Post Job Free

Resume

Sign in

Painting supervisor or inspector

Location:
Indonesia
Posted:
July 15, 2016

Contact this candidate

Resume:

CURRICULUM VITAE

RUDI HERMAWAN.ST.

NACE International, Level 2-certified #30656#.

Dated of Birth / Place : 7 October 1969, Belinyu Bangka Indonesia.

Passport : A 0437777 ( Valid until Oct 2nd, 2017 ).

Current Address : Bengkong Pertiwi Block A. No: 6 Batu Ampar Batam Indonesia.

Home : Saphire Residance Block E. No: 4 Jatibarang Indramayu Indonesia.

Objective : Coating & Painting Inspector or Painting Superintendent.

Email : acvpj0@r.postjobfree.com

Hand Phone : +628**********.

Skype ID : hermawan.rudi69

PROFESSIONAL PROFIL.

Having background in bachelor degree qualification of Naval Architecture, with more than 13 ( thirteen ) years experiences in world class Oil and Gas Project Construction / Fabrication of fixed up offshore platform, Sea Water Treatment Module, Well Head Plat Form, Oil Rig, FPSO, LNG Vessel & Plant on shore, Marine repair project, Ship building project, both in country either overseas.

Process oriented and target oriented.

Good adaptability to be a part of team to achieve the goal of project / company.

Having management skills and leadership.

Able to willing to work in all condition and ready to be assigned at any place/site.

SKILLS.

Rudi Hermawan is qualified to perform advanced coating inspections using both non-destructive and destructive techniques and instrumentation. He has sufficient knowledge of specialized coating materials and techniques for the surface preparation and application used on the a wide variety of substrate. He also ample knowledge in advanced report writing, condition surveys, failure analysis’ and refurbishment.

Code Standard : Familiar with following codes / standards e.g:

NACE International and SSPC standard.

ISO / BS standard for coating Insulation, PFP.

ASTM standard for coating Insulation, PFP.

ISO 9001-2008 for Quality Management System.

Computer : Microsoft Office, Oracle application, etc.

Language : English ( full proficiency ), Indonesian, Malay.

Educational Backgrounds :

Bachelor Degree – Naval Architecture, Faculty of Technic, GPA 3.02 of 4.00 Pattimura University Ambon Indonesia at 1998.

Survey & Topography PPD-1, Bandung Institute of Technology at 1989-1990.

Senior High School SMA Negeri Belinyu Bangka, 1986-1989

Training Qualification :

NACE Course “CIP Level 2“, Batam 7- 12 July 2014 by NACE organization with Certificate CIP. no: 30656.

NACE Course “CIP Level 1“, Jakarta 1-6 November 2010 by NACE organization with Certificate CIP. no: 30656.

Coating Inspector level I at “Certified Coating Inspector and Painting Practitioner Indonesia” by Lindung Silalahi NACE ID #3841 in April 2007.

Ship Survey for Non Surveyor by IKBAL. M. Yos and PT. Pan United Ship Yard Indonesia in 2005.

ISO 9001-2000 training course at PT. Pan united Ship Yard Indonesia in 2004.

ISO 9001-2008 Quality Management System at Malaysia Marine & Heavy Engineering. Bhd. 2010.

Effective Negotiation Skills Course at Malaysia Marine & Heavy Engineering Holding. Sdn. Bhd. by Best Partner Training Centre September 2012

Microsoft Excel 2007 level 1 at Malaysia Marine & Heavy Engineering Holding. Sdn. Bhd. By Best Partner Training Centre October 2012.

Work Experience:

Siemens. Pte.Ltd. – Painting Inspector.

October 2015 – Present.

Ghana OCTP Development Project Sea Water Module FPSO at Profab Yard Batam.

Test qualification of blaster and painter, testing recording and reporting of contamination material blasting, testing recording and reporting pressure of air compressor, Testing recording and reporting air compressor contamination, Pre inspection after fabrication, Daily inspection for blasting preparation and visual standard blasting profile and dust level, Painting application recording and reporting of Ambient condition of humidity, Visual inspection of painting surface from all paint defect, Dry film thickness recording and reporting, Adhesion testing of painting quality, Holiday testing. Inspection fire proofing application & Coating & Insulation application.

PT. Saipem Indonesia Karimun – Coating Inspector.

May 2015 to October 2015.

FPSO Kaombo Total Angola Project.

Test qualification of blaster and painter, Testing recording and reporting of contamination material blasting, testing recording and reporting pressure of air compressor, Testing recording and reporting air compressor contamination, Pre inspection after fabrication, Daily inspection for blasting preparation and visual standard blasting profile and dust level, Painting application recording and reporting of Ambien condition of humidity, Visual inspection of painting surface from all paint defect, Dry film thickness recording and reporting, Adhesion testing of painting quality, Holiday testing. Material recording and reporting. Passive Fire Protection equipment using the organic coating Chartec.

Sapura Kencana Petroleum. Bhd – Lumut Malaysia – Painting Supervisor.

June -2013 To 30 April 2015.

