LinkedIn : https://ca.linkedin.com/in/todd-l-wunderly-p-eng-30860613 Executive Summary

Professional Engineer (APEGA) with over 30+ years of Oil and Gas experience in Upstream and Oil Sands Projects including 20+ years on International overseas Projects in the Middle East/Africa (Qatar, Yemen, UAE, Syria, Sudan and Gabon) working for Client companies Syncrude, TOTAL, Imperial Oil, Shell Gabon and Talisman and EPC Companies VECO and Bantrel. Experience in Oil & Gas Facilities/Pipelines, Electrical Generation, Transmission, Distribution Systems and SCADA/DCS/SIS Systems possessing strong Project Management, Business Development, Technical and Leadership skills. Have managed, coordinated and collaborated multidisciplinary Engineering Teams, Operations and Construction Teams throughout all phases of the Project Lifecycle including Scoping, FEED, Studies, Preparing Budget Estimates, Schedules, Tender Preparation/Evaluation, Basic and Detailed Engineering, FAT, SAT, Construction, Commissioning and overall Project Execution for Handover to Operations Sr. Project Manager (Syncrude) Based on site, part of the Project Develop & Execution (PD&E) Team responsible for a Portfolio of Electrical, Instrumentation and Telecom/IT Projects using ExxonMobil’s Gated EMCAPS Process working closely with the Project Executive, Gatekeeper, Sponsor, Stakeholders and Business Units in the Portfolio/Development Group to identify/confirm project drivers, business opportunities and assure business objectives compliance and responsible for executing Projects Execution Engineer (Imperial Oil Limited/ExxonMobil: Kearl Expansion Project) Assist in Project Execution Construction/Commissioning activities providing engineering support for the MSF Buildings and KEP Main Plant Road Sr. Project Engineer U&O + Froth Treatment (TOTAL E&P Canada: Joslyn North Mine Project) Worked on preparing the Tender Documents for the four (4) main silos including Site Services and the MAC as part of the Client Project Management Team (PMT) on the Joslyn North Mine Project MLMR OPP Engineering Lead PMT (Imperial Oil Limited/Syncrude: Mildred Lake Mine Expansion Project MLMR $5.0B) As part of the Client Project Management Team (PMT) supervised Discipline Engineers and oversaw Contractors Scope of Work through Detailed Design of the Ore Processing Plant (OPP) and the 75kV Electrical and Instrumentation Scopes of Work of the MLMR Project including Document Control General Manager (TG Engineering Inc. / YemCan, Sana’a, Yemen) responsible for setting up the Engineering Office in Sana’a, Yemen from 1 to 46 Personnel including Sr. Project Engineers, Discipline Engineers Sr. Project Engineers, Lead Discipline, Senior and Intermediate Engineers, Draftsman and Project Administration personnel. Responsible for Business Development in the region, handling and signing of Contracts and daily running and administration of the Company as well as Project Management duties of the various Engineering work Sr. Project Manager (VECO) for Dublin Oil International (Syria) managing Facilities Projects including Produced Water Disposal/Injection, Casing/Vent Gas Systems and Electrical System Upgrade/Troubleshooting supervising a Team of eight (8) Discipline Engineers on a variety of Field Projects Lead Project Engineer for the (US$1.2B) Utilities & Offsites (U&O) with Bantrel Engineering for the Suncor Voyageur Upgrader Project (US$12B) responsible for the (US$110M) 34.5kV Electrical Distribution Substations and Systems and the Distributed Control System (DCS), Safety Instrumented System (SIS), Fire, Security and Machine Monitoring Systems

Project Engineer for Power Plant, Transmission & Distribution Projects for Petrodar Operating Company

(PDOC) and Greater Nile Petroleum Operating Company (GNPOC) for Talisman Energy in Sudan (Africa) Project Engineer for (US$24M) DCS, SIS and Fire + Gas System (CAO) for Shell Gabon West Africa Todd L. Wunderly, P. Eng.

