Post Job Free

Resume

Sign in

Maintenance Plant

Location:
Atlanta, GA
Posted:
June 25, 2016

Contact this candidate

Resume:

Roland Claude Caldwell

**** ******* ** ******* ******* 35650

Phone: 404-***-****

acvffq@r.postjobfree.com

Profile:

In the Electrical Business for over 35 years and in the Food and Beverage Market for the last 13. Troubleshooter, who is not afraid to get out into the fire, Master Electrician, and Control Engineer skilled at managing projects as well as the day to day production issues that arise. Worked with all Rockwell software, AutoCAD, SAP (Maintenance, Inventory and Procurement Modules. At the last 4 plants, started Preventive Maintenance programs and predictive maintenance programs to reduce downtime and get away from the putting out fires. I have a strong belief that most downtime can be reduced by predictive maintenance and stopping issues before they arise. This has required years of training in software and data collection to enable the plants to know for a fact what is causing all the downtime. Assisted with managing budgets (Inventory and Labor), and projects over 2 million dollars.

Education:

BS Electrical Engineering, USC Columbia, SC

Associate Degree Industrial Maintenance Engineering, Midlands Technical College Columbia, SC

(This includes a minor in AutoCAD design)

Associate Degree Data Processing, Rutledge College - Columbia SC

Key Skills:

Office Skills: Office Management Records Management Database Administration spreadsheets/Reports Event Management Calendaring, SQL Server IT Support Executive Support

Plant and PLC Networking (Allen Bradley and Siemens) SAP MS Word, MS Excel, MS PowerPoint

RSLogix 500, Control Logix, PLC 5 and 2, RS Logix3000

All Siemens Software, Wonder ware, Keyence, Adobe Acrobat Pro

All GE Software

AutoCAD all Versions

Multiple Vision Software

Planning Projects

Scheduling Labor

Designing Preventive Maintenance Task

Factory Talk Historian

Maintenance Project management

Front Line Leadership

6 Sigma

NFPA70E Trainer

Laser Officer

Factory Talk Plant Metrix

Capital Project Management

Safety Member

Setting up Lock out Tag out Procedures

Smith X-ray Officer

Factory Talk Process Books

Experience:

3D Automation Columbus, GA Owner November 2013 to Current

Opened Commercial and Automation Company. At first this was doing building repairs, Water, HVAC, Painting, Sprinkler systems then expanded to automation. Clients include Fort Benning, Lee County Schools, Tyson Foods and Excide Batteries. Control work for Parish Electric.

Responsible for managing quoting work, scheduling and budget, Engineering and installing security systems, handling client’s emergency repairs and projects. Networking PLC’s, Fire systems and Security systems. Assisted with setting up and managing security for all systems. Handled all drawings and update of drawings for all clients using AutoCAD currently using cad 2015.

Client Southern Tea in Marietta GA Contracted me to handle their controls troubleshoot PLC problems and manage the ABB Robots and conveyor feed system as well as their blending issues and problems.

Bimbo Bakeries Gastonia, NC Assistant Plant Engineer 2011 to 2013

Trained all employees in all forms of Rockwell software and built a great team of employees. Setup Lockout/tag out procedures for entire plant. Maintained Local server and all PCs at the plant. Assisted Manager with his daily, weekly and monthly reports and budget. I was the trainer for NFPA70E. Managed all drawings and updated all drawings for the plant. Assisted with Safety Training and weekly tool box meetings. Trained in 6 Sigma lean. Frontline Leadership. Assisted with day to day operation of plant. Managed and supervised 11 employees (Multi-craft). Worked with Maintenance Supervisors in making sure their staff was trained and verify electrical work done by their employees. Well trained as Mechanical Supervisor, Waste Water Supervisor, and Electrical Supervisor. Managed and assisted in setup and programming VFDs. Mostly Allen Bradley Power flex and earlier models. Maintained all calibration of sensors and meters in plant. Maintained and generated all plant drawings using AutoCAD. Assisted with all Food Safety issues and assisted with sanitations cleaning on down days. Was in charge of DuPont Stop audits. Handled all electrical and mechanical contractors (bidding and awarding jobs.) Networked all PLcs in order to begin data collection.

