Piping and mechanical engineer with over 6 years of extensive offshore experience in the process plant construction (EPC - EPCM), structural, mechanical and piping (SMP) installation, fabrication, Pressure testing specification
Working for biggest offshore company in Iran(IOEC)
Working in biggest offshore project (South Pars Gas Field - Phase12)
Working knowledge of pipe, pipe fittings, valves, piping support, insulation, insulation jacketing, and equipment installation
Good knowledge of engineering, procurement, fabrication, transportation, pre-commissioning, installation and commissioning of oil and gas offshore platforms
Adequate knowledge of the required design standards such as ASME, ASTM, API and specifications of oil and gas (offshore and onshore) projects
Knowledge of piping and HVAC construction procedures. Also good knowledge about piping material such as C.S,S.S, Inconel, Copper Nickel, GRP, GRE, LTCS, Galvanized,…
Sufficient proficiency in software such as PDMS, ANSYS, SolidWorks, AutoCAD 2D and NavisWorks
PROFESSIONAL EXPERIENCE
Asfalt Tous Company Abadan, Iran
Lead Piping and Mechanical Field Engineer 2015 to Present
Work on S1 offshore platform construction project.
Approval, checking and preparation of design/engineering documentation.
Undertake training of less experienced engineers, including duties as a mentor.
Assist and support the Project Manager to achieve the contract objectives
Supported planning and organization of site implementation work activities in line with project schedules to ensure information, materials, tools and equipment are fit for purpose, checked and certified prior to use
Responsible to supervise and manage all piping works undertaken and executed by subcontractors.
Responsible to supervise and manage all mechanical works associated with rotating equipment / machinery, undertaken and installed by the subcontractor.
Ensure work is carried out in accordance with relevant Codes, Standards and Procedures.
Compression between project specifications and piping and pipeline standard such as ASME B31.3 and DNV F101.
3D model Review and comparison between 3D model and P&ID, line list, PMS, plot plan, equipment List, D&ID, equipment vendor data sheet, pipe support standard drawings, piping design basis, piping & pipeline& riser fabrication specification and piping standard such as ASME B31.3 and DNV F101 and etc to extract all the discrepancies.
Preparing isometric, pipe and duct support, and equipment mounting detail and duct drawings with PDMS 3D model.
Preparing reports of PDMS such as MTO, Paint Area, Insulation Area, Pipe support weight, piping work(Dia.Inch)
Acted as a technical conduit at site between engineering and construction personnel and manage TQ’s and site queries.
Preparing technical reports, lists of outstanding items on a punch list submits it for construction to carry out the required test.
Relating with consultant and other disciplines to clear prepared comments by client and sub-contractor.
Supervising the proper conduct of Line Checking, Flushing, Hydrotest, Drying and reinstatement
Iranian Offshore and Construction Company (IOEC) Khorramshahr, Iran
Piping and Mechanical Supervisor 2011 to 2015
Work on Offshore platform and facilities construction and installation of South Pars Gas Field projects, Phases (12A,B,C), (19A,B,C), 20, 21
Comparison between model and P&ID
Preparing isometric, pipe and duct support, and equipment mounting detail and duct drawings from PDMS 3D model.
Supervising on construction work
3D Modeling of pipes up to 2” (PDMS) to determine optimum rout & to study pipe supports feasibility.
Preparing hydrotest and equipment packages to release by client.
Abadan Oil Refinery Company Abadan, Iran
Piping Draftsman 2009 to 2011
Preparing isometric drawings according to prepared PFD by process discipline with solidworks and AutoCAD.
Kerman Cement Company Kerman, Iran
Tutor Nov,2009
Teaching Ansys and Solidworks software.
EDUCATION & CERTIFICATE
Bachelor in Mechanical Engineering Shahid Bahonar University, Kerman, Iran,2007
IMS Moody International Company, Iran,2014
BOSIET Kish Sea Safety School, Iran,2014
PATENT
Head shower reducing water consumption Issued NO. 72141, Iran,2011
HONOR
Top Researcher Iranian Offshore and Construction Company,2014