.* ***** HALLI ROAD,
Date of Birth
Sex Nationality
Languages Known
: **/**/*986
: Male
: Indian Muslim
:English,Hindi,Tamil,Urdu,
R.S. MOSQUE BACK SIDE, Telegu
DHARMAPURI DIST
OBJECTIVE:
A spiring for a career that places me in a challenging position with in a fast-paced and learning environment for developing my technical linter personal skill.
EDUCATIONAL PROFILE:
Master in International business management with (76%) Loyola institutes of technology.
Year of completion:2014
B.E in Electrical Electronics Engineering with (66%) Maharaja Engineering College, Coimbatore,
Year of completion: April2010
DIPLOMO in Electrical and Electronics Engineering with (76%) Muthayammal Polytechnic college,
Year of completion: April2007
ADDITIONAL QUALIFICATION:
Institution/Course title: APTECH/Computer course (MS-word, PowerPoint, AutoCAD) Safety management, Team leading, PowerPoint, presentation.
Time management, client documentation submission. WORKING EXPERIENCE:
14 Years 3 months Experience in Industrial, MEP construction,1lak class clean room HVAC, Thermal power plant, solar power plant, oil and gas power plant of operation and maintenance, installation & commissioning in all the field.
TAMILNADU.
CAREER RECORD:
From NOV 2023 to At present As a Senior Executive Engineer AMS projects Consultant Pvt Ltd. HVAC and FIRE FIGHTING Client: Hindustan coco cola Responsible of Process area All HVAC Chiller 145TR installation. Chennai. Air Washer unit installation, Air Handling unit installation, 145TR cooling tower installation. HVAC Ducting installation.
Fire Fighting and Fire Hydrant pipe line Erection and Installation All the detector and sensor erection and installation. From FEB 2023 to NOV 2023
Bharuka construction pvt ltd,
Aurangabad.
From DEC 2021 to FEB 2023
Enrich MEP Engineering pvt
ltd. Madurai.
From Feb2020 to 2021July
Construction Building wiring
(Hotels,home,EPC buildings
Etc..) at Covid time
From MAY2016 to 2019
EDAC Engineering pvt Ltd (SPIC
Groups)
Chennai.
From MAY2014 to APRIL2016
Abir infrastructure Private Limited,
Cuddalore.
From JAN2014 to APRIL
2014 Shut down projects
Maharashtra
From OCT2012 to
DEC2013 Efftronics
systems pvt ltd, Nagpur
division, Maharashtra.
From AUG2010 to OCT
2012 Efftronics systems
pvt ltd, Indian Railways,
Chennai division,
Tamilnadu.
As a project Engineer
HVAC 1lack class clean room construction site
Responsible of plant room power panel installation and control panel installation for all HVAC chiller and AHU’s installation, commissioning and testing.
Cable tray laying and LT cable laying termination control panel Termination Etc.
As a project engineer
MEP projects in construction site commercial Buildings and Residencies.
Responsible work in site all Electrical and plumbing and AC works and Automation wiring and installation of Sensor points etc. As a Electrical Contractor
Doing own building construction wiring with the help of 4 electrician EPC building hotels,shopping complex etc.
As a Electrical engineer
Responsible for electrical site In-charge Thermal plant construction and control room panel erection and substation maintaining and switchyard maintaining
All machineries and electrical panels HVAC supply connections maintains for 1000MW Thermal plant at neyveli
Responsible for all units electrical machineries maintenance (pumps, slip ring motors. Induction motors etc.)
Induction heating machines using for presser heating pipe lines in Turbine& Boiler sections for P91joints.
As a Electrical Engineer works in Industrial construction Projects Responsible for all electrical equipment and construction control panel room and switchyard
All machinery of industrial works maintaining. Panel board installation and commissioning.
As a Electrical Engineer Projects
Responsible for the building Electrical wiring and tray work and panel installation for the site buildings.
Installation Panel Boards.
As Electrical Engineer
Responsible for Site engineer in Maharashtra Division as Project engineer in Nagpur,
Sub-station construction in remote unit.
Installation Panel Boards and connecting Low Power 440kv cable jointing.
DC and AC Transmission line connections. Simulation monitoring system installations.
As Site Engineer
Responsible for Site work in Madurai Panel board commissioning and installations and Network cable jointing.
Responsible for site work installations and maintenance Contract No.Eff/12-13/HRD/CE/107 –440Kv FT/OT Cable Jointing and Networking.
RTU’S Networking.
Underground Cable with 110KM jointing communication . PROJECT HANDILING:
HVAC Clean room 1lak class in Hindustan aerospace division Bangalore.
Industrial projects Shopping complex and individual villas projects completed. Industrial projects handled in cuddalore.
Thermal power station control room power house building projects in Neyveli. Projects handled in Indian railways control panel installation and commissioning. COMPUTER EXPOSURE:
Diploma in computer since basics 2004 In Apetech Power-point, Auto-cad, C,C++,Java script.
Technical drawings, Auto Cad understanding and technically well known to use. Passport No : U7941883
Indian Driving License-TWO/FOUR WHEELER
Date of Expire: 25.05.2033
DECLARATION:
I here by declare that the information furnished above is true to the best of my knowledge. PLACE:TAMILNADU. Signature
DATE: N.THABRAZ