Post Job Free

Resume

Sign in

Project Manager

Location:
Laurel Hill, NC, 28351
Salary:
45.00 -65.00
Posted:
June 24, 2016

Contact this candidate

Resume:

Resume

Objective- Management position within an organization that would be challenging and offer opportunities for advancement

Kenneth Ray Meshaw

**** ******* **.

Wallace, NC 28466

910-***-**** Cell

910-***-**** Spouse Cell

E-Mail acvexo@r.postjobfree.com

Education - 12th Grade

College - Brunswick Technical College, Welding and blueprint reading

Excel, Money Smart, Indus, Esoms, Passport and Pimms)

Employers: Day & Zimmerman NPS

D Z Atlantic

National Thermal Insulation

Transco Products Inc.

Fluor Daniels

Becon Construction

TIC Construction

Scope

Power Plant Maintance

Ogden Cisco

Shaw Group

BNI (Bartlett)

CBI (Chicago Bridge and Iron)

Suntech

Grus Construction

Mountain State Foam Insulation

BHI (Bartlett)

Lutech

Previous Responsibilities Civil/Insulation/painter Supervisor / Superintendent

Engineering of the safe shutdown system (darmatt)

Design of safe shutdown system

Training of craftsmen (union and non-union)

QC

As Built drawings

Re-evaluated project bids

Field design engineer

Projects Oversite

Date of Birth - August 03, 1954

Additional certification and skills - Scaffold building, Insulation, Welding, Sheet metal, and numerous maintenance skills.

Volunteer and community services - Actively involved in Wallace First Assembly of God, member of Pender Parent Teachers Association, organizer of the annual Youth Program and supporter of the Burgaw youth softball league.

Work history - I have over 20 years of hands on experience in insulation (fiberglass, calsil, soft pads, mirror reflective insulation, sheet metal, duct work, etc.). I have worked 06 years for Transco Products Inc. in positions such as Supervisor, Coordinator, Project Manager, Superintendent, General Forman, and Company Representative for the installation of Mirror

Reflective Insulation on the Reactor heads, and on the Steam Generators at Nuclear Power Plants, also 15 years with Day and Zimmerman NPS at D.C. Cook Nuclear Station, during the turbine reconstruction, as well as Point Beach Nuclear station supporting the Power Uprate Project and supporting the outages as required and superintendent for Shaw Stone and Webster, BHI, and Bartlett supporting outages. I also have experience working in the gas and oil industry.

Insulation Supervisor, CBI/ (Chicago bridge and iron) DC Cook, Bridgman MI Feb.29th thru April 22nd 2016 Lead Insulator Supervisor 9Night Shift) It was my responsibility to line out work for the shift, open & close work pkgs., attend pre-job briefs attend daily update meetings, Safety meetings, and verify field work was being performed on correct components and train. Materials used for this project was Mirror Reflective Insulation, Fiberglass, Cal-Sil and Armiflex Rubber Insulation. We also installed metal gores, reducers, equal, and unequal tees, and end caps. We removed Asbestos Insulation also.(Union)

LIR (Lead Instalation Represenitive) Lutech/ CBI (Chicago Bridge and Iron) Three Mile Island, Middletown PA. Oct.8th 2015 thru Nov.15th 2015. Oversite for Pressurizer Project, Removal of Nucon pads and reinstall of Mirror Reflective Insulation due to the fibrous material concerns and sumps in containment. My tasks included open and close work orders, ensure scaffolds were built and lifts were made as scheduled. I also reported to the plant manager progress of project for his OCC (Outage Control Center) Updates.

Project was recognized by OCC Manager for completing ahead of Schedule with no PCEs or First Aids. (Union)

Lead Insulator- BHI (Bartlett) H.B. Robinson Nuclear Power, Hartsville S.C. May 18th 2015 thru Aug 27th 2015. Worked on a project removing and reinstalling Fig. and Cal-sil insulation for a heat tracing upgrade. (Non-Union)

Supervisor/ Insulation, Painters, and Divers- Suntech / BHI (Bartlett) Monticello Nuclear Plant, Monticello MN. Mar.10th 2015 thru May 6th 2015.I covered the insulation, painter, and diver crafts. Responsibilities were to distribute, open and close work assignments. I also attended and reported progress at update meetings as well as attending safety meetings. I was an active participant at the D15 meetings at the start of shift as well as the pre-job briefs before starting tasks. (Union)

Insulator- Wolf Creek Nuclear Station, Bridgeman KS. Feb.16th 2015 thru March 9th 2015 Installed and removed conventional insulation and worked in the shop laying out metal for upcoming task. (Non-Union)

Insulator- Mountain State Foam, Bridgeport WV, Oct.10th thru Feb.15 2015.I worked at gas and oil plants insulating small bore piping with fiberglass, foam glass and tank wrap. (Non Union)

Insulator- Grus construction, Kingwood W.V. Oct.10th 2014 thru Oct .15th 2014, Insulated cooper tubing with fiberglass using PVC fittings as needed. (Non- Union)

