Post Job Free

Resume

Sign in

Tig Welder X Ray

Location:
Miami, FL
Posted:
November 06, 2023

Contact this candidate

Resume:

JUNJUN M. VIANA

BLK * LOT ** PHASE C WOODLANE SUBDIVISION

MALAGASANG 1A, IMUS CAVITE CITY

PHILIPPINES

Current Location: IMUS CAVITE CITY,PHILIPPINES

Availability: to be discussed

Contact : 458-***-****, ad0wkj@r.postjobfree.com

PERSONAL DATA

Age: 38 Gender: Male Civil Status: Married

Height: 5’1 Weight: 120 lbs.

Nationality: Filipino Religion: Roman Catholic

TIG WELDER

WORK EXPERIENCE (10 years abroad)

1. POSITION; GTAW/SMAW TIG SS/CS/ALLOY/TG-X/WELDER DURATION; MARCH 6,2020 - CURRENT

COMPANY; RQC, FLORIDA

COMPANY INDUSTRY; CONTRACTOR

LOCATION; GUANTANAMO BAY, US MILITARY BASE,CUBA

PROJECT/LOCATION; GUANTANAMO BAY, US MILITARY BASE,CUBA JOB DESCRIPTION; FULL WELDING IN PIPE & STRUCTURAL SITE FABRICATION, BOILER TOP & UNDERTNEATH,PIPE RACK BIG AND SMALL

UT TEST 100%

OPERATE MANLIFT,SCISSCOR LIFT, ERECTOR

2. POSITION; GTAW/SMAW TIG SS/CS/ALLOY/TG-X/WELDER DURATION; AUGUST, 2017 TO NOVEMBER 22, 2018

COMPANY; DAEAH ENGINEERING AND CONSTRUCTION CO. LTD. COMPANY INDUSTRY; OIL & GAS, AND REFINERY PLANT

LOCATION; AL RUWAIS, ABU DHABI, U.A.E.

PROJECT/LOCATION; RUWAIS REFINERY WEST RESTORATION PROJECT(RRW) JOB DESCRIPTION; FULL WELDING IN FABRICATION SHOP,SMALL BORE AND BIG BORE PIPE GTAW/SMAW TIG SS/CS/ALLOY/TG-X/. WITH 100% X-RAY.

FULL WELDING IN PIPE RACK AND TIE-IN FLAIRE LINE 96” LOW TEMP. PIPE AND 54” 316L(TG-X) GTAW SMAW PROCEDURE WITH 100% X-RAY AND ALIGNMENT PIPE TO MOTOR PUMP.

3. POSITION; GTAW/SMAW TIG SS/CS/ WELDER

DURATION; JUNE 20, 2016 UP TO MAY 28,2017

COMPANY; REGA JV (RENAISSANCE GAMA JOINT VENTURE)COMPANY COMPANY INDUSTRY; LIQUIFIED NATURAL GAS PLANT

LOCATION; SABETTA YAMAL,RUSSIA

PROJECT/LOCATION; *SABETTA YAMAL LNG PROJECT,RUSSIA JOB DESCRIPTION; *TSF-FABRICATION SHOP:REPAIR AND FULL WELDING TIG/ARC SS/CS PIPE WITH 100% RADIOGRAPHIC TEST IN ALL JOINT AND UTILITY AREA IN SITE,SAME JOB AS REPAIR MAN AND FULL WELDING JOB SS/CS PIPE SMALL&BIG BORE PIPE. 4. POSITION; GTAW/SMAW TIG SS/CS/INCOLOY WELDER

DURATION; OCT.16 2013 -UP TO NOV.12,2015

COMPANY; NASEER S.AL-HAJRI CORP.(KSA)

COMPANY INDUSTRY; OIL & GAS, AND REFINERY PLANT

LOCATION; KINGDOM OF SAUDI ARABIA

PROJECT/LOCATION; *YASREF,EPC-1 (ARAMCO PROJECT),YANBU KSA.

*JGC AROMATIC PROJECT SADARA, JUBAIL K.S.A

JOB DESCRIPTION; FURNACE AREA –WELDING STAINLESS STEEL AND CARBON STEEL, AND ALSO INCOLOY GTAW/SMAW AND TIG PROCESS

WITH 100% RADIOGRAPHIC TEST.

PROJECT/LOCATION; AMONIA PHOSPHATE PLANT IN RAS AL-KAIR OR MAADEN AMONIA PLANT

(MY LAST 3 MONTHS PROJ .DURATION)

JOB DESCRIPTION; WELDING HEAVYWALL PIPE 36 INCHES W/ FREE HEAT AND HEAVYWALL STAINLESS STEEL PIPE IN PIPE ROCK WITH100% RADIOGRAPHIC TEST. 5. POSITION; PIPING WELDER (GTAW/SMAW)TIG SS/CS

DURATION; JUNE 5, 2011-APRIL 5,2013

COMPANY; BLACK CAT ENGINEERING CONSTRUCTION COMPANY COMPANY INDUSTRY; OIL & GAS REFINERY

LOCATION; DUKHAN ZIKREET QATAR

DEPARTMENT; FABRICATION & FIELD OPERATION

JOB DESCRIPTION; @FABRICATION SITE –WELDING CARBON STEEL/ STAINLESS STEEL FOR BIG & SMALL BORE

@ FIELD SITE – DO 100% RADIOGRAPHIC TEST IN ALL JOINTS PROJECT; SHUTDOWN @ ARAB D-3(Arab d recycling plant)Qatar Petroleum (QP) Dated 1 month from feb.18 -march 2012.