03/19/20 Page 2 of 7

University Education

B.Sc., Electrical Engineering (BSEE)

Specialty in Computer Science

1986 University of Alberta, Edmonton, Alberta, CANADA Additional Oil and Gas Training

H2S/BA Awareness Course SN: 40561 2008 Venture Gulf Training Centre, Doha, QATAR Introductory Courses on GeoScout 2008 GeoScout, Calgary, Alberta, CANADA OSSA Regional Orientation Program, CSTS,

WHMIS Training, Upgrader Familiarization,

TransAlta Orientation

2006 Bantrel Engineering, Calgary, Alberta, CANADA Introduction to the Western Canadian

Sedimentary Basin

2005 Aryton Exploration Consulting, Calgary, Alberta, CANADA

Evaluation of Canadian Oil and Gas Properties 1999 Sproule, University of Calgary, Calgary, Alberta, CANADA

Associations

Association of Professional Engineers

and Geoscientists of Alberta (APEGA)

Member since 1988

Employment Details

Syncrude Canada Ltd.

Fort McMurray, Alberta

March 2018 to Present

Imperial Oil Limited

Calgary, Alberta, Canada

July 2014 to October 2015

Senior Project Manager

Part of Project Develop & Execution (PD&E) Team based at Syncrude site using ExxonMobil’s Gated EMCAPS Process working closely with the Project Executive, Gatekeeper, Sponsor, Stakeholders and Business Units in the Portfolio/Development Group to identify/confirm project drivers, business opportunities and assure business objectives compliance and responsible for executing Projects

Responsible for a Portfolio of Electrical, Instrumentation and Telecom/IT Projects including Syncrude Voice/Data Radio Projects, CCTV and Security System Project, UPS Replacement in 41B/X Projects, File and Document Management System (SaaS) working with EMIT and other Contractors

Familiar with all EMCAPS procedures including Gate Reviews, Gate Recommendations Internal Project Reviews (IPR), Health Checks (TQA), Risk Assessments, and Deliverables including MCOS, POS, Project Plan, Design Basis and Project Close Out procedure

Execution Engineer: Kearl Expansion Project (KEP) – Infrastructure Projects

Part of Client Project Management Team (PMT) providing Construction Management Team (CMT) support and assisting in resolving engineering issues for the MSF Buildings including Site Mechanical Maintenance Shop BLD-601D, Heavy Duty Wash Bay BLD-605 and Admin/Locker BLD-201/225

Provided Construction Work Package/Commissioning Support for the MSF Buildings Todd L. Wunderly, P. Eng.

03/19/20 Page 3 of 7

Employment Details

TOTAL E&P Canada

Calgary, Alberta, Canada

November 2013 to June 2014

Senior Project Engineer U&O + FT : Joslyn North Mine Project

Part of Client Project Management Team (PMT) preparing Tender Documents for the four (4) main silos including Site Services and the Main Automation Contractor (MAC) for the Joslyn North Mine Project until the Project was cancelled in June 2014

Worked with various internal TOTAL groups to review Scope and Contracting strategies

Assisted Basic Engineering Project Team based in Worley Parsons office as required for yellow-off Plant design reviews

Imperial Oil Limited

Calgary, Alberta, Canada

June 2011 to August 2013

TG Engineering Inc.

Sana’a, Yemen

May 2008 to January 2011

MLMR OPP Engineering Lead PMT: Syncrude MLMR Project

Part of Client Project Management Team (PMT) supervising Client Discipline Engineers to oversee Contractors (Krupp) Scope of Work through Detailed Design of the Ore Processing Plant (OPP) including Double Rolled Crushers, Surge Bin Feed Conveyor, Surge Bin and Slurry Preparation Plant consisting of a Wet Stack of Secondary and Tertiary Sizers

Responsible for the all Electrical & Instrumentation Technical and Project related activities for the $5.0B Mildred Lake Mine Replacement Project (MLMR) for Syncrude

Responsible for the Technical aspects of the D05 Substation DCS Upgrade and 12 X 75kV Substations and Transmissions Lines working with Amec engineers

Responsible for the Electronic Control & Management Systems (ECMS) and integration into the main DCS system and Substations working with Amec engineers

Responsible for the Fiber Optic and Communications Systems integration into the Substations working with Amec engineers