Supervisor/ Superintendent -Fitzpatrick Nuclear Station, CBI (Chicago Bridge and Iron) Oswego, New York, August 11th thru September 13th 2014.I supervised 14 employees in the removal and insulation of various types of insulation (Soft pad insulation, Fiberglass insulation, tank and pipe wrap, and mirror reflective insulation. Pre-fab work for installation in the field was common practice. I also attended and participated in Safety meetings and Pre-job briefs. I carried a high standard for safety as it is my number one core value. (Union)

Supervisor, Insulation/paint and penetrations, H.B. Robinson Nuclear Power Plant, BNI(Bartlett) Hartsville SC. Mar.14th/2014 – April 9th /2014 I supervised the removal, installation and modification of Mirror Reflective insulation on the Alpha, and Bravo Generators. My responsibilities also included ordering materials, attending and participating in safety meetings, report status on projects, and make sure a high safety standard is acquired. I also worked with the planning department preparing work packages. (Non Union)

Lead Insulator, Calvert Cliffs Nuclear Power Plant, Day and Zimmerman, Calvert Cliffs, Maryland, Feb.18t h 2014 -Mar.09th 2014. Walked down work orders, performed pre job briefs, attended safety meetings, ordered materials and reported work progress to immediate supervisor. (Non Union)

Superintendent, Insulation/ paint/and fire protection, Fitzpatrick Nuclear Station, Shaw Stone and Webster, Oswego N.Y. Sept. 10th 2012 – Nov, 18th 2012. I walked down and put together work packages, estimates verified work completion, closed out work packages, and reported progress to management team. I also attended safety meetings and carried a high standard for Safety and a safe work environment (Union).

Superintendent, Insulation/ Paint /and Welding, Indian Point Nuclear Station, Shaw Stone and Webster, Buchanan N.Y., Feb 20th 2012- April. 12th 2012 I supervised, insulators, painters and welders during the refueling outage and remained during start-up. My duties included putting together and approving work packages and report progress to management (war room). I also attended all safety meeting and I carry a high standard for a safe work environment (Union)

Insulation Supervisor, Point Beach Nuclear Station, Day and Zimmerman NPS, Two Rivers Wisconsin, Sept. 15th 2009-Nov.15th 2011, I supervised the Unit 1 and Unit 2 Extended Power Uprate Project, Feed water heater insulation replacement (cal-sil, Fiberglass and soft pads), also the Safe Shutdown System Project, Promatec Fire Wrap System) and Penetrations (Dow Corning 7 and 20 0z. tube kits as well as the Dow Corning Foam Machine for large penetrations). I was required to attend schedule meetings as well as update meetings for the Team room/ war room. Other responsibilities were estimating, inventory, and ordering material. (Union)

Insulation Supervisor, Civil, D.C. Cook Nuclear station, Day & Zimmerman NPS, Bridgman MI, Oct 17th 2008 – April 27th 2009, I supervised labors involved in tasks such as cleaning the facilities and also the cleanup of oil and also asbestos after a major turbine reconstruction project at the DC Cook Nuclear Station, also estimated Material, Manpower and Time for re-insulation of the project. Responsibilities included participation in Safety Meetings, Daily Turnover Reports to Superintendents and plant managers, also ordered materials for project on a daily basis or as required. I also assisted with the planning and scheduling of projects of the Turbine Replacement Activities. (Union)

Insulator, Forman, TIC Construction Los Angeles California, May 5th 2008-May 9th 2008 We insulated precipitator with mineral wool and sheet metal. (Non-Union)

Insulator, Maintaince DZ Atlantic 1818 Market Street, 8th floor Philadelphia, Pa 19103, Sept. 11th 2007 – April 19th 2008. Palo Verde Nuclear Station. Performed misc. modifications to Mirror Reflective insulation along with installation of conventional insulation. (non-union)

Insulation lead, SGRP National Thermal Insulation, March 19, 2007 - May 5, 2007. Comanche Peak, Glen Rose Texas. Modified Mirror Reflective insulation on Steam Generators. I had a crew of 5 craftsmen whom were responsible for field modifications(Non-Union)

Site/Project Manager, SGR Modification, Transco Products Inc. Chicago III. Oct. 7, 2006 - Dec. 15, 2006. Oconee Nuclear Station - Seneca SC Modifications on the mirror reflective insulation on Alpha Steam Generator for installation of seismic instrumentation. My responsibilities on this project was, timesheets, order materials and tools, draw and submit ECRs (equipment change request forms)

To the proper engineers along with updates to Duke power engineers and management. Requirements also included QC and as built drawings. (Non –Union)

General Forman, Control room habibility, HVAC National Thermal Insulation (Transco Products Inc.) Chicago III. May 10, 2006 - Sept. 8, 2006. Honeywell Chemical Plant - Baton Rouge La. Project: Control room habibility and safe shutdown system. My responsibilities included ordering Materials and implementation of proper procedures for installation of materials and equipment. I was also in charge of craftsman and daily job scope. Reevaluated the job bid and term of project to reflect completion goals of the project Non-Union)

Insulator, Maintaince, Atlantic Group. Norfolk Va. March 1, 2006 -March 25, 2006. Progress Energy Nuclear Station (Brunswick Plant) Southport N.C. Removed and replaced, wet fabs, pads, and fiberglass insulation. (non-union)

Field Engineer/Coordinator, Safe Shutdown system,HVAC Transco Products Inc. Chicago III. Sept 29, 2005 - Nov. 18, 2005. Davis-Bessie Nuclear Power Station - Port Clinton Ohio Project: Coordinated and completed the Control Room Project for safe shutdown. I was responsible for reviewing procedures to insure a safe environment as work was being performed in the control room around sensitive equipment

And documentation to QC. (Union craftsmen) Project was completed on time and without incident. I also had to design the project of sealing the HVAC system for safe shutdown.

