Post Job Free

Resume

Sign in

Senior Project Engineer

Location:
Miri, Sarawak, Malaysia
Posted:
April 18, 2024

Contact this candidate

Resume:

* * * * *

Kho Wei Haw **th April ****

Career Summary

Over 18 years as professional skill in oil and gas industry, FEED, EPCI & MMO. Specialized in oil & gas project management, construction & maintenance. Broadly experienced with hands on of green field and brown field scopes along with management skill for projects in Singapore, Malaysia, Thailand, Indonesia, Brunei and India. Experienced working with clients like Sarawak Shell Berhad, Brunei Shell Petroleum, Brunei LNG, Brunei Methanol Company, SEA Hibiscus (Malaysia), PTTEP (Thailand), Chevron (Thailand), TOTAL (Indonesia) and ONGC (India) A degree holder in Bachelor of Engineering in Mechanical Engineering. Specialized in project and turnaround management in oil & gas construction & maintenance, hook up commissioning project & rejuvenation campaign. Heavily involved as turnaround and project lead role for Brunei Shell Petroleum (BSP) ORCM Turnaround, verify and giving input in work scoping, working with work pack and job carding team to derive and minimize man hours discrepancy and increased construction feasibility and efficiency for shutdown scopes. Ensuring manhours and man power relativity to the closest accuracy prior to planner’s incorporation into the integrated planning. Presentation of scope of work, critical red par activities, integrated planning of activities, and shut down critical path activities review to client. Scope readiness review & presentation. Hosting & co-hosting scope optimization & Integrated Planning on Paper (IPOP), Hazard Identification (HAZID) participation, offshore kick off meeting and client offshore asset crew scope briefing (Roadshow). Preparation and shutdown progress reporting, monitoring and presentation to client’s and own company’s higher management during turnaround review board and identifying potential threats. Preparation and presentation for BSP HAZID. Monitor fabrication status of materials (tracking) for timely offshore execution. Led kick off meeting for shutdowns, briefing and ensuring offshore construction superintendent and crew understand the scopes. Raised site technical queries, incorporating additional man hours and materials required and execute accordingly. Heavily involved in offshore construction scopes like various sizes of subsea gas pipe lay setup and method, subsea cable lay, subsea survey and subsea pipe span rectification, platform jacket lift, lay down & piling, topside platform heavy lift & installation, structure modification work & bridge installation, complete with riser, subsea spool and j-tube installation. Worked closely with and immense hours of involvement in subsea (topside to topside) pipeline pre-commissioning work from flooding, pigging to purging. Leak test and pressure test experience for topside lines to subsea pipelines (topside to topside and topside to subsea tree). Worked closely with and exposed extensively to subsea operation like diving (air & SAT) and ROV. Experienced with work barge anchor plan and lifting plan for offshore and onshore execution and installation setup. Familiar with lifting gear selection and arrangement, pre rigged or post rigged. Equipment preparation, load out and back load. Project and maintenance, conventional and specialized material load out and surplus back load complete with storage preservation.

In charged of pipe spool, riser and structural pre fabrication work, complete with load out, sea fastening fabrication and installation as required. As company representative for subsea pipeline production.

2 P a g e

Handled inspection coordination for fleet of boats, tug boats, and barges, totaling up to 104 counts of inspection per annum, including marine spread towing gear preparation & inspection, marine spread planning and documentation preparation, deficiency list and close out report preparation for all marine spread. Marine spread inspection as company rep for Marine Warranty Survey (MWS), Marine Suitability Survey & Offshore Vessels Inspection Database (OVID) audit as per client requirement (TOTAL Indonesia). Had mild experience as vessel operation supervisor for a local marine company for project based in India. Portrayed strong people relationship, and possess good judgment & critical decision- making skill. Completed phases of preparation, execution & closing out, meet client’s and company’s milestone requirement in safe manner. Improved overall company systems in manning, materials tracking/ traceability, and product engineering data optimization. Reviewed requirement for new rejuvenation project bidding along with cost and job scope estimation in requirement of client on fabrication.

