PERSONAL DATA

Full name: Dapaah Godwin

Date of Birth: 19th April, 1985

Address : KS 7444 Adum-kumasi

Years of Experience: 10years

Nationality: Ghanaian

E-mail: acvw1c@r.postjobfree.com

Tel: +233*********/+233*********

MISSION STATEMENT: To contribute to industrial plant installation, maintenance, plant reliability through my ten years of experience. Am young man with industrial plant maintenance, installations background and I will utilize my education, experience to provide excellent services to your organizational goals and the best of my capabilities. I am also ready to work anywhere in the world, adapt to new environment, learn, and to embrace challenges and responsibilities. ACADEMIC BACKGROUND

YEAR CERTIFICATES OBTAINED INSTITUTION

2009-2010 Mechanical Engineering Technician III Kumasi Polytechnic 2007-2008 Mechanical Engineering Technician ll Kumasi Polytechnic 2006-2007 Mechanical Engineering Technician l St. Paul Tech School 2002-2005 Welding Intermediate Craft Practice Gratis foundation WORKING EXPERIENCE

KSB PUMPS AND VALVES WEST AFRICA

SALES/INSTALLATIONS/MAINTENANCE ENGINEER-4TH JUNE TO DATE 1 Report on sales, installations and maintenance to the general manager 2 Provide technical support on pumps and valves, services on site, maintenance inspection management, total pump management(TPM), system efficiency services(SES), pump calculation, alignments, pump rebuilding and selecting of pumps and valves to customers in the mining, oil and gas industries. Specialist maintenance engineer for Ghana water company at the Eastern region of Ghana due to KSB pumps their using. Highly experienced on pipes constructing, welding and rigging. 3 Not limited to the following

High standard of safety on site

• To develop and grow sales, installation and maintenance in the mining industry both process plant and underground in Africa.

• To offer technical know-how and support to new customers.

• To perform field trials on new and existing products.

• To propose and make presentation to customers.

• To carry out relevant market research.

• To compile monthly/annual sales budget reports and forecasts.

• To carry out territory management planning.

• To develop sales strategies and action plans.

RESOLUTE MINING LIMITED (MALI) - FOUR MONTHS EXPANSION PROJECT MECHANICAL TECHNICIAN - FEBUARY 2015 TO JUNE

ASSIGNMENTS - GOLD PROCESS PLANT

1 Maintain high safety standard on syama mining site 2 Supervise Installation and maintenance of mechanical equipment’s in the process plant. 3 Train the national on the job

4 Plan day to day activities and report to site manager 5 Report writing on the equipment performance

6 Assisting in pipe designs and modifications

7 High knowledge on breakdown and shutdown maintenance 8 Worked with consultant during commissioning of gold process plant 9 Interpretation of drawings (ISO and P&ID) to national both mechanical fitters and fabricators on site 10 Supervise Rebuilding of mechanical equipments on site FORGE CONSTRUCTION GROUP - ONE YEAR EXPANSION PROJECT FEBRUARY 2014 TO FEBUARY 2015(MECHANICAL INSTALLATION AND MAINTENANCE EXPERT) RESOLUTE MINING LIMITED (SYAMA PROJECT) MALI

ASSIGNMENTS

1 High safety standard and housekeeping on site and prepare JHA, DSTI, before starting work. 2 High knowledge on isolation, lock out and tag out (LOTO), OSHA 3 Conduct prestart meeting for expats on site, planning and schedule day to day activities and also report to site manager

4 Supervise Installation of centrifugal pumps, commissioned and carry out maintenance as expected, preventive, proactive, predictive and shutdown and breakdown maintenance 5 High knowledge on time management and reliability centered maintenance. 6 Installation of thickener raking blade, coupling of the shaft to the gearbox and it lube system, commissioned and carried out maintenance.

7 Supervise crusher installation, commissioned and carried out maintenance. 8 supervise and train nationals both installations and maintenance. 9 Supervise fixing mechanical instrumentation items on 5 tons oxygen plant using P&ID drawings, commissioned and maintenance on Atlas copco compressors. 10 Assisting in welding and fabrication when the needs arise 11 Monitoring flashing of mill bearings, drained and refilled with new one before commissioned 12 Ball mill installing and their drive system with high millwright knowledge and expert and general process plant commissioning and maintenance.

FORGE CONSTRUCTION – THREE MONTHS PROJECT

MECHANICAL INSTALLATION AND MAINTENANCE TECHNICIAN - NOVEMBER 2013 TO FEBUARY 2014

LONDON MINING LIMITED - SIERRA LEONE

ASSIGNMENT- IRON ORE PLANT

1 Installation of all types of pumps, alignments and dewatering pumps and commissioned 2 To train the locals on the job

3 Maintain good housekeeping around the site

4 Installation of crushers and commissioned

5 Installation of belt conveyor, impact crushers and tracking of the belt 6 Replacement of bearing to suit valuable speed motors 7 Fixing of flow indicators, non-return valve on the gland water line 8 Fixing of agitators and gearboxes

9 Ball mill installation and their drive system with experts from metso. PERSEUS MINING GHANA LIMITED

MECHANICAL TECHNICIAN LEAD HAND(SHIFT) – NOVEMBER 2012 TO NOVEMBER 2013 ASSIGNMENT – GOLD PROCESS PLANT

1. Supervising junior maintenance staff and ensure that plant equipment’s are maintained, repaired and in timely efficient manner and also prepared safe, hot, confine space working permit for junior staff and writing of report to the mechanical supervisor and enter it into pronto system. 2. Experience in maintaining the following equipment’s and running of the process plant, SCADA control knowledge.

Crushing and screening circuits with good gyratory, cone, jaw crusher experience and mobile crushers.

