Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Bekasi, West Java, Indonesia
Salary:
5000
Posted:
June 29, 2016

Contact this candidate

Resume:

Khusni Eka Wardana

Email : acvhw1@r.postjobfree.com

Mobile +62-815********

Bangladesh +880**********

http://www.id.linkedin.com/in/khusniekawardana

RAN & Transmission Engineer

RBS Ericsson 6000 Series 2G/3G/LTE

Ethernet Microwave Transmission System

Transport Network Performances Analyst

PDH, SDH, IP Ethernet Transport

Ericsson, Huawei, NEC

WAH (Working at Height) & First Aid Certified

Personal Information

Marital status : Married

Citizenship : Indonesian

Born : 18 August 1984

Based in : Jakarta – Indonesia

Summary Education :

Professional Specialities

Professional Experience

Training Experience :

Reference :

2001-2005 : STTTelkom - Telkom University

Bachelor in Electrical Telecommunication Engineering (3.61 GPA)

RBS Ericsson 6000 Series 2G/3G/4G LTE

Ericsson MLE, MLHigh Cap, MLTN, SOEM, SPI

NEC MW NEO IPASO PNMS

Huawei RTN MSTP OSN DWDM

IP Transport Network

Capacity, Performance & Quality IP Ethernet Services

Project Name : Axiata Robi 3G Expansion 2015

Company Name : Ericsson Bangladesh

Project Location : Bangladesh Dhaka & Comilla

Start Project : October 2015

End Project : April 2015

Possition : Transmission IP Transport & RAN Integration Engineer

Project Director : Mr. Mir Saad Ali

Project Director : Mr. Waskito Noegrohodjati

IP Transmission Transport Engineer - Fast Ethernet

Project Manager : Mr. Hasan Kazi Mahmudul

• Interface with several parties for project rollout (Project Manager, customer, ASP/vendor)

• Hand on Ericsson TN TN R 5.1.3, NPU3D, NPU1C, MMU3A

• End to End FE Network preparation for Node (Layer2, Native Ethernet, VLAN)

• Nodal Preparation Swap TN AMM6P to TN AMM20pB, Slot ReEngineering

• FE MUX Connection at POP Site

• XPIC Transmission Features

• FE Ring Protection Preparation

• Troubleshooting Support Ethernet Traffic, Quality & Performances

• Rectification Issue Report

RAN Integration Engineer – 3G NodeB Integration Engineer

Project Manager RAN : Mr. Rejwan Tahmim

• Experience in Supervision subcontractor doing installation for RBS 6601 with Psi solution and 3x1 configuration

• Experience in Integration and commissioning site for RBS 6601 DUW20 & DUW31

• Upgradation Capacity 3G Psi Sollution to 3x1 Sector

• Experience in Troubleshooting site for RBS 6601 & and VLAN integration Packet Link Data, Switch Port and MAC address connectivity from RBS until RNC

Project Name : TORPEDO - Transport Network Performances 3G XL Axiata & LTE XL Axiata Big Bang Launching

Company Name : Huawei Services

Project Location : Jakarta, Banjarmasin, Purwakarta, Cirebon, Tegal, Semarang, Solo, Yogyakarta

Start Project : November 2014

End Project : October 2015

Possition : Transport Network Performances

Project Manager : Dimas Arya Baskoro

Transport Network Performances

Transmission Network Analysis, Transport Network Performance and Optimization, Access Network Performance and Optimization, Planning Guidelines for IP network. End to End TNP Network Performance Monitoring and Optimization, Tranpsport Congestion, Quality, Alarm Handling

The NodeB Performances KPI is set based by 4 categories: Rejection, Loss, Jitter, Delay

Performed Maintain End to End Transport end to end Bandwidth Utilisation

Performed Maintain End to End Transport Quality Performances

Performed Optimization reconfigure the paramater, to adjust the bandwith capacity, QoS and other parameter

Performed Optimization End to End Transport Iub Link to achieved the KPI

Performed End to End Trobleshooting trace the problem in the IuB link form NodeB to RNC by MacAdd and Vlan ID

