Post Job Free

Resume

Sign in

Design Build Wastewater Treatment

Location:
Denver, CO
Salary:
80,000 +
Posted:
January 18, 2024

Contact this candidate

Resume:

Donald Stanek

720-***-**** ad2v8w@r.postjobfree.com LinkedIn Colorado

Estimator

Accuracy – Timeliness – Best Value

Estimating Expertise:

Using software to estimate the design concrete structures and building trades.

Responding to specific needs or problems in project estimation, and collaborating to devise solutions.

Conducting budget estimates, reviewing drawings, and evaluating and compiling information to support accurate project estimates.

Applying mathematical and multitasking abilities for plan reading, comprehension, and take-offs.

Preparing bids in a timely manner ensuring adherence to fast-paced dynamic schedules and deadlines.

Applying technical knowledge, commercial instincts, and meticulous attention to detail in estimations.

Professional Experience

ESTIMATOR, CONCRETE, Stanek Constructors - Rice Lake West 2000 – 2023

Estimated water and wastewater treatment projects, pump stations, lift stations, concrete structures, and other miscellaneous projects in Colorado and California at up to ~$40 million in contract value. Executed quantity take-offs, materials pricing, preparing bid packages, and assembling bid pricing. Provided real-time estimating on value engineering options and alternates to achieve optimal value through the design, preconstruction, and construction phases.

Executed project delivery including CMAR, Design-Build, and Design-Bid-Build.

Built a broad network of relationships with the local subcontractor and supplier community, resulting in excellent bidding participation and best value pricing.

Example Projects

-NAWS Biota WTP Phase I, Max, ND, $37,899,573

-Woodmoor 2020 Capital Improvements CMAR, Woodland Park, CO, $7,005,071 WTP Improvements CMAR – Preconstruction Services, Evergreen, CO, $2,774,288 Semper High Service Pump Station, Westminster, CO, $12,676,392

-Denver Water Vault Modifications, Denver, CO, $5,636,647 SeHAWK Selenium Removal Design-Build, Milliken, CO, $3,732,349

-Sedimentation Basins Rehab 1 to 12 at the Point Loma WWTP, Design-Build, San Diego, CA, $6,543,551

-Microfiltration Membrane Treatment Design-Build, Idaho Springs, CO, $1,424,360 ReNewTrient II Design-Build, Hudson, CO, $563,600

-Woodmen WTP Upgrade Design-Build, Woodmen, CO, $1,900,670

-Pump Station No. 1 & No. 2 Electrical Upgrades Design-Build, San Diego, CA, $1,257,001

-Regional Plant No. 4 Influent Bar Screen Replacement Design-Build, $1,898,000 Clarifier Rehabilitation Project, Wellington, CO, $229,700

-States Avenue Lift Station, Pueblo West, CO, $1,684,165

-North Tank Farm Improvement Project, Pueblo West, CO, $3,834,909 Pipe Replacement Project, Johnstown, CO, $333,561

-RP-1 Zone 1158 Recycled Water Pump Station Upgrades, Ontario, CA, $4,548,912

-4S Ranch WRF UV Disinfection System Replacement, San Diego, CA, $2,295,000



Contact this candidate