Post Job Free

Resume

Sign in

RCDD/PM

Location:
Manchester, NH
Posted:
June 23, 2016

Contact this candidate

Resume:

CHRISTOPHER MAGAY, RCDD

** ******* **** *******, ** 03110 C: 603-***-**** acvd1q@r.postjobfree.com

PROFILE: REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNER Outstanding track record of innovative project management, technical controls, continuous improvement initiatives, analytical problem solving, and fiber optic program creation across the United States. SKILLS & CAPABILITIES INCLUDE:

w Accomplished RCDD and Project Manager recognized for negotiating multimillion dollar contracts with external clients for fiber projects all over the country.

w 20+ year background in the United States National Guard, completing design, engineering, and installation of C4ISR systems in high stress warzones and environments.

w Strong technical and practical experience designing, costing, and constructing telecommunications ISP/OSP infrastructure; 19- years commercial design, quoting, and installation. w Successfully resolved emergency client issues and physical network outages. w Effective collaborator and technical leader to ensure deliverables meet client specifications. w Develop innovative improvements to meet all performance, reliability, cost, and regulatory requirements. w Deep experience with quoting, proposing, planning, designing layouts, developing, overseeing, and completing large scale fiber optic projects, budgets ranging from $500K to $3M. w Technical skills include MapInfo, OSP Insight, Visio, UDA Construction Suite and Microsoft Office Suite. w Officer Engineer of the Year 2010 USAF ANG; Security Clearance – Secret AREAS OF EXPERTISE INCLUDE:

w Outsourced Contracts w Fiber Optic Planning & Design w Cell Tower Connections w Technical Leadership w Technical Documentation w Data Center Build w Project Management w Information Transport Systems w Process Optimization w Strategic Planning & Execution w Infrastructure w Fiber Optic Cable Conduit PROFESSIONAL EXPERIENCE

NET TECHNOLOGIES INC – Amesbury, MA

Operations Manager 2015

Coordinated a team of 6-7 Field Technicians, deploying lighting systems, access control, security cameras, bi-directional amplifiers

(BDAs), and remote bridge control signage. Collaborated with IT to service partner company voice, data, and IT needs such as cabling for new computers/phones, daily PC support, IP phone system support, and software help. Coordinated project submissions and jobsite work. w Managed ~$300K-$600K projects over 4 months, placing MBTA-networked IP security cameras connected by fiber optics, card key access to specified rooms/areas, upgrade electrical and network facilities to accommodate new cameras and card key access devices.

w Oversaw a $400K project, completed after hours, over a 6-week time period, constructing Amtrak – smart LED replacement lights on tracks and passenger platforms, coordinating with Amtrak electricians and engineers for track access. w Implemented a $70K pre-post construction and building commissioning on the Stonehill College bi-directional “BDA” system used to amplify send/receive emergency services radio (fire/rescue) from inside the building. w Documented operational steps/flowchart for all required company process, including pre-bid and pre-sale until the post project customer satisfaction survey.

ü Completed a whiteboard flow chart, reviewed with all company stakeholders for sign off and entered electronically into UDA Construction Suite software, creating an operational process flow with identified tasks/departments. w Prepared and coordinated Hanscom AFB elementary school submissions in partnership with Griffin Electric, and sent to Army Corps of Engineers for clock and paging system.

w Prepared and coordinated project submissions for Mountview Elementary Holden MA clock and paging system and emergency notification signage system, both systems involving information transport systems (ITS). ü Required extensive experience with low voltage cabling and RCDD project management coordination with Griffin Electric, placing cable and back boxes onsite during various stages including pre-construction and construction. GRANITE COMMUNICATIONS – Quincy, MA

Contract Fiber Engineer 2015

Christopher Magay, RCDD C: 603-***-**** Page 2 of 3 Designed and redesigned, and quoted 20+ fiber projects ranging from $150K to $450K used to deliver Wi-Fi, broadband, security video, and network services for a national mall owner - Macerich. w Designed and quoted fiber deployment for ~30 malls, with an additional 15 requotes due to changes. w Managed budgets ranging from $175K to $450K, with a median budget of $275K. w Served as the Lead Design Engineer, creating the mall solutions for fiber optic deployment dependent upon existing legacy systems, mall size, and actual layout.

w Completed all installations between 4 to 6 weeks after sell date. INNO4 – Boston, MA

Contract Project Manager 2014-2015

Managed a team of both union and non-union personnel consisting of 5-7 electricians, a budget of $300K, all project timelines, and work for a 330K Sqft facility, fit with access control and cameras at an Amazon sortation center. w Delivered 2 weekly site reports regarding Sully Mac and InfoWires construction and installation progress. w Coordinated material delivery to and from the site, managed pictures, and the cable pathway needed. w Managed all construction coordination in collaboration with the General Contractor and subcontractors, overseeing all material and labor change orders, and meeting all owner inspection dates. GS SECURITY INC – Tewksbury, MA

Project Manager 2013-2014

Scheduled manpower and activities for a wide range of projects, budgeted between $3K and $600K, including the Bose NE campus conversion, Lindt & Sprungli Chocolatiers manufacturing site, an addition and new construction for the Dana Farber building, new mall at Chestnut Hill Square, and new Keurig building headquarters. w Key part of the team responsible for growing the company by 50% in 1 year. w Coordinated 18-28 low-voltage electricians and occasionally 2-4 electrical subcontractors on numerous sites for security system installations.

