JUNJUN M. VIANA
BLK * LOT ** PHASE C WOODLANE SUBDIVISION
MALAGASANG 1A, IMUS CAVITE CITY
PHILIPPINES
Current Location: IMUS CAVITE CITY,PHILIPPINES
Availability: to be discussed
Contact : 458-***-****, ad0wkj@r.postjobfree.com
PERSONAL DATA
Age: 38 Gender: Male Civil Status: Married
Height: 5’1 Weight: 120 lbs.
Nationality: Filipino Religion: Roman Catholic
TIG WELDER
WORK EXPERIENCE (10 years abroad)
1. POSITION; GTAW/SMAW TIG SS/CS/ALLOY/TG-X/WELDER DURATION; MARCH 6,2020 - CURRENT
COMPANY; RQC, FLORIDA
COMPANY INDUSTRY; CONTRACTOR
LOCATION; GUANTANAMO BAY, US MILITARY BASE,CUBA
PROJECT/LOCATION; GUANTANAMO BAY, US MILITARY BASE,CUBA JOB DESCRIPTION; FULL WELDING IN PIPE & STRUCTURAL SITE FABRICATION, BOILER TOP & UNDERTNEATH,PIPE RACK BIG AND SMALL
UT TEST 100%
OPERATE MANLIFT,SCISSCOR LIFT, ERECTOR
2. POSITION; GTAW/SMAW TIG SS/CS/ALLOY/TG-X/WELDER DURATION; AUGUST, 2017 TO NOVEMBER 22, 2018
COMPANY; DAEAH ENGINEERING AND CONSTRUCTION CO. LTD. COMPANY INDUSTRY; OIL & GAS, AND REFINERY PLANT
LOCATION; AL RUWAIS, ABU DHABI, U.A.E.
PROJECT/LOCATION; RUWAIS REFINERY WEST RESTORATION PROJECT(RRW) JOB DESCRIPTION; FULL WELDING IN FABRICATION SHOP,SMALL BORE AND BIG BORE PIPE GTAW/SMAW TIG SS/CS/ALLOY/TG-X/. WITH 100% X-RAY.
FULL WELDING IN PIPE RACK AND TIE-IN FLAIRE LINE 96” LOW TEMP. PIPE AND 54” 316L(TG-X) GTAW SMAW PROCEDURE WITH 100% X-RAY AND ALIGNMENT PIPE TO MOTOR PUMP.
3. POSITION; GTAW/SMAW TIG SS/CS/ WELDER
DURATION; JUNE 20, 2016 UP TO MAY 28,2017
COMPANY; REGA JV (RENAISSANCE GAMA JOINT VENTURE)COMPANY COMPANY INDUSTRY; LIQUIFIED NATURAL GAS PLANT
LOCATION; SABETTA YAMAL,RUSSIA
PROJECT/LOCATION; *SABETTA YAMAL LNG PROJECT,RUSSIA JOB DESCRIPTION; *TSF-FABRICATION SHOP:REPAIR AND FULL WELDING TIG/ARC SS/CS PIPE WITH 100% RADIOGRAPHIC TEST IN ALL JOINT AND UTILITY AREA IN SITE,SAME JOB AS REPAIR MAN AND FULL WELDING JOB SS/CS PIPE SMALL&BIG BORE PIPE. 4. POSITION; GTAW/SMAW TIG SS/CS/INCOLOY WELDER
DURATION; OCT.16 2013 -UP TO NOV.12,2015
COMPANY; NASEER S.AL-HAJRI CORP.(KSA)
COMPANY INDUSTRY; OIL & GAS, AND REFINERY PLANT
LOCATION; KINGDOM OF SAUDI ARABIA
PROJECT/LOCATION; *YASREF,EPC-1 (ARAMCO PROJECT),YANBU KSA.
*JGC AROMATIC PROJECT SADARA, JUBAIL K.S.A
JOB DESCRIPTION; FURNACE AREA –WELDING STAINLESS STEEL AND CARBON STEEL, AND ALSO INCOLOY GTAW/SMAW AND TIG PROCESS
WITH 100% RADIOGRAPHIC TEST.
PROJECT/LOCATION; AMONIA PHOSPHATE PLANT IN RAS AL-KAIR OR MAADEN AMONIA PLANT
(MY LAST 3 MONTHS PROJ .DURATION)
JOB DESCRIPTION; WELDING HEAVYWALL PIPE 36 INCHES W/ FREE HEAT AND HEAVYWALL STAINLESS STEEL PIPE IN PIPE ROCK WITH100% RADIOGRAPHIC TEST. 5. POSITION; PIPING WELDER (GTAW/SMAW)TIG SS/CS
DURATION; JUNE 5, 2011-APRIL 5,2013
COMPANY; BLACK CAT ENGINEERING CONSTRUCTION COMPANY COMPANY INDUSTRY; OIL & GAS REFINERY
LOCATION; DUKHAN ZIKREET QATAR
DEPARTMENT; FABRICATION & FIELD OPERATION
JOB DESCRIPTION; @FABRICATION SITE –WELDING CARBON STEEL/ STAINLESS STEEL FOR BIG & SMALL BORE
@ FIELD SITE – DO 100% RADIOGRAPHIC TEST IN ALL JOINTS PROJECT; SHUTDOWN @ ARAB D-3(Arab d recycling plant)Qatar Petroleum (QP) Dated 1 month from feb.18 -march 2012.
