ad1g7j@r.postjobfree.com
https://www.linkedin.com/in/sarathlal-v-p
V0863234
Area of Interest
Quality Control
Project Coordination/Execution
Installation and Commissioning
Inspection
Key skills
Auto CAD
Design
MS Office
Academic details
Bachelor of Technology (BTech)
Electrical & Electronics Engineering
School of Engineering, CUSAT
Language
English
Hindi
Malayalam
SARATHLAL VP
E L E C T R I C A L E N G I N E E R
Seasoned Engineer with 10 years of sound knowledge in project execution and quality control across electrical domain such as renewable energy, utility services and basic design calculations and equipment selection of industries. Experience
Site Engineer July 2021 – Present
Best Engineering Solutions Kochi (PMC of Tata Power Solar) Kochi Responsibilities:
Site survey to evaluate the feasibility of plant, solar potential, power evacuation facility and availability of DG, Onsite material inspection, Routine work supervision. Final anti-islanding testing of the inverter and commissioning in association with KSEBL. PR testing, documentation pertained to billing and handing over of the plant. Electrical Engineer Dec 2019 – June 2021
Ananthapuri Power Solutions Trivandrum
Responsibilities:
Joint inspection with the client prior to work commencement, Design calculations and scheme preparation up to 500kVA, work supervision, testing and commissioning Installation Supervisor May 2017 – Oct 2019
Thales/AIE /Q-Rail Qatar
Responsibilities:
Imparting Tool Box Talk to the project subcontracting team, Obtaining PTW, Coordination with APO for the schedule and advance booking of UNIIMOG (works train), Supervision of activities by ensuring safety and quality.
Engineer - NI Dec 2014 – Feb 2016
ThyssenKrupp Elevator India Kochi
Responsibilities:
Carryout hands on wiring of control circuits, OSG, Door drive, LOP, COP, initial start up to final full speed of the elevator. Functional testing of elevator. Inspector – Product Safety & Quality March 2013 – Nov2014 Schindler India Mumbai
Responsibilities:
Conduct Perceived Quality Inspection and prepare SAIS Report based on triangular and square points, Carry out static & dynamic tests on the elevator. Do the Safety gear setting and its sealing if required.
Engineer - NI April 2011 – March 2013
Escon Elevators Mumbai
Responsibilities:
Carryout hands on wiring of control circuits, OSG, Door drive, LOP, COP, initial start up to final full speed of the elevator. Functional testing of elevator. Trainee Engineer Aug 2010 – Nov 2010
FABS Private ltd. Pune
Responsibilities:
Supervision of subcontracting team and preparation of daily and weekly work status reports Reference
Anoop
Manager, Ananthapuri Power Solutions
Gopakumar P.G
Partner, BESK
Phone: +91-828******* Phone: +91-949*******
Email : ad1g7j@r.postjobfree.com Email : ad1g7j@r.postjobfree.com