Performed Transport Transmission Huawei : RTN, U2000, MSTP, M2000

Performed Transport Transmission Ericsson : Minilink TN R4, Minilink TN R5, SOEM

Performed Transport Transmission NEC : IPASO, NEO, PNMS

LTE Big Bang Event Launching Jakarta (Kelapa Gading, PRJ Kemayoran, ICE BSD Gelora Bungkarno, Senayan City), Surabaya (Sutos) Bogor (Botani Square) Transport Network Performances Preparation

Project Name : Indosat Transmission 2G & 3G Roll Out - 2014

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2014

End Project : November 2014

Possition : Transmission Engineer

Project Manager : Mr Tohap Richard Sihomibing acvhw1@r.postjobfree.com

Line Manager : Yulpien Teng acvhw1@r.postjobfree.com

Transmission Engineer

Plan & Execute Project Implementation, supervise Implementation Installation & commisioning ethernet transmission

Coordinate with field support team to goal the project Make sure project successful to be done technically

Support maintenance existing equiptment, improve network performances & upgrading equiptment & configuration

Review & troubleshooting detailed technical problem

Generate & reporting to Project Manager about progres, blocking & sollution

Assist Project Management organize the document acceptance to Customer

Technically Support Transmission Network : TN R.5 6pC & 2pB, Ethernet Transmission, Create & Verification VLAN, Traffic & Congestion. Upgrade Capacity & Maintain Performances.

SOEM Integration

Create NMS (DCN over VLAN, DCN over Traffic, OSPF & Static Routing

Perform Installation, Configure & Upgrade NMS Server, SoEM Baseline

Commisioning & Integration adding the new Network Element MLTN to SoM R8 and Migrating Integration to some R10.3 R10.4 & the Latest R12

Generated & Collect Performance & Alarm by SoEM

Supporting End to End Network Element Routing Integration through to Cisco & Metro Ethernet.

Maintain & Troubleshoot & Upgrading Network Element that already connected SoEM

Project Name : Indosat Transmission 2G & 3G Roll Out - 2013

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2013

End Project : Desember 2013

Possition : Transmission Engineer

Project Manager : Mr Bagus Fakhirul acvhw1@r.postjobfree.com

Transmission Engineer

Plan & Execute Project Implementation

Supervise Implementation Installation & commisioning ethernet transmission

Coordinate with field support team to goal the project

Make sure project successful to be done technically

Review & troubleshooting detailed technical problem

Support maintenance existing equiptment

Mantain & Improve the network performance

Support upgrading equiptment

Generate & reporting to Project Manager about progres, blocking & sollution

Assist Project Management organize the document acceptance to Customer

Technically Support Transmission Network : TN R.5, Ethernet Transmission, Create & Verification VLAN, Tranffic & Congestion. Upgrade Capacity & Maintain Performances, NMS Integration, SoEM NE Integration

Support SOEM Integration

Create NMS (DCN over VLAN, DCN over Traffic, OSPF & Static Routing

Commisioning & Integration adding the new Network Element MLTN to SoM R8 and Migrating Integration to SoEM

Generated & Collect Performance & Alarm by SoEM

Maintain & Troubleshoot & Upgrading Network Element that already connected SoEM

Project Name : Indosat 2G & 3G Roll Out - 2012

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2012

End Project : Desember 2012

Possition : Transmission Engineer

Project Manager : Mr Bagus Fakhirul - acvhw1@r.postjobfree.com

Installation Support and Supervising, Testing, Commissioning, Scan Frequency for test inteference, and Acceptance.TN R4.3 TN R4.4 and TN R5

Performed advance troubleshooting for Mini Link Traffic Node TN R4 TN R5

Performed software upgrade Traffic Node from Mini Link TN R3 to R4 to R5

SBL Upgrades of all the Nodes of the Network to the Latest Release MINI-LINK_TN_5.0_R24E16 using Minilick Craft V 2.20

