Post Job Free

Resume

Sign in

Project Manager High School

Location:
Belleville, MI, 48111
Salary:
55k per year
Posted:
June 24, 2016

Contact this candidate

Resume:

DARIUS A.HORTON

[**** Bay Hill Court] [Romulus MI, 48174] [734-***-****] [acvey4@r.postjobfree.com

Web] [darius-horton.squarespace.com, Hortonsstudio.wix.com/darius, Tustudio.wix.com/abfordparkdetroit] OBJECTIVE

[To promote innovative design solutions to project teams and accentually increase revenue for architectural firms.] EDUCATION

[Master of Architecture, Design and Practice] [July 2014]

[Lawrence Tech University, Southfield MI]

[Bachelor of Science in Architecture] [Dec 2011]

[Lawrence Tech University, Southfield MI]

• {Related coursework: Model Building, Site Analysis, Programmatic planning, Rendering, Hand Sketching, Critical Practice, Interdisciplinary Approach, Team building, Building Assessment.

[Associates in Applied Science, Occupational Studies] [Dec 2006]

[Washtenaw Community College, Ann Arbor, MI]

[Certificate Architectural Technology] [Dec 2001]

[Washtenaw Community College, Ann Arbor, MI]

TECHNICAL SKILLS

AUTOCAD/REVIT/3DSMAX/RHINO/GRASSHOPPER/ARTLANTIS/PHOTOSHOP/ILLUSTRATOR/INDESIGN/SKETCHUP SKILLS & ABILITIES

[Management]

• Maintained construction documents for various projects while working for Crutcher Studio to include office space renovations and additions, new and existing home renovations and additions thru use of Auto Cad and Revit.

• Assisted in the development of the 3rd district Friend of the Court in Wayne County at the Penobscot Building. Provided a court tenant space program of approx. 135,000sqft that included 1st floor –Sheriffs Department, 2nd floor-Sheriffs Gym, 9th Floor IT, 10th and 11th floor for court personnel and 12th floor for staff.

[Leadership]

• While deployed to Rota, Spain I expertly led four personnel in the construction and placement of four concrete headwalls and sidewalks. The projects totaled 650 cu yds. with zero defects or safety mishaps for a hospital.

• Team member for the renovation of five school projects in An Najaf, Iraq. Projects consisted of removal and cleanup of debris and painting over 9,500 square meters of interior and exterior walls.

• Assigned as crewmember of the 2 60-meter triple and 40-meter double Mabey Johnson bridges, which reopened the main supply and logistic routes for the 1st Marine Division in support of Operation Iraqi Freedom.

• Crew Member, Constructed Refrigeration Stand. Prefabricated and installed over 8000 feet of reinforcing steel bars and assisted in placement of 300 cubic meter of concrete pad.

• Constructed Retaining Wall Project, Okinawa Japan, 19-meter concrete V-ditch, topsoil application, and job site clean -up.

[Communication]

• Managed Architectural projects for Crutcher Studio thru the use of Skype, Drop box, Email. Various conference calls were held to coordinate projects.

• Managed 3rd District Court Project for Triple Properties Detroit thru weekly conference meetings, coordination with Venders, Electricians, Contractors, court staff, management and Project Architects

• Worked in collaboration with project team members at Roush Industries to complete 500,000 sqft automotive assembly plant in Allen Park MI.

DARIUS A.HORTON

[6018 Bay Hill Court] [Romulus MI, 48174] [734-***-****] [acvey4@r.postjobfree.com Web] [darius-horton.squarespace.com, Hortonsstudio.wix.com/darius, Tustudio.wix.com/abfordparkdetroit] EXPERIENCE

[Shaw Electric, Southfield, MI] [Feb 2015 to May 2016]

[BIM Coordinator/Manager]

• Managed and coordinated electrical drawings and 3d models for Michigan State University FRIB project for rare Isotope study using Revit and Navisworks. Tasks included electrical coordination between Mechanical, Electrical and Architectural collisions while producing description and dimension conduit drawings.

[HLF Furniture, Belleville MI] [May 2015 to Current]

[Cad/Project Manager]

• Daily tasks included scoping architecture projects from firms and businesses for custom millwork and creating shop-drawing details for fabrication using 3d Auto Cad. Also interfaced with various clients and managed numerous accounts to order entry, quotes and managing purchase orders.

[Roush Industries, Livonia MI] [Oct 2014 to Feb 2015]

[Cad Technician]

• [Provided electrical, lighting and mechanical layouts for construction documents, bids and permitting /updated Facman facility drawings floor plans, elevations and section drawings for new and existing automotive assembly plants.

• Projects included a 400,000 s.f. shell building retrofit for Roush building 9 Instrumentation Garage Services and office space build out in Allen Park, Michigan. Roush building 50 office space build out in Livonia MI and Roush building 11 engine testing and HR department.

[Triple Properties Detroit} [Oct 2013 to Oct 2014]

[Architectural Designer/Project Manager]

• [Assisted in space programming and development of the 3rd district court, Penobscot Building Detroit, MI/provided furniture specs for court/helped establish IT Security Plan for court/established build out quantities for court/established personnel requirements for court/provided electrical and lighting support/assisted with construction documentation for court.

[Crutcher Studio, Farmington MI} [Apr 2011 to Nov 2012]

[Intern Architect]

• [Helped design new and existing home renovations and additions/provided site plan analysis, schematic design, field measurements, construction docs and design development/partnered with John Tagle and Associates (JTAI) to complete a quarter scale model for the First Baptist Church in Royal Oak MI.

[B.J. Burnham and Associates, Birmingham MI] [Summer 2010]

[Cad drafter]

• [Kitchen, bath and home addition and renovation project.

[Lawrence Tech University, Southfield MI] [Spring 2010]

[Teaching Assistant]

• [In partnership with University High School, I helped teach a web design class for University High School students. Skills used in this class involve Photoshop, Illustrator, and HTML and CSS standards.

[United States Navy Seabees, Port Hueneme CA] [May 2001 to Feb 2006]

[Builder 3rd class]

AWARDS AND RECOGITIONS

[Shanghai International Art and Science Exhibition] [Spring 2011]

• Design project displayed in exhibit. The LTU and SUES combined exhibit. FREELANCE WORK

DARIUS A.HORTON

[6018 Bay Hill Court] [Romulus MI, 48174] [734-***-****] [acvey4@r.postjobfree.com Web] [darius-horton.squarespace.com, Hortonsstudio.wix.com/darius, Tustudio.wix.com/abfordparkdetroit]

[Horton's Architectural Design Studio]

Copeland Residence

• New home design, Maumee, OH

Surgery Center

• Conceptual Renderings, Oak Park Michigan



Contact this candidate