Post Job Free
Sign in

Project Manager Engineer

Location:
Washington, DC
Posted:
March 31, 2017

Contact this candidate

Resume:

Glenn A. Telford

**** ********** **

Warrenton, Va 20187

Home 540-***-****

Cell 703-***-****

OBJECTIVE:

My objective is to obtain long-term employment with a Reputable Company or Municipality.

EDUCATION:

Associates Degree Applied Sciences Architectural and Machine Drafting

I.T.T. Technical Institute Youngstown, Ohio. Associates Degree in Applied Sciences

20+ Years’ Experience in Construction Management, Cost Control, Planning,

State Environmental Departments, Municipalities, and WMATA.

These agencies are located from New York City, to Richmond VA.

EXPERIENCE: WMATA IT/NCS Infrastructure- June 2012 – Present, Integrated Network Engineer.

Assist and Plan placement of Network Equipment thru the entire Metro System.

Create listings and data showing where Communications are being used, and by whom.

Coordinate with Technicians and Contractors construction needs and budgets.

Assisted in acquiring software that is GIS and Oracle based for layout of existing

Telecommunication cables and equipment.

Responsible for obtaining quotes for Inventory and Assets for our Department.

Updated all the CAD files of Rack and Communication Room Drawings for all equipment

located in the communications equipment rooms for the entire Metro Authority.

Currently drafting new station drawings using the fire maps, and placing them into

the main wire-center drawings for the entire Metro Authority.

Working with the Engineers in charge to create Work Orders to for cost analysis of a new

system wide 288 Fiber Optic Cable, using StellerRad.

Track, and organize all inventory and assets by part number, description, and location.

Track all inventory location and usage for proper Project Cost Control and Analysis.

Organize Vehicle Fleet for mileage and usage reports on a weekly basis, including but not

limited to gas usage, and maintenance schedules. Including all inspections required with

the District DMV.

Dynamic Concepts Inc. April 2011-Nov 2012 CAD for IT/NCS Infra. – Invoice Manager for DCI

CAD Drafting of Rack Drawings located in all the communication equipment rooms.

Updated ITS/Infrastructures location of equipment, and electrical outlet locations.

After completion of IT/NCS Infrastructure Temp Work, Became Invoice Manager for DCI.

Responsible for proper tracking and record keeping of all invoice received from Verizon

for the billing on their part of the FIOS project in Washington DC.

Supervised all permits for Verizon dealing with Washington, DC. District Department

Of Transportation for FIOS work.

Danella Engineering and Constr. March 2008 to April 2011 Project Manager/Engineer

Project Manager/Engineer for Designing, Researching, Permitting, Construction Bond Research

and the planning for any requirement for Permit Acquisition or Construction

Point of Contact for any customer who needed a feasibility study or research for possible

Construction or for planning last minute construction needs

In charge of all research for ROW information and Permitting requirements in Northern Va

Washington, DC and Maryland. This includes any city or state information

for permitting or right-of-way information, as construction is required.

Responsible for properly filling out permit applications, and researching permit fees. This includes meeting with the permit agencies and personnel for proper communication before, and during construction. Lead Point of Contact for Federal, State, and County Government Offices and Officials.

Manage and plan construction and material supplies, as well as site coordination and logistics.

Plan construction timetables with available crews.

S & N Communications May-05 to Feb-08 Assit. Project Manager Clarify Verizon drawings for sub-contractors at the field construction level Manage supply procurement and inventory.

Manage construction schedules for sub-contractors and the jobs they are constructing.

Audit billing for accuracy in respect to billing codes, and footage provided by our inspectors.

Manage and maintain all reports to main office on a daily basis .

Oversee and resolve complaints from homeowners.

Train Field Inspectors on proper Verizon billing and construction guidelines in reference to

agreed contract with Verizon.

EXPRESS TECHNOLOGIES JUNE-04 April-05 Senior Field Engineer Planned and designed Fiber Optic Routes both underground and aerial.

Created permit packages.

Trained CAD personnel Managed completion of construction permits dealing with all the counties in Northern Virginia, Washington D.C. and Maryland.

FIRST SOUTH Utilities Jan 02-June 04 Senior Engineer/Locater

Located over 140 miles of Fiber Optic cable Spotsylvania County to Washington D.C.

Completed CAD changes to as-built drawings for First South Utilities customer

Engineered changes for fiber optic relocation for new construction located round our existing plant. New housing developments, road widening etc.

CITY SIGNAL COMMUNICATIONS Feb 2000-Dec 2001 Project Manager/Senior Field Engineer

Managed Engineering and Construction for Cavalier Telephone

Was point of contact between Cavalier Telephone and all municipalities in involved with construction and permitting.

Managed the CAD department, and all the work coming from this department

Assured all construction met VDOT regulations

Went into the field and audited other engineers work for accuracy.

Managed engineering changes to complete construction on schedule

Supervised CAD training and engineer training for field work.

Managed Construction, and planned timetables and budgets

LIGHTWAVE SPECTRUM INTERNATIONAL INC.(Cavalier Telephone) 1/00-2/01 Senior Field Engineer

Oversaw the engineering of manhole and conduit systems

Created drawings for conduit placement for commercial customers

Drew details of underground boring and trenching specs

Managed all construction typicals per VDOT regulations

Customized drawings with respect to hardware in buildings in need of inside conduit construction

Trained and supervised new Field Engineers

JJB Network Technologies 8/99-1/00 Project Manager

Managed CADD and conduit placement for all of Washington D.C.

Manually created CADD drawings by tracing over old plat drawings, scanned and inserted in AutoCAD then drew over scanned images.

Created drawings for placement of Fiber Optic Cable for commercial customers to obtain permits from the city of Washington D.C.

FIBER NET 2/99-8/99 Field Engineer/CADD Manager

Managed Engineering and Construction for the first 20 conduit system in Northern Va.

Supervised billing, training and daily reports for 10 field inspectors

Managed all CAD work

Supervised training and sight safety.

Managed all as-built drawings.

MFS 10/97-11/98 CAD/Engineering

Created new construction drawings and made changes to existing drawings for permit acquirement

Changed construction drawings to as-builts per inspectors redline

Created turnover packages for the UUNET LOOP

Created turnover package for the WorldCom Reston Loop

Trained field engineers on how to properly draw field notes for CAD

SOFTWARE:

Auto CAD

Auto Desk Map 3D

Micro Station

Map Info 6.0

GPS Bravo 3

Microsoft Office

StellerRad

Patch Manager



Contact this candidate