Trainer’s Profile
Personal Particulars
Name
Nyana Pragasam a/l Sellavappan
IC No. 521***-**-****
Date of Birth 03 - 11- 1952
Nationality Malaysian
Marital Status Married
Gender Male
Contact Details
Permanent
Address:
236, Taman Cuepacs, Jalan Sungai Ujong, 70200, Seremban, Negri Sembilan, Malaysia
Mobile No. 6(012) - 632 - 3637
House No. 6(06)- 761- 9748
E-Mail: acwcyb@r.postjobfree.com
PSMB Certified (HRDF)
Certified by JIPM PM Trainer
Certified PM Trainer for ON Semiconductor.
Certified by Pembangunan Sumber Manusia Berhad (HRDF) Trainer The Trainer (TTT).
RCM and PM Trainer.
Registered Motivational Speaker for Jabatan Penjara Malaysia Courses Specialize in:
1. RCM Workshop Methodology.
2. Total Productive Maintenance Workshop Methodology. 3. 7 QC tools
4. 6 S
5. 8 Disciplines
6. Predictive Maintenance
Academic Qualification
Master
MSc in Manufacturing (International Islamic University Malaysia) Year completed 2001
Degree
B.Eng (Hons) Electrical and Electronic Engineering (Robert Gordon University, Aberdeen, Scotland ) Year completed 1995 Diploma
Mechanical Engineering (Tafe College, Seremban, Negri Sembilan, Malaysia ) Year completed 1978
Secondary Malaysian Certificate of Education (MCE) Year completed 1972 7. Autonomous Maintenance
8. Analytical Planned Maintenance
Training Experience
Training conducted successfully for the following category of personnel: RCM and PM Trainer 2000 – 2015
1. Engineering Managers
2. Equipment Engineers
3. Technical Specialist
4. Online Technicians
Working Experience
Year 1982 – 2009
As Maintenance Manager ON Semiconductor/ Motorola Corporation he was involved in the following assignments from year 2000 to 2009
Leading team of engineers and technicians, meeting organizational goals, monitoring and reviewing project timeline for prompt equipment delivery, meeting production datelines. Creating partnership with vendors for cost reduction and just in time delivery.
Train and Implement Planned Maintenance for Technician and Engineers.
Leading a team of equipment engineers and technicians to execute organization goals on cost, quality and delivery.
Plan and execute scheduled preventive maintenance activities analyzing equipment performance.
Analyzing and reduction in weekly maintenance cost.
Product ramp up
Improve Equipment efficiency through greater flexibility.
Train and Implement TPM step 1 - 3 ( 9 PM Team Graduated)
Built in-house Trim and Form equipment (Capital cost reduction)
Awarded best paper presentation for Trim and Form in Technical symposium
Train equipment-related technical Specialist.
Transfer Equipment from Tesla for IC TO220
Integrate Trim and Form machine with Test handlers. Professional Profile
Experience in the field of equipment engineering, setting up/maintaining and equipment for manufacturing operation, maximizing equipment effectiveness so each type of equipment could be operated to its full potentials.
Taking analytical approach to identify the causes of the failure through continuous improvement methodology, address the major breakdown losses resulting in high defect rates causing high yield losses. Leading a group of Engineers and technicians to perform daily operations efficiently and correctly to meeting organization goals
Strong team player/leader that excels in mediating among other divisions of the organizations creating healthy working atmosphere.
Positive, optimistic, well-organized self-independent, able to perform under pressure to meets deadlines.
Skilled individual who makes attempt to transform strategic plans into workable solutions.
Versatile and seasoned professional who adapts well to rapidly changing business environments.
PM trainer, provide training for new technicians to possess the necessary skill and knowledge to understand basic equipment failures.
Management Strengths:
Setting datelines to meet customer demand.
Ability to communicate effectively.
Proactively thinking towards success of the organization indices.
Deliver results under pressure and staying focus.
Planning and implementing best practices to eliminate human errors that cause quality issues.
Update project progress/costs and ready alternatives.
Have mitigation plan for Project on risk.
Summarize weekly, monthly, quarterly equipment performance report and recommend remedial action bringing the performance back to committed level.
Create cross functional team bringing quality awareness and conforming to compliance.
Maintain a high level of professional and technical competence and identify training for the team and effective methods and techniques available. Recipient for some of Major Awards:
CEO Award for14/16 lead IC Plastic Die & Wire Bond Quality Team for in-process improvement, cycle time and yield improvement.
1985
Technical Award for Clamp Design Optimization for GPN Auto Wire Bonder for Quality and productivity improvement. 1992
Technical Award for High Speed Washer for Cost Reduction. 1994 Upgrade Die bonder for productivity improvement and benchmarking for manufacturing sites (Cost improvement) 1994
GM Award for Case 77/ Carsem Foton Team for Die bond capacity improvement from 2.5M to 3.5M units per week 1996
Error Proof for Laser Cover Safety System 1999
TPM Best Team award for productivity and quality improvement 2002
Design TRIM and FORM Integrate with Test Handler System for Capital cost reduction purchasing new equipment
2004
Upgrade Test Handler System (T16 and M32 systems) quality improvements
2005
Languages
Proficiency 0 = Poor 10 Excellent
Language Spoken Written
Bahasa Malaysia 10 8
English 10 10
Tamil 10 9