Robert Dougherty
Houston, TX
doughertybob3@gmail
PROFESSIONAL EXPERIENCE
Worley, Fabrication Shop Pasadena, Tx Industrial Electrician
Jan 2023-Feb2024
●install cable tray and grounding according to engineered drawings
●install electrical heat trace wiring
●install junction boxes and related conduits
●layout backplates and install control devices and terminal blocks
●pull control conductors and terminate according to drawings
●fabricate/bend and install instrument tubing for transmitters
Worley, Exxon BCEP Baytown,Tx Industrial Electrician Jun 2022-Jan 2023 Worley, Eastman Chemical project Longview, TX United States
Industrial Electrician Jan 2021 – June 2022
●install conduit,pull conductors,terminate wiring according to engineered drawings
●drive ground rods,install grounding conductors to panels or plc or digital control systems
●fabricate and install supports for cable tray,and install and secure cable tray
●use tugger or winch to pull large conductors in conduit either in underground duct or conduit
●use manlift when required to access pipe racks to facilitate various electrical tasks
●worked safely as team and following safe industry practices wear required ppe and keep workplace consistently injury free
Turner Industries, Westlake chemical project Longview, TX United States
industrial electrician, July 2019 – April 2020
●install conduit,pull conductors,terminate wiring according to engineered drawings
●drive ground rods,install grounding conductors to panels or plc or digital control systems
●fabricate and install supports for cable tray,and install and secure cable tray
●use tugger or winch to pull large conductors in conduit either in underground duct or conduit
●use manlift when required to access pipe racks to facilitate various electrical tasks
●worked safely as team and following safe industry practices wear required ppe and keep workplace consistently injury free
KBR, Eastman project Longview, Tx United States
Industrial electrician November 2008-June 2019
●work in MCC wiring and installing disconnects for production motor, install conduit,pull conductors,terminate wiring according to engineered drawings
●drive ground rods,install grounding conductors to panels or plc or digital control systems
●fabricate and install supports for cable tray,and install and secure cable tray
●use tugger or winch to pull large conductors in conduit either in underground duct or conduit
●use manlift when required to access pipe racks to facilitate various electrical tasks
●worked safely as team and following safe industry practices wear required ppe and keep workplace consistently injury free
certifications
NCEER plus certified #19103747