Page*
MUHAMMAD KASHIF RAMZAN
House # ***/A, Abu bakar Block, Shadab Town, Sahiwal, Pakistan.
Contact Number: +92-303-*******
E-Mail: acuz78@r.postjobfree.com, acuz78@r.postjobfree.com
OBJECTIVE:
To secure a position in a dynamic, professional and fast paced organization where I can
enhance my Engineering Skills and contribute to the growth of the organization with my
experience.
WORK EXPERIENCE SUMMARY:
More than 13+ Years working experience Onshore/Off shore in areas of fabrication, erection
and testing of piping and Erection of Equipment and vessels. Hand full knowledge and
experience in piping related drawings like isometric,P& ID,Piping Plan, plant smart
viewer(3D) Ext Also experience in all mechanical related drawings. Well experienced in
documentation like preparation of test pack, As built control sheet, welding summery ext
Also very well experienced in revising isometrics and p&id. Familiar with International
design codes; ASME31.1 & 31.3, ASTM, API & NFPA,and Work Permit Receiver in Saudi
Aramco,Abu dhabi oil refining company(Takreer), Abu Dhabi Company for Onshore Oil
Operations (ADCO), Abu Dhabi Liquefaction Gas Company (ADGAS) DAS ISLAND (OFF
SHORE). In-depth knowledge & Experience in Refinery, Power Plant & Petrochemical
Projects.
WORK EXPERIENCE DETAILS:
Asst.MECHANICAL ENGINEER: October, 2014 To Date
SAMBER ENERGY PRIVATE LIMITED (PAKISTAN)
Clint: Orient Energy, Ittefaq Construction, Noor-ul-Haq & Brothers etc.
JOB DISCREPTION:
Daily coordination with the superiors regarding the ongoing work schedule.
Requesting of Materials base on Drawing Approved.
Piping fabrication of various sizes of pipes and material class.
Monitor all personnel for good and proper application of the jobs.
Verification of isometric drawing with respect to P&ID.
Preparation of red lines (markup) on drawings during construction and submitting to
the end user (proponent) for approval, prior to make the final asbuilt drawings.
Reviewing the spool Releasing check sheet and sending to sites after approving.
Shop floor inspection and testing of fabrication pipes.
Witness of alignment, orientation and dimensions of installed piping
Preparing the punch list items as per P&ID and Isometric such as, Pipe supports, Valves, Guides,
Shoe supports and NDT completion and approving/ releasing packages for hydro test.
Page2
Checking joint fitup & Monitoring and ensuring that the appropriate consumables being
distributed to welders in order to make a sound weld.
Witnessing of pneumatic test, hydrotest, and flushing; system layup both in erection field.
Reviewing final Packages for Hydro tests, approving & releasing for Hydro test.
Asst.MECHANICAL ENGINEER, November, 2011 To September, 2014
Descon Engineering Abu Dhabi (UAE)
Clint: Abu Dhabi Liquefaction Gas Company (ADGAS) DAS ISLAND (OFF SHORE)
Abu Dhabi Oil Refining Company (TAKREER)
Abu Dhabi Company for Onshore Oil Operations (ADCO)
Habshan & Bu-Hasa
JOB DISCREPTION:
Working in Gas Oil Transfer Facilities Musaffah Terminal.
Directs and participates in welding works liaising with counterparts in Operations
to prepare necessary work permits; and executing work on site and/or in workshop. Ensures
availability of adequate level of consumable materials and spares.
Ensure all performed work is continuously monitored for complete compliance to
safety, quality, and productivity.
Installation of New Slop Pumps & Related Piping.
Oil Well Piping Fabrication and Installation
Oil Well Piping Valves, Strainers, Control Valves,& Related Equipment
Installation.
Executes small projects and approved modification work as directed by Engineer.
Participates in the preparation of inspection and welding procedures to ensure welding and
fabrication work is carried out in a safe manner and in accordance with international welding
and fabrication standards; codes and practices.
Makes pre sketch plans, design and estimation and Request of materials.
Assures that all joints are exposed for examination during the pressure test.
Conform repairs, re-testing and re-inspection in accordance with specifications
Making a re-instatement punch list and clearing the items.
Witnessing of Flange joint assembly and bolt torque.
Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest
drawing for construction, codes and specification standards.
Preparing and maintaining various QA/QC documents and final test packages.
Clearing of MCC (Mechanical completion certificate) items.
Reviewing the approved quality plans, manuals and scope of work to perform the required
inspection.
Page3
Piping SUPERVISOR: April, 2009 August 2011
Descon Engineering Pakistan
Clint: BHP Zamzama Gas Plant Dadu Pak
Lotte- Pakistan PPTA,Karachi
Engro Chemicals Ltd. Daharki Pakistan (Fertilizer Plant)
JOB DESCRIPTION:
Fabrication, erection, inspection, testing of various piping systems related to
refinery & Gas plant as per isometrics and GA drawings.
Ensure the completion of shop fabrication on time as per given schedule work
schedule.
Assign to pipe fabrication shop to monitor and supervise the inspectors quality
activities to ensure compliance to the relevant inspection and test plan.
Check that all project documents that are maintained in the pipe shop are the latest
revision before commencement of work. Continuously check and review the changes
status during the work.
