Curriculum Vitae

Bela Mojzes

(Dated: April ***6)

Education: Plant Constructing Engineer

Area of Expertise: Piping Construction Site Management.

Language ability: German (native), English (very good), Hungarian (basic), French (basic).

Specialization: QAQC, Expediting, Supervision, Construction Supervisor Piping/Mechanical, Welding Expert.

Availability: from June 2016, long term.

Summary: • Mechanical/Piping and Welding Supervisor.

• Project Leader assistance.

• Quality assurance.

• Worked as Mechanical and Piping Supervisor, one year for for the Japanese company IHI, in Trianel Power Plant Lünen, near Dortmund/Germany.

• Used to work as a Mechanical and Piping Supervisor for the company Cegelec GmbH/Merrit International llc Oman, at the International Airport in Duqm, Sultanate of Oman.

• Available for an interview.

Experience Description of the last 10 years

Project description/tasks: I am mechanical engineer and welding specialist (IWS), I have several years of experience in plant construction, Refinery, Power Plant, Chemical Plant.

Planning, Piping Supervision for Prefabrication and Construction Installation at site.

I have experience in piping work, welding, testing, installation, and also for underground pipeline.

I have worked on several Plants in Germany, Refineries, Power Plant, Chemical Plant.

I was more then 10 years working for Company Lurgi Frankfurt, in planning construction design and also for Aventis Frankfurt, Degussa Hanau, BASF.

New building, revamp planning, stock taking P&IDs, supervision the execution and the installation.

For any work execution have specification, for execution, installation.

I am also familiar with the standards DIN EN, ASME, ASTM, ANSI, Pressure Equipment Directive PED 97/23/EG, and HP.

Many years I was worked as a design engineer, plant design, Power Plants, Refineries, Chemical Plants, and then after in year 2006 I was at sites as a construction at site Piping Supervisor, project support, and then I also have carried of the final Inspection on construction sites with customers and TÜV, Third Party Inspection, Pipeline walk down, line-check, and then after prepare and execute the pressure tests with subcontractor.

All Explanation according to ITP plan.

Pre-commissioning with Subcontractor.

Piping systems blow out, or flushing, cleaning, drying.

11/10 – 03/12 Fawley Refinery in Southampton / UK

Project description/tasks: QA/QC Manager.

I had the responsibility to manage that all (Non Destructive Testing) NDT testing should be done during the repair and modification installation in turnaround, acc. specification from ExxonMobil or Foster Wheeler.

And I had compiled also the "As Built" documentation, and handover to ExxonMobil.

In Power Plant Lünen, near Dortmund / Germany

Project description/tasks: I was in charge of the sub-contractors on the construction site Trianel Lünen power plant at company IHI, Japan, as a Pipeline Construction Support, and have supervision the pipeline installation from subcontractor (Voith, and Termoelektro,) troubleshooting, solves problems on site.

We have the specifications DIN EN 13480, PED 97/23 EG, and for the boiler DIN EN 12952.

After completion of installation of the pipelines, and then walk down the pipeline with subcontractor, write punch list, and after solve the punch points, I have make the final inspection with customers and TÜV, Third Party Inspection, only for pipes of Category III.

And only with customers for Category I and 0 (Ingpraxis).

And I have also created the process description for the pressure tests, for example, for auxiliary steam system.

Many works with Line-check, pressure tests, documentation check, assessment, examination by the ITP plan.

My daily work was been with P&ID's, isometrics drawings, support drawings, piping lists, pipe classes.

We have there the piping materials, used.

P91, P92, WB36, 10CrMo9-10, 13CrMo4-5, and the stainless steels 1.4404, 1.4571, 1.4541, 1.4301.

Then I have checked for any prefabricated pipingspools whether the "Final Assessment Report" is available because the pipingspools were away prefabricated, with final acceptance.

04/07 – 07/09 OMV Refinery in Burghausen / Germany

Project description/tasks: Activities at OMV Refinery in Burghausen.

Right from the beginning I have supported in the pipeline engineering for the upcoming SHUT DOWN October 2007.

Execution of the integration points that could be made before the SHUT DOWN in the old system and parallel processing of the HAZOP points.

There were some HASOP points.

HASOP points were various modifications to piping systems, in different parts of the plant, pipe bridges.