Maintained all BENG groups to handle AC Heat Boilers throughout the plant. Maintained all overhead doors electrical and mechanical.

Kraft Foods Granite City, IL Maintenance Supervisor 2009 to 2011

Trained all employees in all forms of Rockwell and Siemens software and built a great team of employees. Setup Lockout/tag out procedures for entire plant. Maintained Local server and all PCs at the plant. Assisted Manager with his daily, weekly and monthly reports and budget. I was the trainer for NFPA70E. Managed all drawings and updated all drawings for the plant. Assisted with Safety Training and weekly tool box meetings. Trained in 6 Sigma lean. Frontline Leadership. Assisted with day to day operation of plant. Managed and supervised 42 employees (Multi-craft). Worked with Maintenance Supervisors in making sure their staff was trained and verify electrical work done by their employees. Well trained as Mechanical Supervisor, Waste Water Supervisor, and Electrical Supervisor. Managed and assisted in setup and programming VFDs. Mostly Allen Bradley Power flex and earlier models and Siemens PLCs. Maintained all calibration of sensors and meters in plant. Maintained and generated all plant drawings using AutoCAD. Assisted with all Food Safety issues and assisted with sanitations cleaning on down days. Created an Andon display in order to show mechanics and operators machine EEE so that everyone was aware of downtime and machine Efficiency to set priorities. Managed all Boiler repairs and maintenance, AC repairs and Maintenance, and Sub Station power repairs and maintenance. Began replacing the Siemens PLC’s to AB in all our fill machines.

Kellogg’s Snacks Division, Columbus, GA Electrical Engineer 1996 to 2009

While working for this company I started out as assistant Chief engineer at the Charlotte Plant for 3 years, Then Transferred to the Columbus plant as Electrical Engineer. Set up maintained and trained employees on the use of SAP maintenance Module. Trained all employees in all forms of Rockwell software and built a great team of employees. Assisted plant in designing, removing Woodman baggers and replacing with Rovema Baggers. Assist and in the design of replacing one oven and extending another oven. Assisted in lowering budget 10% each year. Setup Lockout/tag out procedures for entire plant. Maintained Local server and all PCs at the plant. Assisted Manager with his daily, weekly and monthly reports and budget. Became a trainer for NFPA70E. Worked with maintenance manager to reduce overtime by 10% for the past 2 years. With the training on PLC's to the employees we were able to cut $100,000.00 per year for outside contractors that were brought in to program and troubleshoot equipment. Managed all drawings and updated all drawings for the plant (electrical, Civil). Assisted with Safety Training and weekly tool box meetings. Trained in 6 Sigma lean. Frontline Leadership. Assisted with day to day operation of plant. Managed and supervised 36 employees (Electricians/Mechanics/technicians/waste water/HVAC Techs. / Boiler Mechanics. Worked with Maintenance Supervisors in making sure their staff was trained and verify electrical work done by their employees. Well trained as Mechanical Supervisor, Waste Water Supervisor, and Electrical Supervisor. Managed and assisted in setup and programming VFDs. Mostly Allen Bradley Power flex and earlier models. Maintained all calibration of sensors and meters in plant. Maintained and generated all plant drawings using AutoCAD.

Highlights:

Installed SAP Maintenance program and had all data installed in 4 weeks. All other bakeries were given 3 months to install and set up database and PM task list. When it became our turn the SAP group, said it could not be done at our plant unless we could have all the information entered in within 4 weeks we took the challenge and succeeded. After this I was sent to 4 other plants for help with their go live.

Networked all PLCs in plant so that Data Collection could be brought from the machine eliminating the chance of human error. This also gave the electrical Tec the ability to trouble shoot issues from various locations as well as at the machine.

Devised program to assist all ovens with startup which in months after implementing it appears to have reduced gas usage on start up by 20%.