Conveyor belts tracking and maintenance, uses the law of conveyor to track the belt

Ball mills and their drive systems, pinion, trunium bearings, temperature transmitting systems

Hydraulic and pneumatic systems, the lube pac for the mill, flow meter set up, oil sampling

Centrifugal, dewatering and positive displacement pumps, barrel bearing rebuilding, good alignment, gland packing adjustment, and general rebuilding of the pump

Reagent pumping, mono pumps rebuilding, bearings, stator, heat exchangers cleaning

Flotation cells, modification of pipe line to feed the condition tank

Thickeners, maintenance of vederflex pumps

Agitators, gears arrangement, couplings

Pump calculations

3. Maintained high standard of housekeeping both the plant and workshop. 4. Rebuild and maintenance on gyratory and pebble crushers and monitoring of all the crusher conveyors and track them as the law of conveyor says, changing of defective rollers . 5. Provide and maintain records of time and materials utilized. 6. Knowledge on RCM, planning and scheduling, preventive and shutdown maintenance. 7. Comply with maintenance and service schedule and report schedule deficiencies. 8. Monitoring the performance of oxygen generators and carried out maintenance works. 9. Carried out modification in the plant to increase production and also to cut down maintenance cost. 10. Monitoring of mill, thickener, flotation, acacia and CIL plant. 11. Specialize in centrifugal pumps and all types of pumps in a fixed plant. 12. Ensure safe working practice within the processing plant and the crushing plant. 13. Supervising and scheduling activities and assigning crew to effectively optimize the utilization of resources toward the goal of optimum equipment availability. 14 Ensure the maintenance history of the plant equipment’s are well documented. 15 Carried out maintenance on apron feeder.

16 High knowledge on oxygen plant maintenance, purity and flow rate monitoring. OWERE MINES LIMITED GHANA

SENIOR PLANT MECHANIC - MAY 2011 TO SEPTEMBER 2012 ASSIGNMENT – GOLD PROCESS PLANT

1 Writing shift report to the Mechanical Engineering senior supervisor and high knowledge on safety. 2 Ensuring packing gland, mechanical seals, sleeves and bearings where change when at fault. 3 Ensuring that disassembling and reassembling of pumps of all types when at fault. 4 Checking alignment when fixing v- belt on pumps and motors. 5 Ensuring preventive maintenance (PM) and work schedule are maintained according to plan. 6 Monitoring all the conveyor belts side tracking and adjust if necessary. 7 Fixing agitators and gear box when at fault

8 Ensures smooth running of gear box, pumps, belt conveyor and the ball mill 9 Ensure greasing was done as schedule and where necessary. 10 Monitoring and carrying out PMs, shutdown and breakdown maintenance on all dewatering pumps on site.

11 Changing conveyor roller when wear or seize or noisy. 12 Draining moisture from air compressor, dryers and air receivers. 13. Assemble and re-assemble heat exchangers, clean or change when at fault. 14.Worked on hydraulic equipment such as lube set- up or lube pack. 15 Monitoring and maintenance on Jaw, Cone and mobile crushers JUABEN OIL MILLS REFINARY GHANA

PLANT TECHNICIAN – DECEMBER 2008 TO APRIL 2010

OIL REFINERY AND FRACTIONATION PLANT

ASSIGNMENT

1 Giving daily report on machine performance to the mechanical supervisor 2 Using argon (TIG) to weld 18bar pressure boiler tubes and thermo fluid pipe lines. 3 Performs pneumatic and hydraulic test on pipelines and equipment before commission. 4 Fixing of pumps and motors and checking of alignment. 5 Ensures the smooth running of motor to pump alignment. 6 Changing of mechanical seals, bearings, impellers when they are fault. 7 Carried out maintenance work on bleachers, deodorizers, crystalizes, chillers and troubleshooting on vacuum line, valves and vacuum pumps.

8 Troubleshooting and fixes agitator when they are at fault. 9 Cutting and changing of gasket and also fixing of memory filters at the fractionation section 10 Working on high pressure steam valve, strainer and actuator valve. GHANA PALM OIL DEVELOPMENT COMPANY LIMITED

MECHANIC – JANUARY 2006 TO NOVEMBER 2008

OIL REFINERY AND FRACTIONATION PLANT

ASSIGNMENT

1 Giving daily report on installation works to the project supervisor. 2 Installation of 2.5 mega watt turbine and carried out maintenance when faulty. 3 Installation of water treatment plant, commissioned monitoring and carried out maintenance. 4 Installation of chiller at the refinery plant.

5 Maintenance work on 30 bar pressure boiler

6 Dismantle of pumps to change the mechanical seal, impeller, gland, bearing etc.when at fault. 7 Worked on conveyors of all types when at fault

8 Worked on pneumatic equipment such as valve, cylinders. 9 Installation of pumps of all types, heat exchangers, Memory filters, PLF, etc. 10 Welding of sterilizers with MIG technique

COURSE ATTENDED

RELIABILITY CENTERED MAINTENANCE AND LEADERSHIP SKILLS -MEMCONS HYDRAULICS AND PNEUMATICS, CYANIDE AWARENESS, CONVEYORS, PUMPS AND DRIVE SYSTEM, ALIGNMENTS-PERSEUS MINING

SAFETY REP-OWARE MINES LIMITED

LANGUAGE CAPACITY

TYPE SPEAKING WRITING READING

English Excellent Excellent Excellent

French Basic Learning Learning

HOBBIES

Reading, industrial troubleshooting, listening to music, soccer and golf. REFEREES

Bismarck George Maxwell Antobam

Plant Engineer Senior mechanical supervisor

acvw1c@r.postjobfree.com Perseus mining Ghana Limited acvw1c@r.postjobfree.com

Tim Platt

Site Manager Syama Mines Mali

acvw1c@r.postjobfree.com