Post Job Free

Resume

Sign in

Mechanical Engineering 1 8

Location:
Qibla, 14, Kuwait
Posted:
April 21, 2024

Contact this candidate

Resume:

Page * of **

CURRICULAM VITAE

Mobile No: +965-******** / +91-915******* 801-***-****)

E-mail : ad45yd@r.postjobfree.com. / ad45yd@r.postjobfree.com C. JOTHI BASU

OBJECTIVE:-

To be a part of result oriented professional team that provides challenging innovative work environment and opportunities for carrier and professional development. CAREER SUMMARY:-

26+ years’ experience in Construction, Commissioning Engineering and Technology in the field like Oil & Gas, Refineries, chemical plant, power plant, Piping, Cross country Pipelines and Tankages . EDUCATION :- BACHELOR OF TECHNOLOGY - MECHANICAL ENGINEERING DIPLOMA IN MECHANICAL ENGINEERING.(Pass out April 1996) ASNT LEVEL II in RT & UT

TRAINING : Managing supervision workshop Training (HSE) Permit To work System (PTW)

Fire & Safety,H2S BA, First Aider,

Certificate of Appreciation (KOC)-On Site Awareness Campaign. PMP (PMI) – Course Completed*

EXPERIENCE SUMMARRY :

S.no From To

No.of

Years Designation Company Name Country

1

Sept'

2022

TILL

DATE 1.5

Manager/Lead Engg- Mech

Tanks/Piping Construction

JEREH Oil & Gas Engineering

Corporation. (KOC-JPF5 Project) KUWAIT

2

Sept

'2020

Aug'

2022 2.0

Manager- Installation&

Testing/Commissioning

Trans Asia Pipeline Services

(KGOC/Technip-Offshore/ KOC ) KUWAIT

3

July

'2019 Aug’2020 1.1

Asst Construction Manager-

Mech/Pipeline/piping/Plant

Arabi Enertech KSC.( KOC-GPM

Project EK ) KUWAIT

4

Aug

'2017 June 2019 1.8

Construction Manager-

Mechanical/Piping

HeavyEng Industries Shipbuilding

Company- HEISCO/JML(KNPC-

GT5 ) KUWAIT

5

Oct

'2013 Apr '2017 4.0

Manager Construction-

Piping & Mech/ Tanks & plant

Larsen & Toubro Limited -L&T

(KOC Project WK & NK) KUWAIT

6

May

‘2012 Oct ‘2013 1.8

Dy.Manager/Superintendent-

Construction P/L & Plant

Consolidated Contractors Company

CCC (KOC Project WK) KUWAIT

7

Mar

'2011 Feb '2012 1.0

Construction Manager

Pipeline, Piping &Mechanical

Engineering Maintenance Company

EMCO UAE

8

Sep

'2010 Mar '2011 0.8 Dy. Manager -Project

Titanium Tantalum Products Limited

(TITAN) INDIA

9

Feb'

2009 Jun '2010 1.5

Dy.Manager/Senior Engineer

Pipeline /Piping

Punj Lloyd Limited –PLL( QP-

Project) QATAR

10

Jul

'2005 Dec' 2008 3.5

Area Manager-

Pipeline/piping/Mechanical

Reliance Engineering Associates

Ltd- (REAL&RIL) INDIA

11

Jan'

2001 Jun '2005 4.5

Sr.Construction Engineer -

Mech ABAN Constructions (P) Limited - INDIA

12

Jun

'1996 Dec' 2000 3.5

Asst Engineer/Coordinator

(Construction &Maintenance)

ONGC- C& M ( Thro' M/s Muruga

Agencies – Construction

&Engineering Contractor) INDIA

Page 2 of 10

EXPERIENCE PROFILE:-

(1) Company : JEREH OIL& GAS ENINEERING CORPORATION Current position : Manager/Lead Engineer -Construction Tanks/Mechanical/Pipeline/piping) Period : September 2022 to Till Date

Client : KUWAIT OIL COMPANY (KOC)

Project Description :

KOC-Jurassic Production Facility 5 (JPF-5) at North Kuwait for testing, processing and handling of wet and sour hydrocarbon wells fluids from Jurassic Fields. The JPF-5 shall be implemented on Build-Own-Operate(BOO)basis by Contractor with an option to buy back by Company. Oil production and export one of sweet and dehydrated rich gas by processing/handling of sour and wet gas reservoir fluids from NK Jurassic Fields. Produced Water Treatment unit, Sulphur Recovery Unit (SRU) along with associated utility / supporting systems are also part of this Facility. (KOC GP-II )

Role and Responsibility Include Construction & Commissioning activities :

Overall Coordination of Fixed cone roof Tanks Construction, Installation, Testing and handing over.