3 P a g e

Professional Experience

DAYANG ENTERPRISE SDN. BHD. (MMO - Malaysia)

Project Lead

Client Projects – SF30 SEA HIBISCUS (SEAH),– 2023 - Current As a project lead/ Senior Project Engineer for a Malaysia (Miri) local company Dayang Enterprise Sdn. Bhd. SF30 Waterflood Phase 2 – Hook up commission work scope for increasing SFJT-C platform capacity to gear towards supporting new SFJT- D platform with wells drilling to be commissioned upon completion.

• Manages SF30 Waterflood Phase 2 project under package SFJT-C & SFJT-D, leading a team of work pack engineers, MTO + drafting engineers, planning engineer & Technical assistant.

• Working with operation during preparation and execution.

• Monitoring project deliverables and progress reporting.

• Ensures and monitors costing in accordance to company’s and client’s interest.

• Reviewing and identifying scopes upon AFC receipt.

• Identifying scopes under cost plus.

• Manages and optimizes limited resources.

• Manages moving target milestones.

• Delivers project activities timelines on the fly to fit project need for changes.

• Works with planning engineer to develop detailed planning, manpower and resource loading.

• Ensures project conforms to client contractual requirement.

• Coordinates project management team movement for project need.

• Coordinates site work scoping & site stringing offshore and 3 rd

party

fabrication yard.

• Takes part in reinstatement/leak test packages.

• Takes part in job carding & work packing.

• Involved in offshore lifting plan, lifting methods, procedure, proposal, producing 3D Sketchup drawing, conducting 3D clash check and lifting sequence.

• Coordinates HSE plan, working in tandem with client for all HSE required documents like Site Safety procedures

• Coordinates QAQC document compilation and approval. 4 P a g e

Foosha Development Sdn. Bhd.

Managing Director

Project – Living Lab Condominium, Miri, Sarawak. July 2020 – 2023 As a managing director for a housing development company in Malaysia. Project preparation for 93 units of themed condominium.

• In charged from acquisition of project until project approval by city council, ready for site execution.

• Decides on company financial and admin direction.

• Evaluated project costing according to projected financial cashflow.

• Handled company financial account.

• Participated in project construction planning.

• Participated in layout drawing and engineering.

• Achieved architectural, engineering and structural drawing milestone with consultants.

• Participated in interior design and marketing planning.

• Involved in planned construction methodology.

• Involved in project SPA approval.

• Achieved city council building plan approval.

• Completed formwork 3D Sketchup drawing of showroom for marketing. Project – All other residential development projects, Miri, Sarawak. July 2020 – 2023

As company rep for a housing development company in Malaysia. Project acquisition for all potential development in Miri, Sarawak, Malaysia.

• Studied potential vacant land, including valuation of properties nearby, locality, surrounding infrastructure, area points of interest, proximity to city center, road access to lot of interest and development type.

• Searching of land owners of individuals & companies, proposing and discussing joint venture.

• Proposal of development type according to feasibility of land and its locality.

• Prepared letter of understanding and interest for land owners.

• Prepared and proposed development plan for company and landowners.

• Proposed, coordinated with relevant land owners, with city planning and land

& survey department, applied and requested for right of way, for road accessibility.

5 P a g e

Shellstown Development Sdn. Bhd.

Project Director

Project –Taman Jelita Phase 1, Tambalang, Tuaran, Kota Kinabalu July 2020,– May 2023

As a project director for a housing development company in Malaysia. Project completion for 68 units of terrace dwellings.

• Involved from acquisition of project until construction and completion handover to clients.

• Achieved capital fund acquisition.

• Completed formwork 3D Sketchup drawing for on-site construction execution.

• Completed 3D Sketchup interior drawing for rendering, for marketing purpose.