LOCATION; DUKHAN,QATAR
JOB DESCRIPTION; *ASSIST TO THE G.E GRANITE COMPANY FOR TURBINE REPLACEMENT
*THE ROTOR AND ALLIGNMENT
*PERFORM WELDING AND TACKING THE FOUNDATION BOLT OF THE TURBINE
*REPLACEMENT STAINLESS SCREEN IN THE DUCTING OF THETURBINE
*PERFORM HEATING AND PULL OUT BOLT IN THE TURBINE
*PERFORM WELDING IN GAS HEATER FOR STAINLESS STEEL COIL PIPE INSIDE THEVESSEL
*DO 100% RADIOGRAPHICTEST FRAME
*MAJOR INSPECTION HOT GAS
*SPOT INSPECTION
*REMOVE AND INSTALL PARTSOF GAS TURBINE MANIFOLD, PIPE FUEL LINE, PIGTAIL COMBUSTION, CAN LINER, AND TRANSITION PIECES TURBINE CASING COMPRESSOR CASING ROTOR WELDING AND PIPE MODIFICATION OF GAS TURBINE. PROJECT; SHUTDOWN @ QAFCO AMONIA-1FERTILIZER PLANT Dated 1 month from NOV 6-DEC 5, 2012.
LOCATION; MESSAIED,QATAR
JOB DESCRIPTION; *WELDING IN PIPE ROCK AND UNDER GROUND FOR TIE IN.CS/SS PIPE SMALL BORE
* 100% RADIOGRAPHIC TEST
6. POSITION; GTAW SMAW TIG(CS/SS)
DURATION; 2008-DEC.21,2010
COMPANY; MOHAMMAD AL-MOJIL GROUP (MMG)
COMPANY INDUSTRY; OIL & GAS PLANT
LOCATION ; JUBAIL SAUDI ARABIA
PROJECT/LOCATION; KHURAIS CRUDE PROJECT,SASREF(ULSD),NCP-JGC DEPARTMENT; FABRICATION & FIELD OFFICE
JOB DESCRIPTION; QUALIFIED WELDER FOR GTAW-SMAW PROCESS SUCH AS :WPS P01-001 & P01-002 FOR CARBON STEEL,
WPS 316L & 308L STAINLESS STEEL PIPE
WELDING IN PIPE ROCK,UNDER GROUND,MOTOR PUMP,REACTOR, AND BOILER AREA WITH 100% RADIOGRAPHIC TEST
EDUCATION
Highest Education : BACHELOR’S DEGREE
Course : BACHELOR OF SCIENCE TECHNICIAN EDUCATION (MAJOR MECHANICAL) School/University : SAMAR STATE POLYTECHNIC COLLEGE,now SAMAR STATE UNIVERSITY Location : CATBALOGAN CITY,WESTERN SAMAR
School Year/Date : Y 2000-2001
LICENSES/CERTIFICATES
Description License/Certification No. Date
1. MSAS 34B-MSAS 81 V-115 Jan 5, 2010
2. CBI LUMMUS/SASREF ULSD ASME SEC.IX LATEST EDITION May 5, 2009 3. FUGRO-SUHAIMI ASME sec:9 sa 07-7200 April 11, 2008 4. WPQR-ASME Sec 9 wpsno:BC 59 AD & BC 316 AD AWS Validity from 10Jul2011-April2013 5. AL HOTY STANGER LTD.Co ASME-IX GTAW ER NiCr-3 May 27,2014 6. AL HOTY STANGER LTD. Co. ASME-IX GTAW/SMAW ER May 02,2014 NiCr-3/ER NiCrFe-3
SKILLS
Skill Yrs. of Experience Remarks
1. GTAW/SMAW TIG(SS-CS-INCOLOY-TG-X) 8.8 years Pipe line, Oil and gas, chemical, water line TRAININGS/SEMINARS
Date Topic/Course Title
APRIL 11, 2008- JUN 19,
2008
FUGRO-SUHAIMI/ASME SEC.IX LATEST EDITION
MOHAMMAD AL-MOJIL GROUP
FUGRO-SUHAIMI
AUG 1, 2007- 23, 2007 INDUSTRIAL WELDING & PIPE FITTING LEVEL 1 INAYAWAN CEBU CITY
LANGUAGES SPOKEN
1. English, Tagalog
AVAILABLE DOCUMENTS
Passport
Number: P0505074B Expiry Date: JANUARY 31, 2029
Place of Issue: DFA Tacloban Date of Issue: FEBRUARY 01, 2019 NBI
Number: V500GJZN08-DQ86927 Expiry Date: FEBRUARY 19, 2020 Type : Abroad
REFERENCES
RICHARD WOOD
MR, DARIUS BALASTA
WELDING SUPERINTENDENT
TEL. : 904-***-****
FOREMAN WELDING
JUBAIL SAUDI ARABIA
Tel.No.: +966*********
Position: FOREMAN
MR, SAN NICOLAS SUPERINTENDENT WELDING DEPARTMENT
MOHAMMAD AL- MOJIL GROUP
Tel.No.: +966*********
Position: SUPERVISOR
MR.R.ABABON CHARGE HAND WELDING DEPT.
Tel.no:+974********
Black Cat Company(zikreetdukhan Qatar)
MR.FEDERICO MENA SUPERINTENDENT WELDING DEPARTMENT NASEER AL-HAJRI CORP.
Tel.No.: +966*********
MR.MUHAMMET COZ SUPERVISOR WELDING DEPARTMENT
TEL:+890********
EXPECTED SALARY
(Negotiable)