(Total 16 no’s -up to Diameter 18.4M x 13M height)

Overall Supervision and coordination at Site for Piping Related Piping Erection, Support Installation and Valve Erection and other Components Erections as per Isometric Drawings and P&IDs.(Refer GAD).

Over all Responsible for Off-skid and on-skid piping and Components installation as per vendor packages & Site condition modifications.

To attend and Coordinate Project (site) Progress Review meeting. Coordination of Shop Pre- Fabrication, Installation tracking piping materials and Piping supports as suitability.

Handling all Tanks & piping technical queries and investigating all field pipe/plates/attachements work related problems, including the drawing of field sketches when necessary.

Equipment Installation/Erection and alignment in Oil Section, GTU, SRU, Utility and Flare area ( 300 Major Equipment’s like Compressors, GTG, Steam Boiler, Stabilizer, vessel, Columns, incinerator, KOD and HP/LP Flare Stacks.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings in Brown field as well as Green filed.

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.(Like Spool tracking and Support Shifting, Issuing of Piping components and Consumables from Store and Check work front and coordinate with other disciplines)

Coordination and Supervision of Erection Equipment (Crane) and Utilizing of without Idle. Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.(Close Monitoring the progress meeting with Actual Plan, Project Schedule and Client Requirements)Close coordination with the clients throughout the execution of the project.

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness in the Structure and pipe sleepers

Carrying out final P&ID check of installed piping systems in the module. Preparation of “AS BUILT” drawings.

Preparation of field piping system HT Test packages,including system limit on P&ID and piping Isometrics.( Follow Up of punch work)

Page 3 of 10

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project, and also preparation for Startup completion activities

Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical and Tanks Construction and Commissioning /Startup activities. Coordinate with painting and coating crew to meet all quality related Qc inspection.

Ensure that all hydro test /Tanks Testing and reinstatement is to be done as per procedure. Ensure that all punch list items are resolved, client handover is satisfactorily concluded

Ensure work permits and Project HSE Requirements.

Coordinate the Scaffold works and maintain safe working practice at site.

(2) Company : TRANS ASIA PIPELINE SERVICES

Current position : Manager-Testing & Installation &Commissioning(P/L/Piping/Plant Operation) Period : September 2020 to August 2022

Client : KUWAIT GULF OIL COMPANY (KGOC)/ TECHNIP /KOC / KJO/L&T/PIL/ Project Description :

KOC-project- GC32 Trunk lines EGP caliper Pigging (ILI) for 6”,10”,14”& 20”LPand HP P/L from various manifold. KGOC GAS & CONDENSATE EXPORT SYSTEM -12” Pipeline from LFP AL Zour to Al Khafji ( KSA Offshore Pipeline 49 Km) and AL Zour LFP IP0.0 to IP 58 Onshore Pipeline 49KM long & IP58 to IP76 inside KOC -Slug catcher area pipeline 10KM.

KOC -Project in GPM - Upgradation and Condensate Export network EK1 through MECC. KOC -Project in NSGEP –through L&T for Decommissioning and Nitrogen Purging for BS132,Flowlines Tie ins. KOC Projects-NBTC/PIL- GC32 ILI & NRP KIPIC Pipeline Projects, Experienced in Onshore and Offshore Pipeline, Cross Country Pipeline Pigging-ILI EGP, UT with GPS mapping, MFL and Caliper run, Cleaning, Gauging, Hydrotesting and Nitrogen Purging and Chemical Cleaning(Include Acid Pickling, air blowing, air Drying, Hydro jetting and maintenance works ) .

(3) Company : ARABI ENERTECH K.S.C.,

Current position : Asst Construction manager – Pipeline & Piping Construction Period : July 2019 to August 2020

Client : KUWAIT OIL COMPANY –KOC.