Co-developed comprehensive, 60-page training manual that enabled faster ramp-up for newly hired Electrical support staff. This included company policies, NFPA70E requirements, and Food Safety issues.

Setup Waste Water Plant and managed program to maintain proper PH and oil levels in our discharge.

Earned excellent marks on performance reviews, with citations for excellence in areas including work volume, accuracy and quality; ability to learn and master new concepts; positive work ethic; and commitment to providing unsurpassed service.

Assisted in bringing downtime from 6% to less than 1.5%.

Completed all projects on time or before time. Without exceeding budget.

Managed all workflow, planning, scheduling and work orders for downtime, projects, shut downs and day to day operations.

Borden Decorative Products Blythewood, SC Maintenance Manager 1991 to 1996

This Company was a high speed paper printing company. I supervised 20 employees which were Electricians /Mechanics/ Waste Water/ and electrical techs. Managed daily work assignments. Assisted with mechanical and electrical repairs and troubleshooting. Maintained budget. Maintained all waste water reports for the city and state. Maintained all Safety records for the plant and did all maintenance safety training. Set up and troubleshooting Siemens Drives and PLCs, managed waste water employees, assisted in all HVAC, Steam, Air Compressor, and boiler issues. Set up maintained and trained employees on the use of Data Stream maintenance Software. Developed tools to assist in speeding up startups and change overs. Maintained all Confined entry permits, as well as all hot work permits. Maintained all plant drawings either by AutoCAD or by drafting. Managed and assisted with HVAC Technicians for AC units and Chillers.

Highlights:

Installed Data Stream software. Creative PM Task list managed and verified completion of pms

Networked all PLCs in plant so that trouble shooting and Data Collection could be brought from the machine eliminating the chance of human error.

Assisted in reducing plant downtime from 16% to 5 %, even after reducing work force by 5 people.

Safety Leader and trainer. In 5 years we were able to drop our lost time accidents to 0 the last 2 years.

Developed program changes that allowed us to change speeds of all drives on machine while running and not have an over feed or underfeed. These lines ran at 200 feet a minute.

Earned excellent marks on performance reviews, with citations for excellence in areas including work volume, accuracy and quality; ability to learn and master new concepts; positive work ethic; and commitment to providing unsurpassed service.

Completed all Projects on time or before time. Without exceeding budget.

Flour Daniels Ridgeway, SC Electrical Foreman 1986 to 1991

This company did all Maintenance for BP Ridgeway Goldmine. This was an above ground mine. Voltages ran from 110VAC to 4160 VAC. Maintained and Scheduled all work for electricians, including day to day operations, Pms and shutdowns. Equipment worked on were Sag Mills, pumps, ball mills plating tanks and baths. Plant building maintenance and DC motors and all GE series 6 PLCs. Safety officer. Motors that ran from hp to 250 hp. Worked 12 hour rotating shifts. Did all new installations and projects. Lead crew for all shutdowns. Did all High Voltage and Low voltage work at site. Maintained and did all AutoCAD of plant while there.

Highlights:

Assisted with setup and management of drug free work place program.

I was requested by BP to work their position of Electrical manager while their manager was out for 3 months for Cancer treatment. I received a letter of thanks from the mine for this tasked and still maintained my normal work load while doing this.

Set up a predictive maintenance program to cut down on machine failures during production which BP then used the same concept at two more of their mines.

Completed all projects on time or before time.

City of Columbia, Utilities and Maintenance Columbia, SC Electrician 1981 to 1986

This company was a city government water and waste water plant pumping stations and lift stations. Voltages ran from 110VAC to 4160 VAC. Maintained and Scheduled all work for electricians and my crew. Items worked on were pumps; gear boxes all water and wastewater process equipment. Building maintenance, DC motors, AC drives simple motor starters. Allen Bradley PLCs. Motors that ran from hp to 300 hp. did all new installations and projects. Did all High Voltage and Low voltage work at site and at remote stations.



Contact this candidate