Post Job Free

Resume

Sign in

Manager Quality

Location:
Mumbai, MH, India
Posted:
June 25, 2016

Contact this candidate

Resume:

RESUME

**.* Yrs experiences in new product development, Supply chain management, global sourcing, supplier development, supplier quality, Green belt in six sigma & Certified Internal Auditor ISO/TS-16949

Anirban Saha – (0-976*******, acvfg9@r.postjobfree.com

Objective:

Want to be a member of a great team which involve in massive production with excellent quality.

A managerial position in strategic sourcing, Supplier quality, global sourcing, supplier development .part development team.

Current company details:

Company name: JOHN DEERE INDIA LTD. Pune

Industry type: Heavy vehicles, Tractors, Construction Equipment. Company turnover: 32 Billions (Worldwide)

Current position details:

Post: Manager Vendor development (Sourcing for New launch).

Commodity: Sheet metal fabrication (Body & Trim), Plastic parts, Rubber, Proprietary parts (Steering wheel, Seat, Tire, Tube, V belt), Machined parts & all imported parts commodity.

Reporting to: DGM (Vendor development-Project), Handling a team of five member.

Dept: Central Quality (New Product Development)

Current project: 5000 series upgrade, Export Cab tractor (1st time in India), 5000 series Tractor with VCU for USA /EU.

Current CTC details:

CTC: 13.40 Lacs per Annum. (Fixed) 15.50 (CTC)

Expectation: Managerial post with a challenging job through decision making authority, Salary –Negotiable

Preferred Location : Anywhere in India

Experiences details :

Total years of Experiences: 13.5 yrs .

JOHN DEERE INDIA LTD. Pune (Since 2012 16th Jan till date)

MAHINDRA&MAHINDRA (Automotive –Car manufacturing Plant, Nasik).

TATA JOHNSON CONTROLS (Pune & Jamshedpur Plant)

LIFELONG INDIA LTD (Gurgaon)

BRAHMA AUTO (P) LTD. (Gurgaon)

Core responsibility in current role:

(A)Sourcing quality deliverables for new development:

Manage and develop the existing and potential supplier pool and update the approved vendor list.

Search for new potential suppliers and develop a comprehensive supplier data base.

Identifying & analyzing the capabilities of suppliers and conducting techno commercial negotiation.

Define the scope of supply, cost finalization, supply and price agreements for new product development.

Ensuring APQP time line for new project SOP through co-ordination with Prog. Mgmt.

Responsible for manufacturing feasibility through GDNT, sign-off at the time of APQP kick –off.

Derive KPC (Key product characteristic), ECR and getting approval from engg dept.

T0, T1, PPAP, PTR run & component approval for the same through tool & mould trial & correction.

Supplier Assessment Survey,APQP Timeline, Defining Process Sequence, Tool Design Approval, Feasibility Study of Tool for Production, Attending tool try outs, Approving Tools, Welding Fixtures & Moulds

Determine quantity and timeline, adhering to project delivery schedule.

Involve in should costing and cost engineering discipline and work with cross functional teams.

Check and validate APQP, PPAP, SPC, MSA. PFD,, PFMEA, Control plan, Work instruction sheet, as per DEERE norms.

( B)Global sourcing for strategic integration

Monitoring supplier assessment survey &, leading the supplier for improvement.

Quality system implementation at supplier end as per global norms (JDQPS)

Conduct periodic audit of suppliers process capability and execution of necessary actions in order to provide necessary technical assistance and expertise for any observed bottlenecks

Capacity enhancement by improving process & taking cost benefit for same (through benchmarking).

Work closely with global Commodity Leaders to identify and assess localization opportunities

Track and report key functional metrics to reduce expenses and improve effectiveness.

Solving of supplier queries and other difficulties during development through specification meeting.

Monitor procurement target monitoring for each supplier in the BU as per the corporate policy.

Handling and realization of Risk and Claim Management including contractual agreements with suppliers.

Collection of information on prices & technical parts under consideration of commercial and technical requirements.

Identify the problems restraining the suppliers from meeting the QCD parameters in order to conduct detailed defect analysis, communication to vendor and obtain CAPA for quality issues.

( C)Inventory management for commodity

Ensure optimum level of inventory, and no surplus material.

Ensure 100% PPA (Production Plan Adherence) with target of Zero Idle time on Production line.

Continuous Min-Max monitoring of Raw Material and BOP materials at plant and take necessary actions if shortfalls.

Forecasting for the spare parts which are to be discontinued and maintaining stock at vendor end with the help of History data & FFR (Field Failure Ratio) from QA.

Take necessary steps to reduce lead times and lot size (thereby promoting the culture of procurement as per consumption

Managing strong network with supplier & logistic representative to maintain KANBAN &FIFO.

Maintaining inventory stock as per company norms.

Making supplier flexibility understanding for flexible manufacturing plan on daily basis.

(D) Project management integration for supply chain

Responsible for flawless launch of product.

