Post Job Free

Resume

Sign in

Electrical Engineer Project Management

Location:
Windsor, ON, Canada
Salary:
1
Posted:
April 21, 2024

Contact this candidate

Resume:

Samer Nabil El-Abassi. MSc.M, M.Eng, EIT, PMP,

416-***-****, ad46at@r.postjobfree.com,

Highlights of Qualifications

●Master of Science in Management- Entrepreneurship and Strategy. (Venture Life cycle and Diversity’s effects on it)

●Ontario Power Generation Nuclear site access security clearance Valid till 2024

●Project management certificate (University of Toronto-Toronto -Canada)

●Master of Electrical Engineering (Ryerson University-Toronto-Canada); registered with PEO as EIT.

●Foundation of management certificate (Pre-req of MBA) from Ryerson university, Toronto- Canada

●Experience with Electrical Engineering-Power generation, distribution, and control systems.

●Excellent hands-on and academic knowledge in economics and business principles.

●Experience gained in Power Generation plants, oil & gas refineries, and high-rise buildings.

●Experience in project management cycle (Initiation, Execution, Monitoring and Control, and Close Out)

●Experienced in preparing project scope, project charter, team charter, preparing schedule and budget, preparing project for bidding, and managing execution till closeout.

●Leadership, Strategic planning, Critical thinking, Problem solving, Goal oriented, work well under pressure and Team player.

●Computer Skills Excellent Excel, Word, and Power point skills, ETAP, AutoCAD 2020, Primavera 6, Microsoft Project.

●Management and database analysis software: SPSS, R, MYSQL

●Familiar with Programing languages Python, CSS, JavaScript, HTML

●Hold Canadian Citizenship – Able to relocate.

Education

●Web Development and Internet Applications- Algonquin College May 2023-Present

●Operations Management- Fanshawe College Sep 2022-April 2023

●AutoCAD-Centennial College April 2022-2022

●Master of Management Science- Ryerson University Sep 2020- 2022

●Project Management Professional -PMI Id -7481756 April 30, 2021

●Power System Design Certificate- George Brown College Jan 2020- June 2020

●Project Management Certificate –University of Toronto May 2018-Aug 2019

●Registered with the Professional Engineers Ontario as and EIT since March 2012

●Foundation of Management (Pre-req of MBA)-Ryerson University Sep 2011-Aug 2012

●Masters. Eng. Electrical Engineering from Ryerson University- Canada Sep 2010- Dec 2011

●IEEQB Ryerson University- Canada May 2009-May 2010

International Educated Engineering Qualifying Bridging program

●M.Sc. Power Engineering) Slovak Technical University. Sep1993- Jun1998

Thesis: Design of Synchronous Generator with Optimal Efficiency

●IELTS Academic: Band 7.5 2006

●Experience

Ryerson University May 2020- May 2021

Title: Research Assistant – Entrepreneurship and strategy

Worked with entrepreneurship faculty professors to extract information from raw big data “Crunchbase.’

Familiarize my self with entrepreneurship theories to design testing hypotheses relevant to research papers.

Used data analysis skills and tools to test hypothesis including SPSS, R, MySQL

Familiar and used many statistical research methods including mean, standard deviation, hypothesis testing, regression, analysis of variance (ANOVA), and correlation.

Write research reports including charts, correlation, and regression tables and explain statistical analysis finding.

Integrated Vision Management Consultancy Est-Abu Dhabi UAE Aug 2012- April 2018

Title: Operations Manager/ General Manager

Managed two training institutes and one Share holding corporation (Parent’s businesses).

(Vocational Training institutes for Electrical and Civil Engineering, Languages, Computer programming

& Business Administration)

●Design and manage business processes.

●Manage and supervise marketing strategies.

●Manage accounting divisions- prepare income statement and prepared accounting reports.

●Prepared finance plans and budgets

●Provided human resources recruiting and training.

●Managed shareholders equity and produced periodic reports for stakeholders.

●Prepared and executed communication plans.

Consolidated Contractors International Company Sep 2013-Nov 2013 Title: MEP Project Engineer

●Project: Four Residential Towers, Three offices/ Medical buildings, shopping mall, 15 Villas and a hotel (USD$ 567 million) -Algeria

●Designed and developed MEP department project management system, which includes progress management system, engineering design and shop drawings tracking management system, payment management system, subcontractor/s management system, and construction process management system.

●Trained Managers, engineers, and staff to operate and maintain construction-project management systems.

Ontario Power Generation: Jan 2012-July 2012

Nanticoke Thermal Generation Station- Canada- Ontario

Nanticoke Thermal Station is the largest power station of its kind in North America, with 8 Steam turbines installed to produce more than 1880 MW of power.

Project Leader/ Project Management Department / Asset management

● Co-ordinate and responsible for project documentation

● Arrange/Oversee contract work.

● Interface with the design team through periodic shutdowns to execute projects efficiently.

● Prepare specifications, assist in evaluation of tenders, and recommend awards of contracts.

● Provide periodic supervision for engineering and other technical staff.