• Participated in formwork engineering and acquisition.

• Reviewed company financial account.

• Participated in sales and marketing monitoring and follow ups.

• Involved in construction methodology.

• Units handover to all customers.

• Project completion with no loss time injury.

6 P a g e

BUMITRA ENGINEERING & SUPPLY SDN. BHD. (MMO -

Brunei)

Acting General Manager / Sales & Service Engineering Manager Client Projects - BRUNEI SHELL PETROLEUM (BSP), BRUNEI LIQUID NATURAL GAS (BLNG), BRUNEI METHANOL COMPANY (BMC), AMEC FOSTER WHEELER, BRUNEI GAS CARRIER, BERAKAS POWER

COMPANY, SHELL AVIATION – 2016 - 2020

As a sales and service engineering manager, for a Brunei local company Bumitra Engineering & Supply Sdn. Bhd.

• Established support as local supply hub for light aviation industry (SAV & Gurkha 7

th

Flight Battalion), as the one and only provider in the country.

• Proposed and establish direct service for supply agreement with BSP on EFA product.

• Initiated and lead supply deal of EFA product (sealing product) with Amec Foster Wheeler, Brunei Gas Carrier, Brunei Methanol Company & Berakas Power Company.

• As client interface to cater for equipment (control valves, gaskets, etc) servicing.

• Provides trouble shooting and data supports to client during shutdown/turnarounds.

• Oversaw sales and service engineering solutions for BSP, BLNG and BMC as anchor clients.

• Improved overall company systems in manning, materials tracking/ traceability, and product engineering data optimization.

• Improved company expenditure and cost effectiveness.

• Expanded company facilities and asset value.

• As advisor for the company directors in overall aspects.

• Revisited company contract/agreements from vendor principles in order to achieve mutual benefits on terms and conditions.

• Improved company profit margin and sales value by overhauling sales procedure.

• Increased company revenue and profit generation by renegotiating sales agreement.

7 P a g e

HOMAN SDN. BHD. (MMO/EPC - Brunei)

Project Engineer

On shore based, as a project engineer handling mainly oil and gas related matters, reviewing, writing up documents, preparation and meeting with client. Bidding for oil & gas related scope and BSP projects. Prepared company quality manual and quality procedures. Company profile revamp. BRUNEI SHELL PETROLEUM (BSP), Rejuvenation project (EPC – Brunei) – 2016

o Reviewed requirement for new rejuvenation project bidding. o Cost and job scope estimation in requirement of client on fabrication. BRUNEI SHELL PETROLEUM (BSP), Helideck scope (MMO – Brunei) - 2016 o Reviewed and revised helideck skidding procedures to conform to client requirement for scope bidding.

o Meeting with clients to understand and follow up on helideck refurbishment scope bidding.

LANOTEC (Australia) – Protective coating system

o Preparation for new product introduction into the country. o Meeting client and coordinating product introduction. o Conducted product introduction and presentation. o Contributed in product expansion plan.

o Closed target sales within objective period.

8 P a g e

AKER SOLUTIONS SDN. BHD. (MMO - Brunei)

Turnaround Lead

Onshore based managing and leading a team of project engineers, planners, material and fabrication members for planning, monitoring, and preparation for offshore installation (preventive maintenance and rejuvenation project scope), involving people & project management skill for Brunei Shell Petroleum Turnaround. Familiar with Shell working procedure and standards.

