Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Pakistan
Posted:
July 24, 2016

Contact this candidate

Resume:

BILAL SHAH JAHAN KHAN

PRESENT ADD:

Tank Factory, Heavy Industries Taxila, Taxila Cantt -

Pakistan.

PERMANENT ADD: B-12 Al-Falah Housing Society, Shah Faisal Colony, Karachi - Pakistan.

CONTACT NO. : +923**-*******

EMAIL: acvuf4@r.postjobfree.com

WORK EXPERIENCE:

1. HEAVY INDUSTRIES TAXILA (DEC 2014 – PRESENT)

ASSISTANT WORKS MANAGER (BPS-17)

Officer In charge of Assembly Section in Tank Manufacturing Factory. RESPONSIBILITIES:

Installation of electrical assemblies in Hull and Turret of Tank Al-Khalid-I.

Fault analysis and rectification of faults in Electrical system of tanks.

Testing and Commissioning of Electrical System of Main Battle Tanks.

Preventive maintenance of machinery used at different stages in production line.

Responsible for raising indents for Indigenous Development of tank related assemblies, essential tools and spares as per SOP.

Preparation of draft RFP and evaluation of proposals tendered by vendors.

Technical evaluation of assembly prototypes developed by contractors on Test Jig as well as on field.

2. SALFI TEXTILE MILLS (SEP 2014 - NOV 2014)

ASSITANT MANAGER - ELECTRICAL MAINTENANCE

RESPONSIBILITIES:

Installation of LV motors and protective devices.

Preparation of technical specifications and bill of quantities.

Selection of protection device.

Electrical load calculation.

ACADEMIC QUALIFICATIONS:

Ser. Education Year Institution Grade

1. BE (ELECTRICAL) 2014 NED UET 81 %

2. INTERMEDIATE 2009 Adamjee Govt. Science College 83 % 3. MATRICULATION 2007 Karachi Public School 88 %

PROJECT WORKS:

FINAL YEAR PROJECT: To study, analysis, verification, optimization and simulation of Power System Equipment of medium voltage electrical network of UCH-II Power Plant using ETAP as a tool.

DESCRIPTION: The project is based on short circuit study, load flow analysis and protection coordination using ETAP as tool for UCH-II Power Plant by the help of Schneider Electric. OTHER PROJECTS:

To study, analysis, verification, optimization and simulation of Power System Equipment of medium

voltage electrical network of INTERNATIONAL STEELS LIMITED Power Plant using ETAP as a tool.

INTERNSHIP:

FAUJI FERTILIZER COMPANY (1stJune 2012 to 29th June 2012) TASKS PERFORMED:

Study of one line diagram and Orientation of switchgear.

Protection relay coordination concept.

Study of motor control and power center.

Study of MV and LV motors and Transformers.

SHORT COURSES:

Ser. Course / Training Institute Duration

1. Project Management And SPSS Pakistan Planning And Management Institute – Islamabad

4 x days

2. Complete Project Cycle

Management

Pakistan Planning And Management

Institute – Islamabad

10 x days

3. Power System Network Analysis

Using ETAP As Tool

Pvt. Training From Instructor Ex

Schneider Electric

30 x days

4. SIMATIC S7-1200 PLC’S & HMI’S NED UET 4 x days

5. Advance Power System

Protection

NED UET 2 x days

TECHNICAL SKILLS:

Can perform short circuit study, load flow analysis and protection coordination study using ETAP.

Hands-on experience on AUTOCAD.

Proficient in MS-Office and ECAT.

Strong Mathematical and analytical skills.



Contact this candidate