OBA SONNY COLLINS
Address: Plot ** U.P.E Sand fills Borokri Port Harcourt, Rivers State, Nigeria
Telephone No: 080******** or 081********, E-mail address: acvvgu@r.postjobfree.com or gmail.com
PERSONAL DATA
Sex: Male
Date of birth: 26th Aug, 1985
Marital Status: Single
Nationality: Nigeria
State of origin: Rivers State
Local Govt. Area: Okrikia
SCHOOL ATTENDED WITH DATES
Enugu State University of Science and Technology 2004 Institute of Management and Technology (IMT) 2004
Clockwise Computer &Technology 2003
New Era Brilliant College 1998
St John Primary School 1991
ACADEMIC QUALIFICATION WITH DATES
BSc. Degree (Upper Credit) 2008
OND 2006
WASSCE 2003
First School Leaving Certificate 1998
CERTIFICATION OBTAINED
Pipe Fitting and Installation 2011
Project Management Institute (PMI) 2015
Radiographic File Interpretation (RFI) 2015
Radiographic Test (RT) 2015
Magnetic Test (MT) 2015
Dye Penetrant Test (PT) 2015
TECHNICAL WORKSHOP EXPERIENCE
Piping Fabrication (QAQC Piping/Structural Inspector) 2010 Tank Plate Fabrication (Tank Project Engineer) 2013 Vessels Stacks Fabrication Engineer / Inspector 2015
WORKING EXPERIENCE
COMPANY POSITION DATE
Daewoo Nigeria Limited (DN57) QAQC Piping / 2010
Swamp Area Gas Gathering for Mechanical Inspector
N-LNG Gas SupplyT4/T5, EPC
for Upgrading of Ogbainbiri Flow
Station
DUTIES INCLUDE
Verification of Daily Steel Beam Erection Report with field fabrication/installation for signing by Client.
Documentation of Daily Work Done, on Fitting, Welding and Pipe Installation Work progress
Inspection of Pipes, Plates Materials, Fittings and Welding Consumables according to Mill Report (MTR).
Modification of Piping, Fabrication and Installation Drawing
Monitor all pre-weld, in-process and post weld inspection; welding consumables as applied to Duplex, SS, CS, LTCS as per project specification.
Carried out field piping inspection, surveillance and quality control activities on sites.
Ensure that all welding, heat treatment, any hardness test inspection and non- destructive testing are in compliance with the relevant codes and specifications.
Carried out specific inspection on materials, equipment and construction /installation activities on site.
Verifying conformity of the work to specified quality requirement and ensuring that the inspection and controls are carried out in accordance with the quality document.
Marking of all welding repair areas / failures, completion of Notification Request of weld Repairs and completion of contact specific weld Repairs Logs.
Ensuring that all Inspection and Testing (Hardness, RT, UT, MT, PT, etc) are carried out based on the latest revision of the approved drawings, specification and procedures.
Interpretation of NDE (RT) files for completed weld short at the workshop and on site COMPANY POSITION DATE
Daewoo Nigeria Limited (DN57) Tank Project Engineer 2013 Swamp Area Gas Gathering for
N-LNG Gas SupplyT4/T5, EPC
For Upgrading of Ogbainbiri Flow
Station
DUTIES INCLUDE:
Review/Interpretation of Drawing (e.g. detail drawing, Isometric, Column Arrangement and P&ID)
Inspection of Steel, Plates Materials, Fittings and Welding Consumables according to Mill Report (MTR).
Review of welding Qualification Record.
Documentation of all Construction activities as related to project execution plan.
Preparing daily Erection / Inspection Reports and submitting to Construction Manager.
Raising Inspection Notice for QAQC Department to Review and then to be Approved by the Client
Preparing Daily Modification and Installation report for singing by Client
Inspection/Monitoring of Repair joints
Monitoring of welding parameter on weld joints to ascertain heat input, using clamp meter and thermometer.
Carried out Surveillance of field fabrication / welding of Tank, Steel Beams, Risers and Header Beams for Well head/manifold and ensure strict compliance to code.