BRUNEI SHELL PETROLEUM (BSP), South China Sea, Brunei West Field

• West Area 2 Turnaround Preparation Phase – 2016

Over 200,000 manhours earned, over 400 Work Order Number (WONs)

• West Area 2 Non-Turnaround as Co Lead for Preparation Execution – 2015

• West Area 2 Turnaround Preparation Execution & Closeout – 2015 Over 100,000 manhours earned, over 250 WONs

o Recognized as most successful Turnaround executed safely (West Area 2 AMCX06 combined with Area 3 FACX04) by BSP Asset Director, BSP West Manager, and BSP West Operation Manager.

o Performed as the first integrated turnaround with challenging conditions, new EDPMO requirement & concurrent turnaround with overlapping BBJV (B Block Joint Venture) Turnarounds

o First Turnaround to utilize CAR (Critical Activity Review) tool to review work scope timeline.

o First successful turnaround involving co-location of client – contractor (BSP – Aker)

o Contributed as a key team player in turnaround improvement.

• West Area 2 Turnaround Preparation, Execution & Closeout – 2014 Over 150,000 manhours earned, over 300 WONs

o Recognized as successful & performing Turnaround executed safely (West Area 2 AMCX06) by BSP Managing Director, BSP West Operation Manager, Aker Solutions Brunei and Global Directors & Senior management. o Contributed as a key team player in turnaround improvement.

• West Area 2 Turnaround Preparation, Execution & Closeout – 2013 Over 100,000 manhours earned, over 250 WONs

9 P a g e

o Led a team of project engineers, planners, fabrication and material team members as a task lead for BSP offshore west area 2 Turnaround preparation and execution works in the new BSP – Aker Organization (ORMC).

o Portrayed strong project and people management skill, side by side with client’s turnaround and project coordinators. Also involves good judgment & critical decision-making skill.

o Completed phases of preparation, execution & closing out, meet client’s and company’s milestone requirement in safe manner.

o Ensured deliveries as optimized by company & client annual target vs goal feasibility.

o Scope readiness review & presentation. Hosting & co-hosting scope optimization

& Integrated Planning on Paper (IPOP), Hazard Identification (HAZID) participation, offshore kick off meeting and client offshore asset crew scope briefing (Roadshow)

o Provided full support during offshore execution in term of resources, technical & site queries solutions.

o Coordination between project engineers, planning, jobcarding, logistic, materials, fabrication and offshore operation departments during execution and preparations stage according to client’s IAP (Integrated Activity Planning). o As a focal point between clients and higher management for reporting and all required coordination.

o Conduct meetings with clients and sub-contractors (business partners) to close up undesired gap in term of resource provision.

o Progress reporting and presentation to client’s and own company’s higher management personnel during turnaround review board and identifying potential threats.

o Coordination work utilizing Aker Solutions – Method Integrated Project System

(MIPS) and AkIMSTM

o Ensure full guidance to lead & raise potential personnel as future leaders. 10 P a g e

Task Lead West

Onshore based, managing and leading a team of project engineers for planning, monitoring, and preparation for offshore installation (preventive maintenance and rejuvenation project scope), and offshore execution involving project management skill. Riser repair method statement preparation. Familiar with Shell working procedure and standards.

BRUNEI SHELL PETROLEUM (BSP), South China Sea, Brunei West Field

• West Field Area 1, Area 2 and Area 3 Turnaround Preparation & Execution

- 2013

o In charge of leading a team of project engineers for all three BSP offshore west field areas Turnaround preparation and execution works. o Responsibility that heavily involves strong project and people management skill. o Coordination between project engineers, planning, jobcarding, logistic, materials, fabrication and offshore operation departments during execution and preparations stage.

o As a focal point between clients and higher management for reporting and all required coordination.

o Conduct meetings with clients and sub-contractors (business partners). o Progress reporting and presentation to client’s and own company’s higher management personnel during turnaround review board and identifying potential threats.

o Involved in new vendor equipment data enquiries, selection and proposal process. o Preparation and presentation for BSP IPOP’s (Implementation Project On Paper) o Preparation and presentation for BSP HAZID (Hazard Identification) o Coordination work utilizing Aker Solutions – Method Integrated Project System

(MIPS) and AkIMSTM

• Riser Repair Method Statements (Procedures)

o In charged of preparation of riser repair method complete with AutoCAD schematic and rigging arrangement setup.