The flow separation, on a HASOP point:

The original documents, Drawings, isometrics, P & ID 's procured as copies may be obtained on-site measurements, and created the design.

New isometrics drawings, then the bill of material for the appropriate pipe class.

Then I caught up with offers for the mounted version of 2 subcontractors.

The offer was only the prefabrication and installation version, with supports, and without material.

I have in my OMV Computer the SAP for material storage, so I could pull out the materials.

And if something was not present in the OMV material stock, I ordered through the purchase by OMV order specifications.

For scaffolding, insulation work, painting, it was charged extra.

I have created the design, isometrics drawings, and it had to be approved: from process engineer, from the quality assurance and from the operating department.

Then the order for execution to the respective company was awarded.

The installation execution I have monitored.

In Plauen by Company Tubetech, there was fabricated 4 air cooler made of Duplex (1.4462) it was at this time for the OMV manufactured.

On request of the project with me, I have monitored the expediting, production progress and the quality by the company Tubetech.

So I am often driven to Plauen to Company Tubetech, each for a few days and written reports on the status, progress, quality, problems until final inspection, pressure testing, dimensional inspection and the delivery to Burghausen.

In the meantime, in Burghausen, I 've continued HAZOP edited points.

After SHUT DOWN, from November 2007, I have strengthened supported with the punch lists, after the new TMC project, metathesis plant was merged with the old system, there were many modification sites in the old system, where the execution with OMV specifications disagreed were, or not completed, or failed.

I have checked all points acc. OMV specifications, I also ascended each column a few times and added the faults to as Punch point.

The Punch lists were forwarded to fix by the subcontractor.

In the feedback as corrected, I have again to examined this passage.

I have checked the on-site fabrication acc. OMV specification, and also whether all the non-destructive tests have been made to date and the transport control.

And write weekly reports to the Project Manager, with tolls Photographs.

2009 - 2010 In Thailand

Project description/tasks: Expediting and Quality Supervisor.

I worked two time in Thailand.

The first time 1997 by EGAT in Mae-Moh in 4 block Power Plant as Piping Engineer, for flue gas desulphurization Absorber Plants.

And the second time 2009-2010 in Prachinburi by Company Thai Herrick.

I was as Expeditor and Quality Supervisor, working for EnBW/Stuttgart in the fabrication of steel structures for Power Plant in Karlsruhe, according to specifications of Alstom, and ITP plan.

The steel components were then shipped every month 1-2 times in 15-20 containers to Germany.

My responsibilities:

Confirm the Certificates of Material are acc. to purchase order.

Check the welder qualification tests.

Ensure the filler metals are acc. to the welding plan.

Check the qualified person for stamp transfer.

Check cold straightening, straightening by heat input.

Inspect the preheating and heat treatment on steel structure by welding.

Check the qualification of Non Destructive Testing (NDT) personnel.

Verify the Scope of Inspection of Non Destructive Testing (NDT) on welds.

acc. to the Inspection and Test Plan.

Inspection the Dimensional Check from Fabricator, with testing the steel structure

connections on rectangularity and evenness.

Check of Corrosion Protection acc. to ordering specification.

All checks and controls acc. Inspection and Test Plan (ITP).

Control Time Scheduling to meet the Project deadlines.

And write weekly reports to the Quality Manager Mr. Dr. Bareiss EnBW/Stuttgart Germany, with tolls Photographs.

In Oman

Project description/tasks: I was in Oman as Mechanical and Piping Supervisor at International Airport Construction, Tank Fuel Farm area in Duqm.

I have the responsibility for monitoring the pipeline installation, of subcontractors.

And I had also to supervise the Installation the underground pipeline for the Firefighting line with 12 Hydrant and the Foam Pipeline on the 3 Kerosin Tanks, and in the Bowser area.

All Subcontractors was from India, Pakistan, Bangladesh.

And the Client was the Company Hanjin from South Korea.

In Belgium

Project description/tasks: I was a Piping and Welding Supervisor in BASF Antwerpen at shut down, one of a section in the plant, OSBL for the company Air Liquide France.

Subcontractor was company SIMI from Portugal.

I was responsible for the Inspection of all prefabricated piping spools from Portugal, and for monitoring all assembly and welding pipe spools with all connection to the Tie-in points, then control all performed NDT Tests.

Then the final acceptance, line check and Pressure Tests Inspection with APRAGAS Notified Body.



Contact this candidate