Coordinate inspection activities discuss and resolve where possible problems
relating to quality with the company.
Prepare Erection schedule in consultation with clients and review the quality of
erection & reviewing the piping work as per client procedure and project specification.
Review Engineering package, piping design and drawing, piping layout, detailed
inspection and construction work,perform all material takeoff(Mechanical, piping
components, supports,insulation and coatings).
Planning of erection sequence as per site conditions & Mechanical inspection of
the system as per P & ID.
Ability to do mark ups & resolving tasks for SWN, S.C.R (shop change
requirements), F.C.R (field change requirements), drawings as per the site requirement
accordingly release to shop.
Assist in preparation of test packages for Pneumatic tests and Hydrostatic tests
and line check.
MECHANICAL SUPERVISOR: January, 2007 January 2009
Abdullah Faleh Al-Dossary Yanbu Saudi Arabia
Clint: Yanbu Petrochemicals Ltd Saudi Arabia
Saudi Arabian Oil Company (Saudi Aramco)
Natural Gas Liquids Plant Yanbu (NGL)
Yanbu Refinery
JOB DESCRIPTION:
Responsible of plan, organize, execution of piping fabrication and erection works.
Allocation of material, man power and equipment for daily work activities.
Page4
Verification of wall thickness / schedule of pipe and color coding as
specified in MTC by physical inspection.
Controlling traceability number during fabrication & erection.
Responsible in assuring all the pipe line systems in accordance to its
specifications, correct routing of the pipe according to its isometric drawings & P&IDs
and all structural supports for all pipeline system packages.
Checking the correct orientation of pipe spools, fittings and correct materials to be
used as stated in the design data.
Prepared as built drawings for modification and obstructed pipe spools.
Preparation of pipe spool drawings for shop fabrication and field erection works,
indicating shop weld and field weld limits.
Reinstatement activities and making punch list as per P&ID of those
system accepted by the owner.
Piping SUPERVISOR: September 2005, January-2007
Descon Engineering Pakistan
Clint: BHP Zamzama Gas Plant Dadu Pakistan
JOB DESCRIPTION:
Finalization of Pipe Routing (Big Bore+Small Bore)
Receiving the approved drawing for fabrication.
Preparing the fabrication schedule according to priority
Inspect the pipes and piping materials as per specification.
Guiding the sub ordinate and workers regarding proper use of tools and
tackles.
Adherence to construction safety and special safety requirement for
working at plant.
Allocation of jobs among various working groups
During the fabrication activities visual inspection of pipes and all fittings,
edge preparation, fit up of the pipe, welding quality of the pipe and D.P.T.
Coordination with concerned person. during fabrication & erection.
Reporting the Senior Engineer and construction manager regarding
whole day production Monitoring the front availability.
MECHANICAL TECHNICIAN: October 2002 June 2005
Dawood Hercules Chemicals Ltd (Fertilizer Plant)
JOB DESCRIPTION:
Page5
Carries out the skilled maintenance on such items of Plant and
equipment as compressors, steam turbines, pumps, fans, boilers, vessels,
columns, heat exchangers, LNG storage tanks, loading arms, flares, filters,
valves, etc
Carries out routine preventive maintenance of machinery and static
equipment according to schedules, check lists and specific equipment
requirements. This includes changing oils, cleaning strainers, replacing
filters, greasing and general overhaul of equipment. Repairs and or replaces
defective parts, reassembles overhauls equipment
Uses a variety of tools and measuring devices, such as hammers,
wrenches, pneumatic tools, high pressure jetting and drilling equipment,
grinders, calipers, feeler gauges, micrometers, Verniers, clock gauges, dial
indicators, etc. In accordance with permit to work system. Ensures that tools
used are correctly calibrated. Must be able to work to very close tolerance.
CERTIFICATION:
Work Permit Receiver 2007 to 2009
Saudi Arabian Oil Company (Saudi Aramco)
Scaffolding Supervisor 2007 to 2010
Saudi Arabian Oil Company (Saudi Aramco)
Job Performer for Abu dhabi company for onshore operations (ADCO)
Emirates risk Management & consultancy Abu Dhabi (U A E) 2012 to 2014
Job Performer 2013 to 2014
Abu Dhabi Oil Refining Company (TAKREER)
Basic Fire Fighting
Technical Inspection Bureau Abu Dhabi (U A E)
Basic First Aid Training & CPR Awareness
Technical Inspection Bureau Abu Dhabi (U A E)
EDUCATIONAL BACKGROUND:
Diploma of Associate Engineer (Mechanical) 1999-2002
From Punjab Board of Technical Education. Lahore, Pakistan.
Intermediate
From Board of Secondary Education Multan Pakistan.
Matriculation (science)
From Board of Secondary Education Multan Pakistan.
PERSONAL DATA:
Birth date: November 08, 1980
City Address: 100-A, Abu bakar Block, Shadab Town, Sahiwal.
Nationality: Pakistani
Civil Status: Married
CNIC No: 36502-1362998-7
Page6
Passport No: AK9219983
Languages Spoken: English, Urdu, Hindi, Arabic, Korean
Name of Father: Mian Muhammad Ramzan
Religion: Islam