Project Description :

UPGRADATION OF GAS & CONDENSATE NETWORK AT EAST KUWAIT AREA- I ( KOC- project). Various Sizes of Pipe lines from 4” upto 42”, Inclusive of TIE-IN, MANIFOLD and Demolition works. (KOC GPMT )

(4) Company : HEISCO( JML through )

Current position : Construction Manager – Mechanical/Piping /Mech. Equipment & Refineries Period : Aug 2017 to June 2019

Main Contractor : Tecnicas Reunidas -TR

PMC : AMEC FOSTER WHEELER

Client : KUWAIT NATOINAL PETROLEUM COMPANY -KNPC.

Project Description :

EPC&C OF GAS TRAIN # 5 PROJECT AT MAA REFINERY –KNPC. HEISCO execute a complete Piping/Tanks Packages for Pipe Rack and Unit Piping & Tanks works for GT5- KNPC project.

Page 4 of 10

HANDOVER/TURNOVER MECHANICAL COMPLETION ROLES & REPONSIBILTIES :

Preparing of Mechanical Completion Notification and Joint walkthrough plan for different Subsystem as per priority and site condition.

Closely monitoring the progress of each Subsystem with construction team for the completion as per plan date.

Monitoring and controlling of activity in Completions for different disciplines.

Conducting the meeting with Contractor & Construction team for expediting the work & follow-up/ close out the punches

Follow-up Daily Activities as planned and Coordinating with QC for the ITR’s without any delay.

Involved in Pre-commissioning activities and complete the Test packages as scheduled time.

Interacting with Engineering Team & Construction team for updating PEF’s, Drawings, Cable/Wiring Schedule, Layout drawings

Reviewing the report and follow with QC to close the pending ITR’s before MCN Completion.

Involved in Dossier preparation for all subsystem.

Daily Meetings with PMC & Clients to finalise and consolidate the punches.

Follow up and expedite the different field activity with construction, Pre-commissioning, Commissioning and Quality in order to achieve target dates.

Coordinating with Client relevant Area/ System representative for different milestone and expedite the constraints.

Role and Responsibility Include Commissioning Activities :

Overall Supervision and coordination at Site for Piping Related .Piping Erection, Support Installation and Valve Erection and other Components Erections as per Isometric Drawings and P&IDs.(Refer GAD)

To Attend and Coordinate Project (site) Progress Review meeting. Coordination of Shop Pre-Fabrication in SS, CS, LTCS AS piping materials and Piping supports.

Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings in Brown field as well as Green filed.

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.(Like Spool tracking and Support Shifting, Issuing of Piping components and Consumables from Store and Check work front and coordinate with other disciplines)

Coordination and Supervision of Erection Equipment (Crane) and Utilizing of without Idle. Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.(Close Monitoring the progress meeting with Actual Plan, Project Schedule and Client Requirements)Close coordination with the clients throughout the execution of the project.

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness in the Structure and pipe sleepers

Carrying out final P&ID check of installed piping systems in the module. Preparation of “AS BUILT” drawings.

Preparation of field piping system HT Test packages,including system limit on P&ID and piping Isometrics.( Follow Up of punch work)

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project. Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical and Commissioning /Startup activities Page 5 of 10

Ensure that hydro test reinstatement is to be done as per procedure. Ensure that all punch list items are resolved, client handover is satisfactorily concluded

Ensure work permits and Project HSE Requirements.

Coordinate the Scaffold works and maintain safe working practice at site. EXPERIENCE PROFILE:-

(5) Company : LARSEN &TOUBRO LIMITED

Current position : Manager Construction –Tanks -Mechanical/Piping & Pipelines Period : January 2015 to Apr 2017

PMC : AMEC FOSTER WHEELER

Client : KUWAIT OIL COMPANY (KOC) K.S.C.

Project Description :

NEW GC 30 (Gathering Centre ) PROJECT IN NORTH KUWAIT, EPC CONTRACT OF NEW GC 30 L&T Hydrocarbon executed a complete Engineer-Procure-Construct contract for a Gathering Center for KOC Role and Responsibility :

Overall Supervision and coordination of Tank Fabrication and Piping Related .Piping Erection, Support Installation and Valve Erection and other Components Erections as per Isometric Drawings and P&IDs.(Refer GAD)

Well Conversant with the Fabrication and Erection of Storage Tanks- Fabrication and Construction of EPC of the 12 nos Cone roof Tanks of diameter – (56.140 to 13.270 Mtr and height 17Mtr to 11.Mtr) for KOC GC30

Overall Supervision and coordination of Tank Fabrication and Erection, Support Installation and Valve Erection and other Components Erections as per Approved Drawings.