Responsible for Co-ordinating Project efforts in the OPP area for the Crusher, Feed Conveyor, Surge Bin, and Slurry Preparation Plant in the Electrical and Instrumentation areas working with the Contractor (Krupp)

General Manager

General Manager responsible for setting up the Engineering Office in Sana’a to provide Engineering, Construction and Procurement services to Oil and Gas Companies operating in Yemen and increased revenue from zero to seven figures

Grew the Office from an initial head count of 1 up to a peak staffing level 46 personnel including 25+ Expats including Sr. Project Engineers, Lead Discipline, Senior and Intermediate Engineers, Draftsman and Project Administration/Support personnel

Responsible for Business Development, handling and signing of Contracts and daily running and administration of the Company, preparing and managing Change Orders

Sr. Project Manager on a variety of projects including overseeing the development of Studies, Conceptual/FEED and Detailed Design for various Facility and Pipeline projects for various clients including TOTAL, DOVE, Calvalley, DNO and OMV

Responsible for monitoring and reporting on scope, cost, and schedule and overseeing all Project Documentation including Project Execution Plans, Cost Estimates, Project Schedules, Design Basis Memorandums, and Engineering Drawings

Projects include, but not limited to, Basic/Detailed Engineering for Gas Supply System, Pipeline/Facility Studies, Produced Water Disposal and CPI Separation, Truck Offloading Facilities and Procurement Services

Sr. Project Manager for Client OMV on Basic Design for Gas Gathering/Inlet Gas Separation Facility and Pipelines in Yemen

Sr. Project Manager for Client TOTAL Gas Plant to process gas to pipeline spec to run 30MW Reciprocating Power Plant to provide power for local facilities Todd L. Wunderly, P. Eng.

03/19/20 Page 4 of 7

Employment Details

VECO Engineering for Dublin

Oil International (Syria)

Hasseka, Syria

April 2007 to August 2007

Senior Project Manager

Responsible for overseeing development of Facilities Projects including debottlenecking, Produced Water Disposal/Injection, Casing/Vent Gas Systems and Electrical System Upgrade/Troubleshooting for both the Tishrine and Oudeh Oil Fields of Dublin Oil International based in Syria until VECOs Contract was cancelled

Responsible for monitoring and reporting on scope, cost, and schedule and overseeing all Project Documentation including Project Execution Plans, Cost Estimates, Project Schedules, Design Basis Memorandums, and Engineering Drawings

Supervised a Team of eight (8) Discipline Engineers performing Technical work Bantrel Engineering

Calgary, Alberta, Canada

February 2006 to April 2007

Lead Project Engineer – Utilities & Offsites (U&O), Suncor Voyageur Project

Responsible for Technical Project Engineering related activities on the $1.2B Suncor Voyageur Upgrader Utilities & Offsites Project which was awarded to Bantrel

Responsible for overall Plant Layout, working with Piping Discipline to optimize Plant Layout, the overall $110M 34.5kV Power Distribution Main Substation and eleven (11) Substations for the Suncor Voyageur Upgrader Project

Responsible for the Main Automation Contractor (MAC) DCS/Fire/SIS systems

Responsible for leading both Project + Technical issues of the Project, managing the other (4) Project Engineers, Discipline Engineers and their Team of Engineers, Designers and Draftsman

Responsible for monitoring and reporting on scope, cost, and schedule and overseeing all Project Documentation including Project Execution Plans, Cost Estimates, Project Schedules, Design Basis Memorandums, and Engineering Drawings Petrodar Operating Company

(PDOC)

Khartoum, Sudan

September 2004 to

September 2005

Greater Nile Petroleum

Operating Company

(GNPOC)

Khartoum, Sudan

April 1999 to

August 2004

Project Engineer - Power Projects

Responsible for the overall Power Generation, Transmission and Distribution Projects for PDOC, including a 10MW crude-fired diesel station at Al Jabalayn, 40MW crude- fired diesel station at Palouge, a 70km 66kV transmission line, 33kV distribution lines to oil wells, and two (2) 33kV substations - similar to GNPOC described below Project Engineer - Power Projects