TCU 2G Abis Over IP Implementation

Support Hot Swap 2G TDM to Abis Over IP via TCU

Preparation and Support Native Ethernet Traffic for Abis Over IP

Preparation and Support Transmission Native Ethernet Traffic for New Site and Swap NodeB 3000 to NodeB 6000, Create Ethernet Traffic Routing for Node B on Mini Link Traffic Node (Configuring SFPs, LAN ports, Switch ports, WAN ports and creating VLANS for traffic and O&M using MMU2D, NPU1C, NPU3, NPU3B and ETU3, Integration to ME (Metro Ethernet))

Ethernet Over SDH / E1 and Ethernet Over IP with PDH IME and RL-IME

Rehoming Preparation, Reconfiguring of Ethernet Traffic Routing and VLAN

Preparation E1 - TDM End to End Cross Connection for New Site 2G

ReEngineering Site – Transmission TN based

NMS Integration ( SOEM, Static Route, OSPF Route, Cisco Router, and Integration with Metro Ethernet for NMS Core Traffic, DCN Over VLAN, DCN over Traffic, Restore the T.N visibility, Add the new NEs on SOM & ensure their availability, Troubleshooting the IP conflict and loss of visibility issues arising during the DCN configuration using TELNET)

Report to Team leader and Project Manager

Advise customer about operation and technical question related of TN R-4

Project Name : Indosat 2G & 3G Roll Out - 2011

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2011

End Project : Desember 2011

Possition : Transmission Engineer

Project Manager: Mr Bagus Fakhirul - acvhw1@r.postjobfree.com

Preparation and Support Transmission Native Ethernet Traffic for New Site and Swap NodeB 3000 to NodeB 6000

Create Ethernet Traffic Routing for Node B on Mini Link Traffic Node (Configuring SFPs, LAN ports, Switch ports, WAN ports and creating VLANS for traffic and O&M using MMU2D, NPU1C, NPU3, NPU3B and ETU3, Integration to ME (Metro Ethernet))

Setting configuration for Dual Stack Traffic

Ethernet Over SDH / E1 and Ethernet Over IP connection with PDH IME and RL-IME

Rehoming Preparation by Reconfiguring of Ethernet Traffic Routing and VLAN

Preparation E1 - TDM End to End Cross Connection for New Site 2G

Installation Support and Supervising, Testing, Commissioning, Scan Frequency for test inteference, and Acceptance.TN R4.3 TN R4.4

Performed advance troubleshooting for Mini Link Traffic Node TN R.4.X

Performed software upgrade Traffic Node from Mini Link TN R3 to R4

SBL Upgrades of all the Nodes of the Network to the Latest Release R 4.4.FP (R22B14) using Minilick Craft V 2.15

ReEngineering Site – Transmission based TN

Advise customer about operation and technical question related of TN R-4

Project Name : Indosat 2G & 3G Roll Out - 2010

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2010

End Project : Desember 2010

Possition : Transmission Engineer

Project Manager : Mr Bagus Fakhirul - acvhw1@r.postjobfree.com

Preparation and Support Transmission Integration Native Ethernet Transmission 3G NodeB 3000

Preparation and Support TDM End to End Cross Connection for New Site 2G

Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance.TN R4.1

Supporting for Rehoming (Changing Routing and VLAN)

Integration NMS (Network Management System)

Project Name : Indosat 2G & 3G Roll Out - 2009

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : June 2009

End Project : Desember 2009

Possition : Transmission Engineer

Project Manager :

Mr. Syaiful Anis - acvhw1@r.postjobfree.com

Mr. Indratno - acvhw1@r.postjobfree.com

Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and A cceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4

Supporting for Rehoming (Changing Routing and VLAN)

Integration NMS (Network Management System)

Upgrading Software Baseline of ML Traffic Node

Project Name : Trial IUB over IP 21 Mbps – Indosat - 2009

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2009

End Project : May 2009

Possition : Transmission Engineer

Project Manager : Mr.Syaiful Anis - acvhw1@r.postjobfree.com

Trial Implementation Support and Supervising, Testing, Commisioning Network ML TN R4.1 for Native Ethernet Traffic

Trial Implementation Support and Supervising, Testing, Commisioning Network ML TN R4.0 Ethernet over TDM

