AFZAAL ARSHAD

Senior Land Surveyor

Cell #. +974-********

E-mail: ad44ni@r.postjobfree.com

Objective:

Desire the Position of Senior Land Surveyor in a Major Company. A Highly Successful Land Surveyor with over 13 years of experience in managing all land surveying activities and staffing; responsible for ensuring best practices are followed and quality assurance goals are obtained; as well as participate in development of best practices as related to land surveying.

Summary:

More than 13 years of Land Surveying experience.

Plan, coordinate and supervise the work of several field survey crews.

Instruct survey crews in the field layout of the more difficult construction projects, in replacing lost survey monuments, in setting property corners on city land from legal descriptions and title information, and in performing other aspects of survey work.

Serve as the liaison between public utilities, contractors, and subcontractors during construction to provide continuity in the assignment of survey crews.

Attend pre-construction conferences to convey information of contractors' intent to field crews and the engineering design, inspection, and materials sections.

Coordinate work assignments with the schedule of the contractor to ensure timely completion of projects.

Review and analyze work methods to increase efficiency and productivity and provide input into the writing of performance standards.

Keep detailed and accurate records of crew activities, survey data.

Study operational problems and recommend changes.

Report on events and activities which may affect operations.

Review blueprints and legal deeds to survey areas in detail.

Determine existing and proposed right-of-way.

Oversee the measurement of completed construction work to determine "as-builts" quantities for the construction project, which are used in computing the cost of the project.

Work with contractors in providing survey data for expediting construction projects. Education:

F.A (Faculty of Arts)

Board of Intermediate and Secondary Education, Rawalpindi

S.S.C/Matric

Board of Intermediate and Secondary Education, Rawalpindi.

Diploma of Survey

Computer & Technical Literacy:

Diploma of Auto CAD, MS Office.

Drafting and Drawing Work on Auto CAD.

Auto CAD 2015, Auto CAD Civil 3D 2015.

Lis CAD, GIS.

Data preparation for Building, infrastructure, As-Built drawing, Topographic Drawings,

Leica GPS, Leica Total Station. Digital Level, Auto Level, Sprinter Digital Level, Technical Expertise:

Leveling & Digital Precise Leveling.

Construction of villas, apartments & Mall Survey Work.

Eriction & Steel Structure works, Land Scaping Work (Earth Work)

Survey of Infrastructure works (Tunnels, Roads, Services Lines i.e. Sewer, Storm, Electrical LV, HV, Telephone Optical Fiber, Chilled water, Irrigation, Water Supply, )

Project Drawings (Editing, Shop Drawings Preparation, Proposals making, As-built) & Data Preparation

& Processing for Survey.

Observation of X-Section and Longitudinal Survey Earthwork volume calculation, Contour Drawings, Sections and Profile Drawings (cross Sections Profile, Longitudinal Sections Profile)

Static Survey & Real time kinematic Survey works.

3D scanning of industrial and construction sites along with data preparation, Monitoring as well.

All Kinds of Survey i.e. Reconnaissance Survey, Cadastral survey, GIS Surveying (Geographic Information System), Traverse Networking, Topographic Survey & Topographic Drawing, Town Planning.

Work Experience:

July-2018 to Till date

ACT(Advance Construction Tecnology-Qatar

(Bahadir Construction Engineering ContractingTrading-Qatar) Project Name: Dukhan Air Base

Responsibilities:

Runway,Taxiway,Apron work and Air ground lights setout storm water drainage, sewerage, potable water,Tse,Irrigation Electric cable, streetlights cable and telephone ducts.

Excavation, formation, pipe laying, surround backfilling and standard tests for various services.

Earth works, formation, sub base, and asphalt work for roads in highly congested site connecting and serving the many various to buildings.

Marine Works Including Quay Wall, Crown Wall, Break water and Street Light, Electric and mechanical Survey and Piling.

Checking the horizontal and vertical alignments of construction and precast works.

Maintain calibration status of survey instrument.

Prepared survey report for each completed work for approval.

Supervising of the Site works.

Co-ordination with consultants and government organizations.

Prepared as built drawing.

June-2016 to July-2018

HBK Contracting Company –Land Surveyor

Project Name: Road and Infrastructure in Bani Hajar North Phase 1, 2 Packages

Responsibilities:

Road related matters for storm water drainage, sewerage, potable water, TSE, IRRIGATION Electric cable, streetlights cable and telephone ducts.

Excavation, formation, pipe laying, surround backfilling and standard tests for various services.

Earth works, formation, sub base, and asphalt work for roads in highly congested site connecting and serving the many various high-rise buildings.

Marine Works Including Quay Wall, Crown Wall, Break water and Street Light, Electric and mechanical Survey and Piling.

Checking the horizontal and vertical alignments of construction and precast works.

Maintain calibration status of survey instrument.

Prepared survey report for each completed work for approval.

Supervising of the Site works.

Co-ordination with consultants and government organizations.

Prepared as built drawing.

YUKSEL CONTRACTING COMPANY

Projects: SALWA ROAD AND LUSAIL CP4B

Designation: Land Surveyor

I worked with this company As Land Surveyor from March -2011 up to July2016. In this projects I worked in pipe line underpass bridges and all type of utilities.

Responsibilities:

I am working as Land Surveyor / Surveyor Coordinator.

Helping technical Dept. to Process drawings and proposals.

All survey work execution and survey job management.

All survey drawings drafting and data preparation as per site requirements.

All earth work mass excavation quantity calculation and assisting Quantity survey Dept.

Assisting construction team in planning for execution of all works. Establish Control points with reference to bench Marks & other survey data.

All setting out with reference to approved Control Point & approved project drawings (building, kerb stone, sewer line, ducts, water main, telephone line, electrical line, street light and landscaping).

Mechanical (steel erection, anchor volt, pipe, gas tank, water tank etc., other survey work.

Marking of Anchor bolts and dowels for precast building works with highly precision.

Installments of precast slabs and walls according to required levels with high precision.

Checking the horizontal and vertical alignments of construction and precast works.

Maintain calibration status of survey instrument.

Prepared survey report for each completed work for approval.

Supervising of the Site works.

Co-ordination with consultants and government organizations.

Prepared as built drawing

Touch Stone (Pvt.) Ltd.

Projects: Development of WAPDA Housing Society

Designation: Land Surveyor.

I’d worked with this company As a Land Surveyor from May-2009 up to 15th Jan-2011. This project includes houses, infrastructure (Roads, Services).

Responsibilities:

Setting out and leveling.

Block work, Structural Slab, Column layout.

Building work, Steel Structure work, Infrastructure work (Roads, Services).

Topographic Survey, X-Sections, Profile survey, As-Built, Static Survey, RTK Survey.

Fixing of control points.

Plotting of cross section and earth work volume calculation.

Fixing of control points and taking ground levels.

Layout of roads according to curves and slopes. Setting out of Street lights. Strength:

Hard working and enthusiastic with ability to learn quickly, work independently as well as with team.

To establish and maintain a good communication network with people.

To learn quickly from any given work environment. Special Skills:

Administrative Skills, Management Skills(Team & Work), Leadership skills, Good Coordination Skill (Coordination with Consultant and Project, Project Manager, Construction Managers, Site execution teams, QA/QC, & Technical Department on Drawing related problems & Issues, Planning & Reporting). Personal information:

Marital Status Single

Nationality Pakistani

Visa Status Residence Visa Qatar

Current Location Doha, Qatar.

E-mail ad44ni@r.postjobfree.com

Languages English, Arabic, Urdu, Punjabi, Hindi (Spoken, Read, Written)



Contact this candidate