● Supervise contract administrators.

● Prepare business case, risk assessment and analysis.

● Prepare project scope documents, assign, and order material for projects.

●Organize, control, and control different stages of existing projects.

●Lead Constructability meetings with vendors and contractors.

●Evaluate system performance and initiate preventive and corrective actions as required.

●Interface with design and project management teams to maintain plant systems.

●Support planning and execution of outage works.

●Perform systems troubleshooting and analysis to support operations teams.

●Prepared Schedules for three projects.

●Familiar with Engineering Change Control procedure (ECC).

●Used SAP to communicate with other departments including Maintenance and Purchasing to assign tasks and highlight problems as well as create work orders which are followed until completion.

●Attended yearly risk assessments meetings for power generation systems.

Consolidated Contractors International Company- UAE- Abu Dhabi

Title: MEP Section Engineer Oct 1998 -Jan 2009

Project: The Landmark Project (skyscraper 71 floors) US $ 383 Million – Abu Dhabi-UAE

●Responsible for coordinating all electrical design shop drawings for the project. (sld, load schedules, Equipment selection, Local authorities’ codes, and approvals’).

●Project coordinator (coordinating design drawings between all disciplines).

●Designed a progress monitoring system within the MEP section. (Excel)

●Managed and supervised 4 subcontractors. (Mechanical, electrical, plumbing, and vertical transport).

●Design and build 2500 KVA power substation.

●Acted as deputy MEP construction Manager.

Consolidated Contractors International Company

Title: Project Engineer UAE –Abu Dhabi

Project: Renovation of 7 floors building (Main office building) UAE- Abu Dhabi

●Management of 5 subcontractors (1-Civil, Décor, Fire Fighting, 2-Power distribution and generation, 3-Electrical lighting, small power, Security, 4- HVAC and Plumbing, 5-furniture,).

●Manage project design and schedule.

Consolidated Contractors International Company

Title: Electrical & Instrumentation Engineer-

Project: Balachoi Chagan Main Pump Station. (US $ 40 Million) Kazakhstan

●Managed a subcontractor for constructing a complete 110/6.6 KV switchyard.

●Responsible for installing, testing and pre commissioning of all electrical systems (power 6.6KV/440V substation, all power and control cabling for all field equipment’s, HV and LV cablings for field motors and controls centers, cathodic and Lighting & small power systems

●Overlooked installing and testing of all instrumentation works in the pumping station (Field instruments, including tubing works for pressure, temperature, and flow instruments. Instruments full cabling from field up to its related DCS, ESD, and F&G panels.

● Managed a subcontractor for the installation of full telecommunication and public address systems at the Pumping station.

Consolidated Contractors International Company

Title: Electrical & Instrumentation Engineer

Project: Karachaganak Process Complex, Oil plant (US $ 990 M) Kazakhstan

●In charge of Installing all main instrumentation cabling between Main Control Rooms and all field instruments interface Junction boxes (DCS, ESD and F&G).

●Responsible for Installing and testing of HV above ground cabling (33KV)

●Managed installing all, plant field, fire and gas system (including Cabling, Fire and Gas components, and related supports).

●Modify design and in charge of Installing a complete communication network and full plant public address system including fiber optic backbone, Main panels in telecommunication rooms and main control rooms.

●Checking all above systems for technical design errors and proposing new technical alternatives for the design prior installation starts.

Consolidated Contractors International Company

Title: Electrical Engineer

Project: GSM Network. (US $ 20 Million) Yemen

●In charge of checking design and modifying design, installing, commissioning, maintaining and troubleshooting: Power systems, including generators with timers and ATS’s, Cooling, Fire alarm and Security control systems of GSM network shelters

●Design and modify design: Generator alarms, Fire alarms and control system interfacing all UPS, Fire alarm, Cooling, Security, Main power, Temporary power and Telecom system.

●In charge of installing microwave and telecom antennas on masts and telecom towers

Consolidated Contractors International Company

Title: Electrical Engineer

Project: Onshore Gas Development Phase II (US $ 450 Million) Abu Dhabi- UAE

●In charge of Installing, testing, and commissioning: 415 V underground distribution cables for motors, motor control centers, motor operated and many other types of electrical equipment.

●In charge of Installing and pre-commissioning complete cathodic protection systems for underground piping, and lighting & small power systems, with their related field control panels.

●In charge of Installing and testing the complete Grounding network.

Consolidated Contractors International Company

Title: Plant Electrical engineer

Project: Ruwais Refinery Expansion Project for ADNOC (US $ 147 Million) Abu Dhabi-UAE

● Troubleshoot& maintain: Generators, electrical welding machines, tower cranes, motors & pumps.

●Design, install, purchase, maintain & operate: 3.3KV/415 V power network, containing synchronized diesel generators, transformers with Ring main units, main current circuit breakers and main circuit breakers, Sub Main distribution panels and distribution panels.

●Design, install, purchase and maintain: Lighting and small power system that includes flood lighting, tower lights, fluorescent lighting, and single phase and three phase power outlets.



Contact this candidate