To Attend and Coordinate Project (site) Progress Review meeting (In-house with other Dept., Subcontractor representatives and Client review -Progress and HSE). Coordination of Shop Pre-Fabrication and Piping supports.

Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings

Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.(Like Spool and Support Shifting, Issuing of Piping components and Consumables from Store and Check work front and coordinate with other disciplines)

Coordination and Supervision of Erection Equipment (Crane) and Utilizing of without Idle. Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.(Close Monitoring the progress meeting with Actual Plan, Project Schedule and Client Requirements)Close coordination with the clients throughout the execution of the project.

Assist Design/Engg Department in solving Piping Modification and Technical Problems in the Field Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.

Carrying out final P&ID check of installed piping systems in the module. Preparation of “AS BUILT” drawings.

Preparation of field piping system HT Test packages,including system limit on P&ID and piping Isometrics.( Follow Up of punch work)

Page 6 of 10

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project. Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical and Tanks works .

Ensure that hydro test reinstatement is to be done as per procedure. Ensure that all punch list items are resolved, client handover is satisfactorily concluded

Ensure work permits and Project HSE Requirements.

Be a connection between the operating company and the Technology Licensee. Manage and work toward building a cohesive team for the most successful startup possible. Encourage open communication between all parties in the organization.

Attend meetings as required, typically there is a morning meeting to track progress. Answer and give guidance as required.

Issue written guidelines for planned task. The operating company can utilize these guidelines to develop the daily orders.

Manage the commissioning engineer and Supervisor.

Ensure that site processes are monitored and controlled to achieve safe and economical operation while developing all operators to their full potential

EXPERIENCE PROFILE:-

Company : LARSEN &TOUBRO LIMITED

Current position : Sr. Engineer-Piping/ Pipeline/Mechanical Period : October 2013 to December 2014

EPC Contractor : ALKHORAYEF GROUP COMPANY

Client : KUWAIT OIL COMPANY (KOC) K.S.C.

Project Description :

Construction of New Gathering Centre 16 (GC 16) at West Kuwait -KOC. Mechanical Package of Laying &Installation of Piping and Equipment works . Professional Experience :

EXPERIENCE PROFILE:-

(6) Company : CONSOLIDATED CONTRACTORS COMPANY W.L.L (CCC) Current position : Dy. Manager (Pipeline /Mechanical Project) Period : May 2012 to October 2013

Client : Kuwait Oil Company (KOC) K.S.C.

Project Description :

Construction of New Export Transit Pipelines from New BS 171 to AGRP at Mina Al Ahmadi. EPC contract of Laying &Installation of pipelines including Civil, Mechanical, Electrical & Instrumentation works .

Job Responsibilities: -

Overall supervision of the Planning,Constructional activity of Pipelines and Piping in EPC Projects.

Supervising & Guiding of Team Engineer/Supervisor/Foremen for various section of Pipe Stringing, Mainline Welding, Field Joint Coating, Cold Field Bending, Crossing (HDD),Trenching, Lowering in, Tie in Welding, Back Filling .

Execution and coordination of piping erection activities and pipe supports.

Execution and coordination of all hydro Static testing activities of Underground Pipelines & Above ground piping including Line History, Pipe book test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Continuous follow up & Coordination for the material to site.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures) Page 7 of 10

Identification the backlogs to reach the targets and seen that required actions to be taken.

Coordination and Technical guidelines to the Sub-contractors like HDD, Cold Cutting, Coating & Hydrostatic Testing

Manpower planning and mobilization, material planning and its flow control, & consumables arrangements,

safety coordination, attending safety and progress meeting, coordination with client, &permit systems. HYDROTESTING RELATED

Pipeline and Piping encompassing in Hydro testing and pre-commissioning activities.

Proven experience of working on pipeline Hydro testing and pre-commissioning.

Supervision of Cross country pipeline pigging, cleaning, gauging, Pre hydro test, hydro testing pre commissioning and commissioning

Having the Good Knowledge of Hydro testing and pre-commissioning of all types of hydrocarbon pipelines and associated systems. Knowledge about P&ID, PFD, Isometric and all relevant Piping equipment data sheet and SIS sheet, Pipeline Alignment Sheets, Hydro test Diagram and their Calculations.

Prepare the Hydro test Pack, Punch List and Approvals for Piping and pipelines pre-commissioning on all aspects.

EXPERIENCE PROFILE:-

(7) Company : ENGINEERING MAINTENANCE COMPANY (EMCO-EDAC-ASCON) Current position : Site Manager (Pipeline /Mechanical Projects) Period : March 2011 to February 2012.