LOCATION; DUKHAN,QATAR

JOB DESCRIPTION; *ASSIST TO THE G.E GRANITE COMPANY FOR TURBINE REPLACEMENT

*THE ROTOR AND ALLIGNMENT

*PERFORM WELDING AND TACKING THE FOUNDATION BOLT OF THE TURBINE

*REPLACEMENT STAINLESS SCREEN IN THE DUCTING OF THETURBINE

*PERFORM HEATING AND PULL OUT BOLT IN THE TURBINE

*PERFORM WELDING IN GAS HEATER FOR STAINLESS STEEL COIL PIPE INSIDE THEVESSEL

*DO 100% RADIOGRAPHICTEST FRAME

*MAJOR INSPECTION HOT GAS

*SPOT INSPECTION

*REMOVE AND INSTALL PARTSOF GAS TURBINE MANIFOLD, PIPE FUEL LINE, PIGTAIL COMBUSTION, CAN LINER, AND TRANSITION PIECES TURBINE CASING COMPRESSOR CASING ROTOR WELDING AND PIPE MODIFICATION OF GAS TURBINE. PROJECT; SHUTDOWN @ QAFCO AMONIA-1FERTILIZER PLANT Dated 1 month from NOV 6-DEC 5, 2012.

LOCATION; MESSAIED,QATAR

JOB DESCRIPTION; *WELDING IN PIPE ROCK AND UNDER GROUND FOR TIE IN.CS/SS PIPE SMALL BORE

* 100% RADIOGRAPHIC TEST

6. POSITION; GTAW SMAW TIG(CS/SS)

DURATION; 2008-DEC.21,2010

COMPANY; MOHAMMAD AL-MOJIL GROUP (MMG)

COMPANY INDUSTRY; OIL & GAS PLANT

LOCATION ; JUBAIL SAUDI ARABIA

PROJECT/LOCATION; KHURAIS CRUDE PROJECT,SASREF(ULSD),NCP-JGC DEPARTMENT; FABRICATION & FIELD OFFICE

JOB DESCRIPTION; QUALIFIED WELDER FOR GTAW-SMAW PROCESS SUCH AS :WPS P01-001 & P01-002 FOR CARBON STEEL,

WPS 316L & 308L STAINLESS STEEL PIPE

WELDING IN PIPE ROCK,UNDER GROUND,MOTOR PUMP,REACTOR, AND BOILER AREA WITH 100% RADIOGRAPHIC TEST

EDUCATION

Highest Education : BACHELOR’S DEGREE

Course : BACHELOR OF SCIENCE TECHNICIAN EDUCATION (MAJOR MECHANICAL) School/University : SAMAR STATE POLYTECHNIC COLLEGE,now SAMAR STATE UNIVERSITY Location : CATBALOGAN CITY,WESTERN SAMAR

School Year/Date : Y 2000-2001

LICENSES/CERTIFICATES

Description License/Certification No. Date

1. MSAS 34B-MSAS 81 V-115 Jan 5, 2010

2. CBI LUMMUS/SASREF ULSD ASME SEC.IX LATEST EDITION May 5, 2009 3. FUGRO-SUHAIMI ASME sec:9 sa 07-7200 April 11, 2008 4. WPQR-ASME Sec 9 wpsno:BC 59 AD & BC 316 AD AWS Validity from 10Jul2011-April2013 5. AL HOTY STANGER LTD.Co ASME-IX GTAW ER NiCr-3 May 27,2014 6. AL HOTY STANGER LTD. Co. ASME-IX GTAW/SMAW ER May 02,2014 NiCr-3/ER NiCrFe-3

SKILLS

Skill Yrs. of Experience Remarks

1. GTAW/SMAW TIG(SS-CS-INCOLOY-TG-X) 8.8 years Pipe line, Oil and gas, chemical, water line TRAININGS/SEMINARS

Date Topic/Course Title

APRIL 11, 2008- JUN 19,

2008

FUGRO-SUHAIMI/ASME SEC.IX LATEST EDITION

MOHAMMAD AL-MOJIL GROUP

FUGRO-SUHAIMI

AUG 1, 2007- 23, 2007 INDUSTRIAL WELDING & PIPE FITTING LEVEL 1 INAYAWAN CEBU CITY

LANGUAGES SPOKEN

1. English, Tagalog

AVAILABLE DOCUMENTS

Passport

Number: P0505074B Expiry Date: JANUARY 31, 2029

Place of Issue: DFA Tacloban Date of Issue: FEBRUARY 01, 2019 NBI

Number: V500GJZN08-DQ86927 Expiry Date: FEBRUARY 19, 2020 Type : Abroad

REFERENCES

RICHARD WOOD

MR, DARIUS BALASTA

WELDING SUPERINTENDENT

TEL. : 904-***-****

FOREMAN WELDING

JUBAIL SAUDI ARABIA

Tel.No.: +966*********

Position: FOREMAN

MR, SAN NICOLAS SUPERINTENDENT WELDING DEPARTMENT

MOHAMMAD AL- MOJIL GROUP

Tel.No.: +966*********

Position: SUPERVISOR

MR.R.ABABON CHARGE HAND WELDING DEPT.

Tel.no:+974********

Black Cat Company(zikreetdukhan Qatar)

MR.FEDERICO MENA SUPERINTENDENT WELDING DEPARTMENT NASEER AL-HAJRI CORP.

Tel.No.: +966*********

MR.MUHAMMET COZ SUPERVISOR WELDING DEPARTMENT

TEL:+890********

EXPECTED SALARY

(Negotiable)



Contact this candidate