Material Receiving Inspection (Verification of Steel (Plate, Beam & Girder) numbers, MET number and Heat number) for Material Traceability.
Liaise with NDT crew for Radiographic (RT) Film Interpretation.
Closing of NCR (Non Conformance Report) and Closing of CAR (Corrective Action Report).
Repair of Non-conformance associated with Tank work fabrication and installation.
Pre Commissioning and Commissioning activities in completion of the project COMPANY POSITION DATE
Daewoo Nigeria Limited (DN65) QAQC Engineer 2015
Gbaran Infill Project Package 1 (Piping & Mechanical) Shell Petroleum Development Company
DUTIES INCLUDE:
Verification of QAQC Report with field fabrication/installation for signing by Client.
Documentation of Daily Work Done, on Fitting, Welding and Pipe Installation, Structure Erection and other QAQC Activities Work progress
Inspection of Pipes, Plates Materials, Fittings and Welding Consumables according to Mill Report (MTR).
Modification of Piping and Structural Fabrication and Installation Drawing
Monitor all pre-weld, in-process and post weld inspection; welding consumables as applied to Duplex, SS, CS, LTCS as per project specification.
Carried out field inspection, surveillance and quality control activities on sites.
Ensure that all welding, heat treatment, any hardness test inspection and non- destructive testing are in compliance with the relevant codes and specifications.
Carried out specific inspection on materials, equipment and construction /installation activities on site.
Verifying conformity of the work to specified quality requirement and ensuring that the inspection and controls are carried out in accordance with the quality document.
Marking of all welding repair areas / failures, completion of Notification Request of weld Repairs and completion of contact specific weld Repairs Logs.
Ensuring that all Inspection and Testing (Hardness, RT, UT, MT, PT, etc) are carried out based on the latest revision of the approved drawings, specification and procedures.
Interpretation of NDE (RT) files for completed weld short at the workshop and on site. COMPANY POSITION DATE
NIVAFER Steel Construction QAQC Engineer 2015
Company of Nigeria Limited (Vessel & Stack Fabrication) DUTIES INCLUDE:
Verification of QAQC Report with Workshop fabrication/installation for signing by Client.
Documentation of Daily Work Done, on Fitting, Welding and Pipe Installation, Structure Erection and other QAQC Activities Work progress
Inspection of Pipes, Plates Materials, Fittings and Welding Consumables according to Mill Report (MTR).
Modification of Vessels and Stacks Fabrication and Installation Drawing
Carried out field inspection, surveillance and quality control activities on sites.
Carry out visual inspection of fit-up, alignment and welded joint based on acceptance criteria.
Ensure that all welding, heat treatment, any hardness test inspection and non- destructive testing are in compliance with the relevant codes and specifications.
Ensuring that all welding operations are executed in accordance with all relevant codes of practices and company procedures/practices.
Verifying conformity of the work to specified quality requirement and ensuring that the inspection and controls are carried out in accordance with the quality document.
Ensuring that all Inspection and Testing (Hardness, RT, UT, MT, PT, etc) are carried out based on the latest revision of the approved drawings, specification and procedures.
Interpretation of NDE (RT) files for completed weld short at the workshop
SKILLS ACQUIRED AND STENGTH
Proficient in computer application software (MS word, Excel, Access, Power Point, Corel Draw and Auto CAD etc)
Good knowledge of Destructive and Non-Destructive method of Testing(NDT) Such as VT, RT, MT, PT, UT, Tensile Test, Bend Test, and Nick Break Test etc.
CONVERSANT WITH THE FOLLOWING CODES/STANDARDS
AP1 650, ANSI B31.3, B31.4 & B31.8; AWS D1.1; ASME IX BS EN 288-3,287-1
MEMBERSHIP
Nigerian National Association of Fitters (NNAF)
American Society of Nondestructive Test (ASNT)
Project Management Institute (PMI)
HOBBIES
Reading, Traveling and Sporting
REFEREES
S.B. Shim
QAQC General Manager
Daewoo E&C DN-57
Mr. Jongmyung Kim
Tank Const. Manager
Daewoo E&C DN-57