Presenting project quality update to global leadership for DB,LPB& SOP.

create governance mechanism to ensure that Projects and delivery is on track and any unresolved issues appropriately

Effectively maintain Phase Gate time line for new project SOP through co-ordination with Prog. Mgmt

Phase wise signoff document preparation with prog. Mgmt.-for quality deliverable

Risk assessment for critical supplier sourcing base.

Quality concern resolution tracking & plan for meeting the launch date.

Mitigation plan for unmitigated issue

Strong coordination between Production, Vendor QA & Strategic sourcing.

( E) Cost saving initiative

Development of new vendors(2nd source) keeping in view to optimize the cost involved & Quality

VAVE implementation for cost reduction for new project.(Target Rs/-100 per Assy.)

De-risking of overseas materials by effective localization plan.

Skill strength :

Supplier development, sourcing for NPD, Cost management, Inventory management, product development, Co-ordination with Prog.Mgmt, Warranty, R&D.

Educational strength: B.E in Mechanical Engg.

Quality documentation strength: ISO-TS-16949, SPC, PPAP, APQP, FMEA, MSA, TPM, TQM. Internal Audit, Supplier

Process Strength: Injection molding & Fabrication

Quality tools strength: 7QC, 5 WHY Analysis, Red Bin Analysis 6 HAT Brainstorming, 8D, SPC, SIX SIGMA, MINI TAB.

Quality system strength:5S,KAIZEN,POKA-YOKE,3G,3M,JIT,KANBAN

Instrument knowledge strength: vernier, micrometer, profile Projector, height gauge, redius gauge, sine bar,Lay out inspection.

Other strength: VAVE, professionally well versed with AUTOCAD 2D,MDT 3D Modeling.

Computer strength: MS Words Exel,MS Power PowerPoint,AUTOCAD,MINI TAB

Bonus strength: Can play the role of Quality Trainer (in house) as professional Green Belt holder in SIX SIGMA, assistance to product development dept., Can work as an asst MR

Psychological strength: creativity & responsibility

Training:

Educational Qualification:

Sl No

Exam Passed

year

(a)

Madhyamik (10) -West Bengal State Board

1995

(b)

Higher Secondary (+ 2)- -West Bengal State Board

1997

(c)

Diploma In Mech Engg-State Tech. Board

2000(Regular )

(d)

B.E( Mech Engg)-Institute Of Tech. Education & Research

2003( Regular )

(e)

Executive M.B.A

Appearing (D. Learning)

(f)

Green belt in SIX SIGMA-Benchmark Ltd.

2007

Industrial Training:

Past Experiences details:

(A)Name of industry: MAHINDRA & MAHINDRA. (Nasik plant).

Industry type: Automotive

Post: Dy.Manager(PVT)

Duration: From 06.05.11 to 12.01.12

Project: Mini Xylo, Bolero refresh & Verito .

(B)Name of industry: TATA JOHNSON CONTROLS AUTOMOTIVE LTD. (2yrs in pune & 1 yrs inJamshedpur).

Industry type: Automotive interior component, & complete seating system

Post: Dy.Manager(Supplier development)

Duration: From 06/08/08 to 30/04/11- Two year Eight months

Achievements:

Project completed: Interior cabin component & complete seating system for NANO.

World Truck-(TATA DAEWOO COMMERCIAL VEHICLES LTD)

Interior cabin component & complete seating system (Pneumatic & mechanical suspension system with tilt adj. designed by ISRIGAUSEN,Germany ) – 252 JIT components

For this project TATA JOHNSON have made Joint Venture with ISRINGHUSIN, a Germany based Company for technological support.

Achivement: Cost effectively development of 252 JIT component including 171nos sheet metal stamping tool, 45 nos plastic mould, 51 high tensile special purpose fastener,08 fine blank component & tubular components development

Y1 Truck, MICROBUS (Venture/Pelican)-TATA MOTORS,TOYOTA-800LPrototype

(C)Name of industry: LIFELONG INDIA LTD (DOL supplier of HERO HONDA)

Industry type: Automotive (Sheet metal- auto component)(DOL to HERO HONDA, GM MOTORS (USA)

Post: Astt.Manager (Vendor development)

Duration: From 01/07/05 to 30/07/08- Two year ten months

(D)Name of industry: BRAHMA AUTO INDUSTRIES (P) LTD

Industry type: Automotive ancillary (Sheet metal auto component & Machined component)

Post: Sr. Engineer (Vendor Development)

Duration: From 03/03/03 to 30/06/05-Two year three month

Address:

(A) Permanent : C/O – Alok Km Saha

Vill+po-salboni

DT – Paschim Midnapur.West Bengal

Pin-721147

(B) Present address:

Anirban saha

B/503,Pristine Meadows

Pune Nagar Rd. Kharadi.

Pune-412207

Date of birth : 29/08/1978

National : Indian

Language known : English,Hindi,Bengali

Hobby: Reading Auto Magazine, News paper, Internet surfing.

Date: Anirban saha



Contact this candidate