Client : Abu Dhabi Gas Industries Limited (GASCO)

Project Description :

Replacement of 10” & 16” Gas Pipelines in BAB Area .EPC contract of Laying & Replacement pipelines including Civil, Mechanical, Piping, Electrical & Instrumentation works . Job Responsibilities: -

Overall supervision of the Planning,Constructional activity of Pipelines and Piping/Mechanical in EPC Projects.

Execution and coordination of piping/pipeline/mechanical erection activities and pipe supports.

Execution and coordination of all hydro/Pneumatic testing activities, including Line History, test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Continuous follow up & Coordination for the material to site.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Coordination and Technical guidelines to the Sub-contractors like HDD, Hot tapping,surveying ( Topographical &Geotechnical),Coating & Hydrostatic Testing .

Manpower planning and mobilization, material planning and its flow control, & consumables arrangements,

safety coordination, attending safety and progress meeting, coordination with client, &permit systems.

Be a connection between the operating company and the Technology Licensee. Manage and work toward building a cohesive team for the most successful startup possible. Encourage open communication between all parties in the organization.

Attend meetings as required, typically there is a morning meeting to track progress. Answer and give guidance as required.

Issue written guidelines for planned task. The operating company can utilize these guidelines to develop the daily orders.

Manage the commissioning engineer and operator.

Ensure that site processes are monitored and controlled to achieve safe and economical operation while developing all operators to their full potential.

Page 8 of 10

Coach the operators to complete the maximum possible amount of follow-up on their own when items are not as per normal operation. Be an approachable coach to those on your team. Help the operators learn and grow by enthusiastically sharing your knowledge with them and helping them solve problems.

Provide technical leadership and expertise to facilitate safe, reliable, and economical Operation of the site processes

COMMISSIONING & MAINTENACE ACTIVITIES INVOLVED :

A commissioning plan shall be prepared and shall provide for all activities associated with commissioning.

These activities include the following, Developing a design basis document.

Establishing the commissioning team and their responsibilities. Listing the systems involved.

Providing for project cost and schedule impact resulting from commissioning activities.

Providing a pre-functional test plan with procedures for testing each system.

Providing a functional performance test plan with system test procedures including deferred

Test procedures for each system, corrective action plan with procedures. Providing a commissioning documentation filing procedure.

Providing a commissioning tracking procedure.

Providing requirements for a commissioning final report.

Providing training modules for the operating and maintenance (O & M) staff on each system.

Providing a training plan and procedures providing a system manual for each mechanical system

Supervises directs and coordinates all activities of contractor personnel working in mechanical maintenance, repair, modification and installation of all stationary mechanical equipment in assigned units. Ensures that job/safety standards are followed. Supervises mechanical contract work including tank cleaning and repair contract/catalyst handling contract/hydro blast & chemical cleaning contract/on stream leak sealing plus scaffolding contract etc. for all stationary equipment.

Directs and controls all activities of contractor personnel for planned/breakdown/turnaround mechanical field maintenance and modification/construction for stationary mechanical equipment in assigned units. Inspects job sites to ensure specified procedures, standards, fire & safety regulations are followed

(8) Company : M/s TITANIUM TANTALUM PRODUCTS LIMITED Current position : Deputy Manager (Projects)

Period : September 2010 to March 2011.

Client : Babha Atomic Research Centre / KNRPC-Kalpakkam Project Description :

Fabrication and erection of piping subassemblies in RHA process chamber for project P3A In-cell SS 304L/316L Piping at KNRPC-Kalpakkam -Tamilnadu. Job Responsibilities: -

Planning and Execution of the fabrication of piping and pressure vessels and water storage tanks

Execution and coordination of piping and tanks erection activities.

Execution and coordination of all hydro/Pneumatic testing activities, including Line History, test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Coordination with HO for Sequential supply of materials.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Giving the technical guidelines to the subordinates and contractors.

Manpower planning and mobilization, material planning and its flow control, consumables

arrangements,

safety coordination, attending safety and progress meeting, coordination with client, permits. Identify

tools and test instruments required for performing various activities & prepare data sheet for their

procurement. Responsible for daily progress reports and close out reports.