Project Name : Indosat 3G RO 2008

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : January 2008

End Project : Desember 2008

Possition : Transmission Engineer

Project Manager :

Mr. Rohanizam Ramly - acvhw1@r.postjobfree.com

BayuAryoSusanto - acvhw1@r.postjobfree.com

Mr.Syaiful Anis - acvhw1@r.postjobfree.com

Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4

Supporting team for Rehoming (Change Routing)

Supporting team for Moving Trafiic (Swap Upgrade)

Integration NMS (Network Management System)

Project Name : Indosat 2G + EDGE RO 2007

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : Mei 2007

End Project : Desember 2007

Possition : Transmission Engineer

Project Manager :

Mr. Rohanizam Ramly - acvhw1@r.postjobfree.com

Mrs. Diah Imawati - acvhw1@r.postjobfree.com

Mr. Sabra All Fajri acvhw1@r.postjobfree.com

Preparation End to End Cross Connect RBS 2G Indosat Site (Ericsson link and Alcatel), FO on Indosat Hub Site)

Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4

Troublesooting the Link Problem (Ericsson Link and Existing Cross Connect)

Implementation, Supervising, Testing and commissioning Minilink, Traffic Node and High Capacity Transmission. SOW : Swap Upgrade MLE 4-16E1, Upgrade 8-16E1, Swap Upgrade 16-32E1 TN, High Capacity with TN for Dropped E1

Supporting team for Moving Trafiic

Project Name : Indosat 3G Roll Out 2007 - Central Java

Company Name : PT. Ericsson Indonesia

Project Location : Central Java : Semarang, Salatiga, Pati, Kudus

Start Project : January 2007

End Project : Mei 2007

Possition : Transmission Engineer

Project Manager : Mr.Syaiful Anis << acvhw1@r.postjobfree.com >>

Preparation and Testing Cross Connect End to End 3G Indosat Site (Ericsson link and Alcatel), FO on Indosat Hub Site)

Supporting Team Cross Connect for monitoring TRM on RXI Aggregator for 3G Transmission

Troublesooting the Link Problem (Ericsson Link and Existing Cross Connect)

Supporting team for Moving Trafiic

Project Name : Indosat 3G Roll Out 2006

Company Name : PT. Ericsson Indonesia

Project Location : Jakarta – Bogor – Depok - Tangerang – Bekasi

Start Project : November 2006

End Project : Desember 2006

Possition : Transmission Engineer

Project Manager :

Mr. Rohanizam Ramly - acvhw1@r.postjobfree.com

Installation Support and Supervising, Testing, Commissioning and Setup Ethernet Native Traffic, Troubleshooting and Acceptance. Minilink (Minilink e-Classic, Hi-Cap & Traffic Node R3-R4

Preparation and Testing End to End cross connect Indosat site (minilink, pasolink, FO on Indosat Hub Site)

Supporting team for testing integration end to end Indosat equipment (RXI, FO)

Supporting Team for monitoring TRM on RXI Aggregator for 3G Transmission

Supporting team for Rehoming (Change Routing)

Supporting team for Moving Trafiic (Swap Upgrade)

Project Name : Telkomsel TINEM Roll Out 2006 Sumbagut

Company Name : PT. Ericsson Indonesia

Project Location : North of Sumatra - Medan

Start Project : March 2006

End Project : September 2006

Possition : ITC

Project Manager :

Mr. Fajar Manalu - acvhw1@r.postjobfree.com

Mr. Adam B Ompusunggu - acvhw1@r.postjobfree.com

Mr. Wima Sakti Ginting Email acvhw1@r.postjobfree.com Phone +628*********

Coordinate Clearence Alarm execution (Permit Access to Site, Administration, Requesting Material)

Site Monitoring (Update Database alarm site status (RBS Fault Code Class) for RFI Report, Check site status by WinFiol Software )

Ericsson RBS 2206 and 2106 Commisioning (Local OMT 29_3 Software)

Cross Connect RBS Link

Monitoring Service Provider for Clearence Alarm.