Responsible for the overall Power Generation Projects of GNPOC, including preparation of the Load Forecast, feasibility studies, FEED, specification, tender, detailed design, procurement, construction, installation and commissioning of the 29MW Unity Power Plant Project (US$42M, Phase 1) located in Unity field, consisting of 5X18V32 Wartsila crude-fired diesel gensets, switchgear, control room, tank farm and crude processing facilities. Phase 2 added an additional three (3) gensets with a budget of US$27M. Diffra Power Plant was a new Power Plant for the Diffra field in Block 4, and the Heglig 7&8 Upgrade added an additional two (2) 3.5MW Allen Diesel gensets to the existing six (6) gensets in Heglig Power Plant

Although Cogeneration was initially considered, it was dismissed from a technical perspective due to the quality of crude oil to be used as a fuel source

Responsible for monitoring and reporting on scope, cost, and schedule and overseeing all Project Documentation including Project Execution Plans, Cost Estimates, Project Schedules, Design Basis Memorandums, Engineering Drawings Commissioning and Start Up Plans; Management of EPC Contractor VECO/CPECC. Worked with and provided mentorship to local Nationals.

Todd L. Wunderly, P. Eng.

03/19/20 Page 5 of 7

Employment Details

Responsible for the provision of a 10MW rental power system (from Aggreko) to provide temporary power during the construction phase of the Unity Power Plant in order to meet production targets

Responsible for overseeing and reviewing the conceptual/basic design of the overall network basic design including short circuit, load flow, motor starting and protection studies, prepared by GNPOC’s technical power consultant (PB Power) in addition to overseeing the front-end engineering for the specifications of the power generation, transmission and distribution systems

Responsible for electrical modifications to facilities, consisting of five (5) crude oil processing plants and 200+ oil wells, with ongoing modifications to improve the performance of the electrical system, including the installation of autoreclosers, the study, recommendation and implementation of retrofit modifications to well site power lines in order to increase reliability and provide support to other projects including the initiation of an ESP Harmonic Study to study the impact of harmonics caused by ESP VSDs on the overall electrical system providing support to Production Department ACM Automation Inc.

Calgary, Alberta, Canada

1997 to 1999

SCADA / SIS Project Engineer

Performed safety integrity studies for Safety Instrumented Systems (SIS) using the ANSI/ISA-S84.01-1996 standard

Risk Analysis; Prepared a Risk Matrix, which was used during Process Hazards Analysis (PHA) in which Safety Integrity Levels (SILs) were assigned

Reviewed current SIS designs, using the simplified equation approach (ISA dTR84.0.02

– Part 2) and CaSSPack reliability modelling software, and made recommendations, prepared proposals, conceptual designs, and specifications for tender

Prepared project execution plans for national and international SCADA, safety, and telecommunications projects

Prepared SCADA specifications for gas pipeline in Libya, which consisted of 60 RTUs and a host SCADA system

Shell Gabon

West Africa

Gamba, Gabon

Amersfoort, Holland

Camberley, England

1992 to 1995

DCS / SIS Project Engineer

Responsible for conceptual design, specification, tender preparation, detailed design, procurement, construction, implementation and commissioning of the Computer Assisted Operations (CAO) DCS/SIS Refurbishment Project (US$24M) which included the installation of a new Yokogawa DCS system, new Pepperl+Fuchs SIS system, and replacement of all pneumatic instrumentation with electronic instrumentation for the Shell Rabi oil field in Gabon, West Africa and served as liaison for vendors, design team, and operations representatives

Responsible for monitoring and reporting on scope, cost, and schedule and overseeing all Project Documentation including Project Execution Plans, Cost Estimates, Project Schedules, Design Basis Memorandums, and Engineering Drawings

Prepared and reviewed Technical Specifications and Tender Documents; Managed EPC Contractor Fluor Daniel in Camberley, UK

Evaluated Vendor Proposals and submitted recommendations to Shell Gabon’s Tender Board, and reported to Shell Gabon’s Senior Management

Prepared detailed Technical Specifications including a Human Machine Interface (HMI) for the Yokogawa Centum CS DCS, and a detailed RS-232 Serial Interface Technical Specification to transfer data from various vendor packages (including Pepperl+Fuchs emergency shutdown system (SIS), Bristol-Meci metering skid, and Power Management System) to DCS

Provided technical consulting for software application configuration, including well testing and automated export pump configuration used to meet contractual shipping agreements

Todd L. Wunderly, P. Eng.

