Professional summary:

Focused and seasoned utility manager with a superb record of client satisfaction. Able to function well independently or as a team member. Excellent coordinator between management junior team members and local and state regulators.

Educational Qualifications:

Completed Master of business administration with 80% from Andhra university

Completed Bachelor degree in chemistry with 80% from Andhra university.

Completed Intermediate (Mathematics, Physics, Chemistry) with 80% from Board of Intermediate.

Completed SSC (Mathematics, Physics, Chemistry) with 80% from Board of secondary school of education.

Having Boiler attendant certificate from A.P Boilers, India.

Core Qualifications:

Commissioning of utility plants.

Outstanding knowledge of boiler operations and utilities.

Deep Knowledge of steam turbines, driven high pressure pumps, high purity water treatment procedures and heat transfer machines.

Proficient with Boilers, cooling towers, compressors, condensate systems, feed water systems, process steam systems, cryogenic systems, fire water systems and waste water systems.

Excellent ability to foster and sustain positive professional relationships.

Sound ability to manage and coach team members in a manufacturing environment.

Outstanding time management and organizational skills.

Good written and oral communicational skills.

Ability to execute work responsibilities under the most stressful situations while maintaining a confident and positive approach.

Key Skills:

PLC &SCADA panel operations of utility plants.

Various centrifugal, positive displacement and mixed flow types pumps operations.

Monitoring the plant while normal operations, following standard operating procedures and maintaining process parameters.

Planned start-up and shutdown of the plant.

Taking proper action during emergencies.

Ensuring safety and reliable operation of the plant.

Assisting the shift supervisor in technical issues and trouble shootings.

Reviewing day to day operations of utility plants.

Coordinating with maintenance group to have repair and modifications of the equipment in the unit.

Professional experience (7.5+years):

Utility Jr. manager, September2015 to Present

MATIX FERTILISER AND CHEMICAL LTD,

Panagarh, Bradman district, west Bengal.

(Coal bed methane based plant, world largest single unit plant-3850mtpd urea).

Commissioning and start up of utility units which are cooling towers, instrument air and plant air systems, nitrogen generation plant, demineralisation water treatment plant, effluent treatment plant, Auxiliary Boilers, heat recovery steam generators, fire water systems and steam turbine generator.

Supervised construction and ensured piping, equipment and instrumentation were in accordance.

Handling engineering responsibilities for all site utilities.

Maintaining utilities SOPs and record managing systems.

Utility Jr. engineer, April 2009 to August2015

NAGARJUNA FERTILISERS AND CHEMICALS LTD,

Kakinada, Andhra Pradesh, India.

(Natural gas based plant, Double unit plant-3800mtpd urea)

Performed in various utility plants start up and shut down activities which are Boilers, cryogenic air separation plant, ammonia refrigeration plant, water treatment plant, cooling towers, heat recovery steam generators.

Actively participated in inspection of steam turbines, compressors, distillation columns, ammonia storage tanks etc.

Appreciated for standing best at trouble shootings, logical thinking and for excellent handling of emergencies and for hard work.

Handling, loading & unloading various hazardous fluids which are HCL, NAOH, LIQ NITROGEN, LIQ AMMONIA, SULPHURIC ACID.

Performed in chemical treatment in cooling towers, boilers and water treatment plant.

Following safety acts and work permit system.

SAFETY :

Good experience in working with clod and hot work permit system.

Actively participated in safety meetings and discussed about unsafe conditions, near misses, safety procedures and policies.

Participated in safety mock drills.

Good knowledge about personal protective equipment.

Followed equipment isolation procedure, vessel entry procedure and nitrogen purging of the equipment for hydrocarbon freeing during maintenance.

Keeping strict vigilance and taking corrective measures for pollution control.

PLANT DETAILS:

Compressor house-

Instrument air-Elliot centrifugal compressors (2 no’s),2200Nm3/hr with 8.0 Kg/cm2 and includes instrument air dryer unit.

Instrument air- 2 no’s centrifugal compressors,3500Nm3/hr each with 9.0kg/cm2.

Booster compressors-2 no’s reciprocatingcompressors,5500Nm3/hr with 40.0kg/cm2 each.

Plant air-Khosla reciprocating compressors (2 No’s), 900Nm3/hr with 7.0 Kg/cm2.

Nitrogen generation plant (Cryogenic air separation plant)-

Made by Air products, U.K., with 600 Nm3/hr GAN flow, 9.0 Kg/cm2 0.1ppm of O2 with Dual mode such as GAN and LIN-GAN mode.

Ammonia Storage and refrigeration system-

Atmospheric double wall double integrity tanks (2 No’s),5000MT each and 3 No’s KSB centrifugal pumps with 35 m3/hr at 28.0 K sc.

45 TR Refrigeration system with 3 No’s lubricated screw compressors with capacity controlling system.

Auxiliary Boilers-

Made by Mitsui Engineering &ship Building company ltd, JAPAN,

2 units with 100 TPH each, 108 kg/cm2, 515 Deg.

Made by THERMAX with 100TPH, 120 kg/cm2, 520Deg.

Waste heat recovery Boilers-

Made by MACCHI, ITALY,2 units with 60TPH each,39 kg/cm2,400Deg

Made by THERMAX with 80 TPH for HP boiler and 30TPH for IP boiler.

Demineralization plant (ION EXCHANGE PLANT)-

Made by THERMAX,4 No’s streams each of 75m3/hr,0.02 ppm silica.

3 No’s streams for process condensate(135m3/hr each) and 2 No’s streams for Turbine condensate(250 m3/hr each).

Cooling Towers –

Made by Parahpur, cross flow,induced draft, open circulation type with 13 No’s cells, 3600 m3/hr capacity each with 45000 m3/he recirculation capacity.

Cooling water treatment by Chembond water drew treat ltd, Mumbai.

Steam turbine generator-

Made by SKODA with 30 MW capacity.

Gas Turbine generator-

Made by GE Engineering with 26MW capacity.

I hereby declared that the above mentioned details are true to the best of my knowledge and belief and I assure that I will remain committed to my work to the best of my ability if I am selected.