Supporting Team for Clearence Alarm

• Excellent in managerial to lead small team in certain area, controlling and reporting the project progress to Project Manager

• Excellent in Roll Out project to achieve all project target

• Excellent skill in cross connection & integration implementation

• Excellent in using various software’s as : MiniLink Service Manager (MSM), Marconi Local Craft, Minilink Craft For ML TN ( Configure MMU 2D, MMU 2H, ETU 1B, ETU 3B, NPU 1C, NPU 3B, LTU 155 E/O, Setting VLAN, Setting QOS, SNCP and RSTP), Minilink SP,

Nokia UltraSite Manager and Nokia FlexiHopper.

• Expert in Install, commissioning, and troubleshooting both in Minilink ( Transmission ) system and RBS Ericsson

• Strong knowledge in Minilink SP 210/310 and SIU

• Excellent in implementation NMS and DCN topology for Ericsson Equipment

• Telecommunication test equipment as : TEMS, BER Tester, Anritsu Site Master, Ethernet Tester

• Excellent in install, commissioning and troubleshooting RBS 6000

• Strong knowledge in Transmission

2016 RBS 6000 4G LTE Integration

2015 RBS 6000 2G/3G

2014 ML SP 210 Operation and Maintenance

2014 SPO 1410 Operation & Maintenance

2013 ML TN R5.1 Operational and Maintenance Native Ethernet Transmission

2012 ML TN R5.0 Operational and Maintenance Native Ethernet Transmission

2011 ML TN R4.3 Operational and Maintenance Native Ethernet Transmission

2010 ML TN R4.1 Packet Ethernet Traffic over SDH & PDH optimized Radio link,

2009 JDSU Test and Measurement (Acterna) Tools

2008 Demo and Training Petzl Safety Working and Tools

2007 Ericsson Indonesia, RBS 3G Commisioning RBS 3107 and RBS 3206

2006 Ericsson Indonesia, Medan Minilink-E & RBS 2106 Testing & Maintenance

2005 Ericsson Indonesia, Jakarta Minilink-E & RBS 2206 Standard Installation

2005 Minilink E Makro, E Mikro & RBS 2202 on Job Training

2005 Training for installation and commissioning Minilink Ericsson Microwave Radio by PT. LINTAS MEDIA TELEKOMUNIKASI

2005 Drive Test TEMS GSM Investigation Reporting. Sinergi Telecom, October

1.Rohanizam Ramly

PT. Ericsson Indonesia – Program Manager

acvhw1@r.postjobfree.com - +62-815******** (Mobile)

2.Tutiek Sundari

PT. Ericsson Indonesia – N&TC Project Manager

acvhw1@r.postjobfree.com - +628******** (Mobile)

3.Sabra All Fajry

PT. Ericsson Indonesia – Customer Project Manager

acvhw1@r.postjobfree.com - +628********* (Mobile)

4.Indratno

PT. Ericsson Indonesia – CPM Line Manager CD CSI

acvhw1@r.postjobfree.com - +628********** (Mobile)

5.YulpienTeng

PT. Ericsson Indonesia – Integration Manager CD RAN

acvhw1@r.postjobfree.com - +628******** (Mobile)

6.M. Raymil Mirza

PT. Ericsson Indonesia – Integration Manager CD RAN

acvhw1@r.postjobfree.com - +628********* (Mobile)

7.Dimas Arya Baskoro

Project Manager – E2E RAN Transport Performances

acvhw1@r.postjobfree.com +628**********

8.Mr Waskito Noegrohodjati

Project Director - Robi Bangladesh NRO 2015 Program

LM Ericsson Ireland Ltd.

acvhw1@r.postjobfree.com

+880 181******* (Bangladesh) +628********** (Indonesia)

9.Rejwan Tahmin

Project Manager – Ericsson Bangladesh LM

acvhw1@r.postjobfree.com +880**********

10.Md Abul Hasan

Implementation Manager - Ericsson Bangladesh LM

acvhw1@r.postjobfree.com +880**********

11.Shatil Arab T

Line Manager RAN – Ericsson Bangladesh LM

acvhw1@r.postjobfree.com +880**********



Contact this candidate