Self Erected Tender Drilling Rig Project & Semi-Submersible Self Erecting Tender Assisted Drilling Rig Project.

Supervises & Inspection Ballast 22 number tank inspection with PSPC tank coating requirement .

Undertakes and supervises the inspection of painting, coating, insulation, fire proofing, riser pipe PPS sleeve coating and surface preparation jobs as per international standards including arranging the man power for blasting painting activity, Inspecting blasting painting equipment during production activity for safety measures.

Estimation area blasting painting for Semi-Submersible Tender Assisted Drilling Unit.

Prepared blasting painting scope of work & prepare subcontractor requisition submitted to PSC department for sub-contractor tender.

To create blasting painting schedule as per project manager planning & organize the implementation blasting painting work as per painting schedule.

To create paint matrix that will be used as a reference for the paint manufacture used as paint specification.

Coordinate the progress blasting painting activity with other department as per Construction manager planning.

Conduct production meeting & safety meeting to construction manager & PMT team.

Preparing the work completion report that approved by owner representative for submission to project manager, cost control department & PSC department.

Approving the completion report.

Malaysia Marine & Heavy Engineering. Bhd – Johor Malaysia – Technical Executive Blasting Painting ( Blasting Painting Engineer ).

April 2008 To April 2013.

Rig Nang Nuan 252 Convertion to MOPU Satu.

FPSU Pyrenees Venture.

LNG Puteri Nilam Satu.

VLCC Idemitsu Maru.

Marine Repair Project.

Undertakes and supervises the inspection of painting, coating, insulation, fire proofing, riser pipe PPS sleeve coating and surface preparation jobs as per international standards including arranging the man power for blasting painting activity, Inspecting blasting painting equipments during production activity for safety measures. Daily blasting painting preparation inspection & testing.

Coordinate the progress blasting painting activity with other department as per project manager planning.

Preparing the work completion report that approved by owner representative for submission to project manager, cost control department & PSC department.

Approving the completion.

PT. Hempel Paint Indonesia – Batam – Coating Adviser.

July 2007 – April 2008.

Palma Shipyard – Ship Building Project.

Rotary Shipyard – Cooling Natural Gas System Heat Exchanger Indonesia Project.

Nippon Steel Indonesia – WHP North Belut Conoco Phillip Indonesia & WHP Peciko Phase 5 Total Indonesia Project.

Preparing technical specifications for painting and coating based on the performance and compatibility including;

Technical services in painting progress and ship data report for new building vessel and new barge at PT. Palma Progress Shipyard in Batam.

Technical services for painting progress LNG cooler system 108 unit at PT. Rotary Engineering Indonesia in Batam.

Technical services i.e. inspection, testing, and monitoring painting progress of offshore project at Nippon Steel Batam for Conoco Phillip Project of North Belut WHP-C, WHP-D and Total project of Peciko Phase-5.

Estimating the area for new building project submitted to sales and manager to prepare the quotation.

Designing the coating and painting specification for ship building project.

Preparing and submitting the ship data report to Hempel Manager.

PT. Sembawang Marine Offshore & Engineering Indonesia – Batam – Painting Supervisor.

March 2006 – October 2006.

Undertakes and supervises the inspection of painting, coating, insulation, fire proofing, riser pipe PPS sleeve coating and surface preparation jobs as per international standards including arranging the man power for blasting painting activity, Inspecting blasting painting equipment during production activity for safety measures.

Estimation area blasting painting for WHP Kerisi Project of Conoco Phillip Indonesia & FPSO Bohay Project of Conoco Phillip China.

Prepare blasting painting scope of work & prepare subcontractor requisition submitted to PSC department for sub-contractor tender.

To create blasting painting schedule as per project manager planning & organize the implementation blasting painting work as per painting schedule.

To create paint matrix that will be used as a reference for the paint manufacture used as paint specification.

Coordinate the progress blasting painting activity with other department as per Construction manager planning.

Conduct production meeting & safety meeting to construction manager & PMT team.

Monitoring & supervise of Fire proofing application of the module topside.

Preparing the work completion report that approved by owner representative for submission to project manager, cost control department & PSC department.

Approving the completion report submitted by sub-contractor to PSC department.

PT. Pan United Shipyard Indonesia – Batam – Blasting Painting Supervisor.

February 2003 To March 2006 & October 2006 to July 2007.

Prepares and plans schedule, inspection for the execution of painting maintenance especially in offshore structure projects such as drilling rigs and platforms & vessel repair. To prepare subcontractor requisition with detail work scope as per estimation. To prepare work completion report & submitted to Cost control for billing charging to client company.

Notice Period : one month notice.

References:

1.Abdul Muttalib.

Senior Coating Inspector PT. Eni Indonesia at Saipem Karimun Yard Project.

Address : Kavling Kamboja Block L no: 20 Dapur 12 Batuaji Batam Indonesia.

Email : acvpj0@r.postjobfree.com

H / P : +628*********.

2.Ong Choon Cheong.

Construction Manager Ship Building Department Sapura Kencana Petroleum. Bhd.

Email : acvpj0@r.postjobfree.com

H / P : +601********.



Contact this candidate