Site Manager/Training, Safe Shutdown System, HVAC Transco Products Inc. Chicago III Sept. 16, 2005 - Sept 28, 2005. Callaway Nuclear Power Station - Fulton Mo. Project: Trained Employees to install Darmatt insulation on the safe shutdown systems of the plant. My responsibilities were to train craftsmen to install materials per procedures and advise QC as to expectations as per TPI Inc. (Union Craftsmen) I was responsible for design engineering and implantation of procedures. I also had to report to the assistant manager daily on status of project.

Project Coordinator, Safe Shutdown, HVAC Transco Products Inc. Chicago III. Aug. 8, 2005 - Sept. 15, 2005. Davis-Bessie Nuclear Power Station - Port Clinton Ohio Project: Coordinated the Control Room Hability Project, sealing the penetrations in the control room and mechanical equipment room to insure safe shutdown of the plant. My responsibilities were to review procedures and insure safety in the control room during sealing of penetrations. Also documentation of penetrations and seals to QC. (Union Craftsmen) implemented safe shutdown to the HVAC system in the mechanical room. I reported progress to the plant engineer daily. Union Craftsmen

Field Engineer/ Site Manager, Safe Shutdown, HVAC Transco Products Inc. Chicago III. Oct. 5, 2004 - Dec. 19, 2004. Callaway Nuclear Station. - Fulton Mo. Project: Installed Darmatt on safe shutdown system for control room. I was in charge of 9 craftsmen, safety meetings, timesheets, procedures, and ECRs to TPI Inc. (Union Craftsmen) I also accepted responsibility for drawing the asbuilts and training craft to install material as per procedure.

Site Manager, Safe Shutdown, Transco Products Inc. Chicago III. Sept. 13, 2004 - Oct. 3, 2004. Kewaunee Nuclear Station, Kewaunee WI. Project: Control room habilility, sealing of duct work and penetrations for safe shut down of control room in case of emergency. I was in charge of procedures, materials, timesheets and ECRs to engineers. (Union Craftsmen)

Field Engineer/ Company Represenitive, Safe Shutdown HVAC Transco Products Inc. Chicago III. May 20, 2004 - Oct. 2, 2004. Indian Point Nuclear Station, Buchanan NY. Project: Seal air duct and all penetrations in control room and mechanical room for safe shutdown of plant. (Union craftsman)

Field Engineer/ Site Manager, HVAC Transco Products Inc. Chicago III Oct, 21, 2003 - May 19, 2004. Plant Hatch Nuclear Station, Baxley Ga. Project: Seal all duct work and air handlers in conjunction with control room to insure safely of control room personnel to perform safe shutdown of plant. (Union-Craftsman)

Field Reprehensive, HVAC Transco Products Ins. Chicago III... July 12, 2003 - Oct. 18, 2003. Wolf Creek Nuclear Station Burlington KS. Project: Fire protection- Installed Darmatt board to insure a safe shutdown system to the control room.

Supervisor/Company Repersenitive, Head Replacement Transco Products Inc. Chicago III. March 1, 2003 - April 28, 2003. Surry Nuclear Station, Surry VA. Project: Replace and modify mirror insulation on reactor head etc.

Company Repersenitive /Supervisor, Head Replacement Transco Products Ins. Chicago III. Feb. 6, 2003 - Feb. 28, 2003. North Anna Nuclear Station, North Anna VA Project: install and modify mirror reflective INS.

Supervisor, Maintaince,Atlantic Group, Duke Power Company, Catawba nuclear Station, Rock Hill SC Jan. 3, 2003 - Jan 30, 2003.

Journeyman Insulator, Maintaince, Atlantic Group, H.B. Robinson Hartsville, SC. Oct. 4, 2002- Nov. 23, 2002. Install fiberglass insulation of pipes, boilers, and vessels in accordance with standard operation procedure, Install soft pads on mechanical equipment. (I.e. pumps). Install mirror insulation in containment environments.

Journeyman Insulator, Maintance Fluor Global, South Carolina Electric & Gas Virgil C. Summer Nuclear Station. Columbia SC. April 1, 2002 - May 27, 2002, Install fiberglass insulation on pipes, boilers, and vessels in accordance with standard operation procedure, install soft pads on mechanical equipment (I.e. pumps). Install mirror insulation in containment environments.

Journeyman Insulator, Maintance, Atlantic Group, progress Energy, Brunswick, North Carolina Jan10, 2002 - March 26, 2002. Install soft pads on mechanical equipment. (I.e. pumps). Install mirror insulation in containment environments.



Contact this candidate