11 P a g e

SKSWOOD SDN. BHD. (MMO - Brunei)

Project Engineer & Construction Engineer

Onshore based and occasionally offshore, planning, monitoring, preparation for offshore installation (preventive maintenance and rejuvenation project scope) involving project management skill. Lifting plan preparation, job carding manhours for offshore execution, and package preparation. Familiar with Shell working procedure and standards.

BRUNEI SHELL PETROLEUM (BSP), South China Sea, Brunei, East & West Field (2012)

• AMPA-09 Winter Campaign (Sept – Nov) Phase 1 and 2 - 2012 o In charge of Ampa-09 New HP-Compressor winter campaign scopes including planning, monitoring, and preparation for offshore installation. o Offshore work barge and complex visits for work progress check and monitoring. o Monitor fabrication status of materials for timely offshore execution. o Meetings with client troubleshooting problems and execute planning during brainstorm session to ensure smooth offshore execution. o Understands barge movement, crew and equipment mobilization in accordance to scopes requirement.

o Coordination works with other (multiple) BSP contractors to accommodate into offshore execution.

o AMCP09 Piling monitor and coordination work for HP Compressor deck extension ( Fabrication – Load out – Execution)

o Offshore on board work barge Swiber Victorious for site visit and meeting discussion.

o Offshore on AMPA-09 complex for site visit and executing preparation work. o Offshore on board work barge Swiber Victorious for pre-job discussion & preparation and supervising execution.

o Vendors’ equipment and personnel mobilization coordination. o Additional job card preparation and pre-scaffolding scope preparation.

• AMPA-09 2013 Scope Preparation

o In charged of Ampa-09 New HP-Compressor 2013 scope preparation namely job card preparation for issued package.

12 P a g e

• AMPA-09 New HP-Compressor June Campaign 2012

o In charged of Ampa-09 New HP-Compressor scopes including planning, monitoring, and preparation for offshore installation. o Planning includes fabrication and load out of materials for timely offshore execution.

o Tedious monitoring and troubleshooting problems of New HP-Compressor deck extension fabrication in order to meet target completion date. o Constant meetings and conferences with client troubleshooting problems and brainstorm session as required ensuring smooth offshore execution. o Attended Hazard Identification (HAZID) sessions. o Meeting client requirement.

o Material tracking, monitoring and issue load out instruction. o Success of HP-Compressor deck extension fabrication and effort was acknowledged by BSP Project Manager.

• Lifting Plans

o In charged of major lifting plan, assisting other Project Engineers for various scopes of work, namely lifting of objects above 5 Tons of weight and around live facilities, complying and familiar with BSP Lifting and Hoisting standards. o Lifting plan includes advice /decision of barge/crane placement, drafting of lifting schematic, procedure preparation and rigging arrangement design & calculation based of available resources.

o Meeting with client and Technical Authority for lift plan completion and approval. Troubleshooting problems and brainstorm session as required. o Attended Hazard Identification (HAZID) sessions. o Effort as acknowledged by SKSWOOD Operation Manager. o Detailed C.O.G. calculation for complicated lift/ or complex shaped items. o Rigging arrangement design and calculation for complicated lift/ or complex shaped items.

• Concurrent construction engineer main scopes

o Job-carding using M-POWER

TM

for offshore man hours allocation as per BSP

requirement and standards, complete with package preparation. o Able to read and understand structural drawing, PEFS diagram and ISO drawings

– conveying details into job card format.

o Offshore site survey on CPW07 (on board Lewek Lifter jack up barge) for demolition scope on job carding purpose and lifting plan for Chemical Injection Skids.

13 P a g e

Nippon Steel Engineering & Construction (FEED, EPCI – Singapore/Indonesia/Thailand)

Field Engineer – Project Engineer

Offshore and onshore (including line pipe coating yard) based, for planning, monitoring, preparation, load out and execution of offshore installation (including field troubleshooting, calculation and planning). As a company representative in line pipe coating yard.