w Frequently coordinated construction with the site end user and General Contractor. w Ensured access to each site, all parts/cable/equipment were available, and technicians had maps or installation information for site. w Gathered site information such as camera placement, layout for cable placement, available power supply, existing legacy equipment, and how to schedule work with minimal interruption. w Developed and standardized systems to track personnel and site progress, monitor schedules, and evaluate completion. UNITED STATES NATIONAL GUARD – Massachusetts/Qatar/Iraq/Germany/Korea Captain Through 2011

Retired from the United States National Guard at a Captain rank. Designed, engineered, and installed complete C4ISR systems. Responsible for troop movements dovetailing material and equipment transport for global deployment. Completed Academy of Military Science and received commission, appointed Second Lieutenant, engineering section, 212 EIS. Deployed overseas for CENTCOM management team overseeing all theater telecom infrastructure activities performed by organic engineering installation resources. w While stationed in Qatar as part of E+I management group, forward deployed to high conflict areas Baghdad, Ballad, and Kirkuk to support entire area of responsibility “AOR” during Desert Shield/Desert Storm, responsible for airfield systems, phone, radio, and fiber optic permanent communications.

w Sought out and coordinated efforts with parallel Army communications battalions combining equipment and manpower to achieve mutual coalition communication goals.

w Responsible to initiate purchase requisitions for materials needed in projects throughout AOR, inventoried and dispersed materiel in storage from Qatar, and coordinated/attended civil engineering meetings to represent E+I interest and needs during base planning. w Assisted with resolution of fiber damage for Kirkuk radar equipment responsible for Northern Iraq air picture, determined test equipment and materials needed for next day delivery by Blackhawk helicopter for damage resolution, and returned to service Northern Watch radar picture.

SEGTEL INC – Lebanon, NH

Fiber Engineer Project Manager 2010-2013

Managed new construction for 450+ sheath miles of fiber optics, with a budget of $3M+. Designed cable path/entrances and fiber connectivity between dozens of wire centers and 250+ wireless clientele sites statewide. Supported license, permitting, and negotiation process in order to obtain civil, railroad, river, and highway crossing permits; gathered information and submitted paperwork to government agencies to perform work on the crossings. Provided fiber optic connectivity to extend networks to new locations and migrate from costly ILEC connections at existing locations with upgraded services while realizing long term savings. Christopher Magay, RCDD C: 603-***-**** Page 3 of 3 w Focused on putting up new outside plant “OSP” cable on 22,000 telephone poles, cabling into over 30 Fairpont central offices, connecting two anchor tenants (ZAYO and Direct TV), building lateral connections to and connecting 225 cell towers to the central offices, and eventually wireless carrier hubs (Verizon Wireless and US Cellular). w Identified, bid, and won a participating contract on the OSHEAN Beacon 2.0 Broadband Initiative project as an owner’s agent. ü Provided engineering, site quality inspection, and reviewed fiber optic test results for recently installed fiber. ü Designed 40+ fiber rings, 350 miles of new cable placement, 17K+ fiber miles, and 150+ customer (college) locations. ü Coordinated splicing activities, designed fiber paths with COX Communications, and reviewed/accepted test results from new fiber optic links.

LIGHTOWER – Boxboro, MA

Fiber Engineer Project Manager 2006-2010

Provided technical solutions and pricing for fiber optic infrastructure. Developed and implemented construction details and costing for projects ranging from $5K to $500K. Gathered site information to determine a path from existing network fiber cables via phone poles and conduit existing infrastructure. Collected construction quotes from the contractor and proposed new builds for fiber cable to customer site. w Constructed conduit and phone poles to support new fiber cable for dark and lit connections for NSTAR Communications, XO Communications, UMass Network Systems, and OSHEAN. w Quoted projects up to $4M in cost, actively supporting the sales process and turnkey installations. ü Obtained pole/conduit attachment rights, municipal agreements, rights of way, grants of location, and all phases of local and state construction permitting via paperwork submissions. w Managed teams of contractors across multiple projects, including outside plant cable construction contractors. MOLEX PREMISE NETWORKS – Hudson, NH

Corporate Trainer Technical Resource 2003-2004

Prepared and delivered “Train the Trainer” training for national manufacturer and direct representatives. Wrote and proofread copper and fiber optic copy such as flyers, pamphlets, magazine articles, tradeshow handouts, and training/sales materials. w Served as the Technical Representative for the corporate office at tradeshows, sales presentations, and training seminars. w Provided onsite support for national copper and fiber optic customers, including resolution of testing and performance issues at the end-user site pertaining to incompatible materials, out of specification test equipment, damaged installation, poor installation, and miscellaneous unspecified reasons.

VIABLE SOLUTIONS CORPORATION – Milford, NH

Owner 2002-2003

HITACHI CABLE MANCHESTER – Manchester, NH

Corporate Trainer 2001-2002

ADDITIONAL PROFESSIONAL EXPERIENCE

COLDWELL BANKER ASHTON-KILGORE REALTY – Amherst, NH Licensed Realtor 2005-2006

EDUCATION & PROFESSIONAL DEVELOPMENT

DANIEL WEBSTER COLLEGE, NASHUA, NH

Bachelor of Science in IT Management – 2008

w GPA: 3.72/4.00

w Graduated Magna Cum Laude

Honeywell Security, Milwaukee, WI

Honeywell ProWatch Training - 2015



Contact this candidate