(9) Company : M/s PUNJ LLOYD LIMITED

Current position : Dy. Manager (Construction-Pipeline) Period : February 2009 to July 2010

Client : M/s Qatar Petroleum

Page 9 of 10

Project Description :

Laying of 36" Twin gas pipe line 211km Ras Laffan to Meseaid, EPIC of Strategic Gas Transmission Pipeline Project (SGTP).in Doha, Qatar.

(10) Company : M/s Reliance Engineering Associates Ltd., (REAL&RIL) Current position : Area Manager Construction – Pipeline/Piping/Mech. Equipment & Refineries) Period : June 2006 to Dec 2008.

Contractors : M/s JSC Stroytransgaz – STG Russia

M/s L&T Ltd., & M/s Punj Lloyd Ltd.,

Project Description :

Laying of 48" gas pipe line 1400km Kakinada to Gujarat East West pipe line project (EWPL) including boost up compressor stations. Location : Spread II and Compressor Stations -2 (VJA) Job Responsibilities: -

Planning and Execution of the fabrication of piping/Pipeline and equipment installation .

Execution And coordination of piping erection activities.

Execution of all site activities for cross country pipeline as well as above ground piping.

Execution of HDD crossing and major road & railway and River Crossing.

Execution and coordination of all hydro testing activities, including pipe book, test pack and other documents.

Weekly and monthly achievements monitoring as per planning schedules.

Coordination with HO for Sequential supply of materials.

Monitoring and maintaining the quality as per's standards ( Spec and Procedures)

Identification the backlogs to reach the targets and seen that required actions to be taken.

Giving the technical guidelines to the subordinates and contractors.

Piping line check and cleaning (flushing, air/steam blowing) for Process Area, Utilities and Common Areas

Tightness Test and Nitrogen Purging/Inerting, Assist Pre-commissioning and Commissioning Activities

Make/prepare Operational Test Procedure (OTP)

Make/prepare Nitrogen Leak Test Packages with markup P&ID

Make/prepare detailed Nitrogen Leak Test Procedures

Offer to the Client for Witness/Inspection Pre-commissioning and Commissioning activities

Conduct Mechanical Running Test and OTP for all equipment

Conduct Nitrogen Leak Test and Purging/Inerting for all System/Subsystem

Assist for commissioning of Gas Turbines / Steam Turbines start up sequence, load up to base load, shutdown sequence.

Company : M/s Reliance Engineering Associates Ltd., (REAL) Designation : Lead Engineer (Mechanical/Piping)

Period : July 2005 to June 2006.

Project Description:-

Fabrication and erection of piping for FCCU and COKER Unit, Revamping pre shutdown and shutdown activities, at Reliance Industries Ltd., Jamnagar, Gujarat.

Job Responsibilities:-

Execution and coordination of piping erection activities at site as per IFC.

Fabrication and Erection of the pipe support.

Coordination for testing and commissioning of piping.

Co orientation with material management for sequential supply of material.

Giving the technical guidelines to the subordinates and contractors.

Prepare all final documents. Piping line check and cleaning (flushing, air/steam blowing) for Process Area, Utilities and

Common Areas

Tightness Test and Nitrogen Purging/Inerting, Assist Pre-commissioning and Commissioning Activities

Make/prepare Operational Test Procedure (OTP)

Make/prepare Nitrogen Leak Test Packages with markup P&ID

Make/prepare detailed Nitrogen Leak Test Procedures

Offer to the Client for Witness/Inspection Pre-commissioning and Commissioning activities Page 10 of 10

Conduct Mechanical Running Test and OTP for all equipment

Conduct Nitrogen Leak Test and Purging/Inerting for all System/Subsystem

Assist for commissioning of Gas Turbines / Steam Turbines start up sequence, load

up to base load, shutdown sequence

Ensure Safety, Hazard analysis, Pumps, and Compressors,Piping,Process Control Systems, Electrical Systems Functioning.

Brine and sea Water Systems and Treatment,

Process Utilities, Relief Valve and Flare Systems controlling

(11) Company : M/s ABAN CONSTRUCTIONS (P) LTD

Designation : Sr.Construction Engineer- Mechanical/Pipeline/piping Period : Jan 2001 to June 2005.

Project Description :-

1.Laying of cross country pipe line various sizes like 12" to 40" and construction of boost up station and valve stations above ground piping.

2.Fabrication and Installation of Oil and Waste Water Storage Tank Project in GSPL and Bharuch Equa and Aqua –Disposal Project

3.Submarine pipeline (48”) project offshore



Contact this candidate