TOTAL (Indonesia) Makassar Strait, Indonesia, South Mahakam Field (2011).

• South Mahakam – Senipah Phase - Project (2011 - 2012) As load out rep based in P.T. Nippon Steel Batam, Batam Indonesia. Pre-Installation and preparation phase including:

Project Engineer Scope:

o Handling coordination for a fleet of 34 boats, tug boats, and barges, totaling up to 104 inspections.

o Marine spread towing gear preparation and inspection. o Pre-installation survey preparation.

o Marine spread planning and documentation preparation. o Deficiency list and close out report preparation for all marine spread. o Marine spread inspection activity planning and coordination. o Marine spread inspection (as company rep), Marine Warranty Survey

(MWS), Marine Suitability Survey & Offshore Vessels Inspection Database (OVID) audit as per client requirement.

o Offshore pre-installation survey on board M/V Voyager (Seascape Survey).

Field Engineer Role:

o Pipe lay Analysis (stress strain on pipe bend and sag) and documents preparation.

14 P a g e

PTTEP (Thailand) Gulf of Thailand ARTHIT & BONGKOT field (2011) As a field engineer. Familiar and experienced with PTTEP(Thailand) standard requirement in compliance to offshore installation and pipeline coating production. PTTEP Gulf of Thailand ARTHIT Field, Offshore installation works with Nippon Steel work barge K1 (Kuroshio 1) including:

• PTTEP Phase 2 - Arthit 1D Project (2011)

Offshore preparation for as built documentations, provide offshore technical solution.

Produce and compile as built dossier upon completion of offshore installation scope.

Pre fabrication, Loadout and Installation scope involved includes: o Pigging and hydrotest of GL16 12” pipe.

o GL15 and GL17 16” pipe lay.

o 12” Gas pipe line as built survey.

o 12” Gas pipe line free span rectification.

o 16” Pipe line crossing sleepers installation.

o 16” Spool metrology and fabrication.

o 16” Gas pipe line flooding and subsea tie in.

o Gas unmanned platform installation.

o 16” Gas pipe line free span rectification.

o 12” Riser hydrotests.

o Demob of offshore installation barge.

PTTEP Gulf of Thailand BONGKOT Field, Offshore installation works with Nippon Steel work barge K1 (Kuroshio 1) including:

• PTTEP Phase 2 – Bongkot 3H4A Project (2011)

Offshore preparation for as built documentations, provide offshore technical solution.

Produce and compile as built dossier upon completion of offshore installation scope.

Pre fabrication, Loadout and Installation scope involved includes: 15 P a g e

o As built survey and free span survey for 8” gas export line from PPS platform to PTTEP Floating Storage and Offloading 2 unit (FSO2), Pipe Line End Manifold (PLEM).

o Pigging and hydrotest of 8” gas export line from PPS platform to PTTEP FSO2 PLEM

o 8” Expansion dog legs metrology and fabrication (complete with hydrotest and kamos gasket leak test) and installation. Subsea tie in to PLEM at PTTEP FSO2 unit.

o PLEM installation connecting to PTTEP FSO2 unit. o Pigging and hydrotest of SLS05 22” pipeline from PPS platform to WPS05.

o SLS05 22” Spool hydrotest and installation.

As a company representative and project engineer (Kuantan, Malaysia based) coordinating and monitoring line pipe coating including:

• PTTEP Phase 2 - Arthit 1D Project (2011)

Pre-Qualification Test (PQT) for line pipe & pipe bends coating and anode installation.

Monitoring coating type: - 3 Layer Polyprene (3LPP) High and Low temperature and Concrete Weight Coating (CWC).

Monitoring anode installation type: - Half shell anodes (2 types). Monitoring and witness of lab & site tests:- 3LPP and CWC as per requirement.