03/19/20 Page 6 of 7

Employment Details

Willowglen Systems

Limited

Calgary, Alberta, Canada

1991 to 1992

SCADA Software Engineer

Troubleshoot, designed and implemented software enhancements and bug fixes for new and existing SCADA and RTU projects

Installed a 3.11 Novell network and Developed Factory Acceptance Testing (FAT) procedures and documentation

Upgraded an RS-232 serial communication to a “Laptop-to-RTU” communication program, and verified automatic well testing and flow calculations for an existing SCADA installation in Liaohe, China

Hewlett-Packard

Canada Limited

Calgary, Alberta, Canada

1988 to 1991

RTAP Product Support Engineer

Provided online technical support for HPs RTAP/Plus SCADA software development package used by OEMs to create custom Data Acquisition applications in a variety of industries

Developed five-day RTAP programming course for system developers, including support software and course material

Taught the RTAP programming course to customers onsite in Calgary, Palo Alta, Houston, Zurich, and Barcelona

DATEK Industries

Limited

Edmonton, Alberta, Canada

1986 to 1988

SCADA Software Engineer

Designed and programmed real-time process control software for industrial Oil and Gas Remote Terminal Units (RTUs) and SCADA systems in a variety of High Level/Assembly languages

Designed, developed, and programmed application software for multiple applications including an ASCII Serial Interface Unit (SIU) Motorola 8051 based protocol converter, a power-fail temperature-averaging computer, ASCII RS-232 serial data communications protocols, floppy disk management software, and various operator interface commands

Prepared Functional Design Specifications (FDS) and test procedures for Factory Acceptance Tests (FAT) and performed FAT tests

Organized, prepared and wrote system management documentation including Operating Manuals, Software, and Hardware documentation Unity Power Plant - Sudan

Todd L. Wunderly, P. Eng.

03/19/20 Page 7 of 7

Technical Expertise Summary

Industries Conventional, Offshore and Oil Sands Production Facilities, pipelines, electrical power generation, transmission and distribution systems, and real-time SCADA / DCS / SIS control systems for the oil and gas industry. Familiar with Shell DEPs and ExxonMobil EMCAPS Electrical Generation, Transmission and

Distribution Equipment

Engines: Allens Diesel 4012, Wartsila 18V32 and 8R32, Rustin Turbines, Solar Turbine Gas Compressors

Network: 33/66/34.5/260kV Electrical Transmission and Distribution Network with associated switchgear, transformers and protection relay systems

DCS Emerson Delta V, Triconnex, Yokogawa Centum CS, Foxboro I/A, Honeywell TDC 3000

SCADA: PC Based Intellution FIX, USDATA FactoryLink, Wonderware InTouch SCADA: Workstation Based HP RTAP/PLUS, Valmet OASyS SCADA: RTU (Remote Terminal Units) DATEK 8000 Series, Willowglen 2000 Series, other Custom RTUs PLC (Programmable Logic Controllers) Standard: A-B PLC-5 and Siemens SIMATIC S5/S7 Safety: Pepperl+Fuchs and Triconnex TMR

Electronic Flow Measurement Devices Bristol Meci Flow Computers Software Languages C, FORTRAN, Pascal, PLM-80, PLM-86, Microsoft Visual Basic 4.0 Assembly Languages Motorola 6800/6809/68HC11, IBM 360/370, PDP-11, Intel 8085/8086/8748/8051

Operating Systems DOS, HP-UX, OS/2, UNIX, VMS, Windows Hardware Platforms DEC VAX, HP 9000, Intel x86, PDP-11 Network Technologies (LAN/WAN) Ethernet, Internet, Novell, TCP/IP, Token Ring Development of Training Courses

Microsoft Office Products

Designed and prepared Course Material for the 5 day RTAP Training Course offered by HP to developers in order to design, configure and program real-time systems based on the RTAP platform Fully conversant/advanced user of Microsoft Suite of Office Products including MS Word, MS Excel, MS PowerPoint, MS Outlook, MS Project, MS Visio, and MS Access



Contact this candidate