Load out of all production line pipes.

Offshore preparation for as built documentations, provide offshore & onshore site technical solution.

On shore preparation of schedule and installation paper work materials including drawings and as built documentations.

16 P a g e

Load Out Coordinator / Company Representative / Field Engineer Chevron Thailand Exploration & Production (CTEP) Gulf of Thailand ARTHIT

& BONGKOT field (2010)

As load out coordinator, company representative and field engineer based in contractor’s fabrication yard in Laem Cha Bang, Chonburi, Thailand (as an individual with no ‘back-to-back’). Job scope involves planning, monitoring, preparation, inspection, allocation and load out of materials going offshore (including field troubleshooting, calculation and planning) supporting Nippon Steel offshore construction barge Kuroshio 2 and Chevron Thailand Exploration & Production

(CTEP) LCB team.

Familiar and experienced with CTEP’s standard requirement in compliance to offshore installation and load out phase.

• CTEP – 2010 CHEVRON 3-Phase Campaign (2010)

In charged of load out and off loading of project materials. Immediate critical decision making is required time to time. Careful planning is vital. Receiving of materials and liaising with yard owner for allocation and storage of company’s project material.

Pre rigging of installation materials including platform topsides and jackets. Inspection of all offshore installation materials. Giving all form of job-related supports to CTEP LCB team and Nippon Steel offshore team.

Field troubleshooting and problem solving. Responsible for any issues related to materials loaded out from the LCB fabrication yard. Preparation of load out documentation. Convey all information from load out yard to offshore installation team in clear and direct manner. Offshore installation materials include:

o Complete well head platform (unmanned) – Structural. o Installation aids and gears – Structural and Line pipe. o Pipe lay installation materials and aids.

Load out scope of installation materials include:

o Gas well head platforms (Structural and Pipeline)

M31, M25, PH35-3, PH35-4, PH36-1, PH36-2, PH36-3, PH36-4, PH36-5, PH36-6, PH37-1, PH37-2.

o Oil well head platform (Structural and Pipeline)

PH35-1.

17 P a g e

Barmada Mc. Dermott Sdn. Bhd. (EPCI – Malaysia)

Field Engineer Rank D

Offshore and onshore (including fabrication yard) based for planning, monitoring, preparation, load out and execution of offshore installation (including field troubleshooting, calculation and planning) Familiar with Shell working procedure and standards.

Sarawak Shell Berhad (SSB, Malaysia) South China Sea, M, E, F & B field

(2009)

Preparation of documentation for offshore structural installation involving material requisition, installation aids drawing (ACAD), sea fastening, installation sequence and nesting diagram.

De-Rig of material barges and storage/preservation of project material. Rigging up of material barges for heavy structural offshore installation

(topside modules) including fabrication of sea fastening and load out materials in Batam, Indonesia McDermott Fabrication Yard.

Coordinates load out and fabrication in preparation for offshore installation Preparation for schedule, design, material request, fabrication and transportation of installation aids and equipments. Documentation and drawing compilation (AutoCAD) as required by client. Coordinates onshore heavy lift and liaise with construction support engineer for rigging setup and engineering.

Offshore site check for platform bridge installation clash and dimension check prior to bridge load out.

Field Engineer Rank E

Offshore and onshore (including fabrication yard) based, - planning, monitoring, preparation, load out and execution of offshore installation (including field troubleshooting, calculation and planning) (Supervised by lead field engineer). Sarawak Shell Berhad (SSB, Malaysia) South China Sea, M, E, F & B field

(2008)

Installation procedure preparation.

SSB Sarawak water M1, M3, and E11 field, offshore subsea installation works with diving support vessel (DP2) including:

o Subsea power cable, subsea umbilical connecting subsea wellheads to platforms

18 P a g e

o 10”, 14” Risers for CRA (Corrosion Resistance Alloy) gas lines complete with subsea clamps installation



Contact this candidate