SHAFIUDEEN BELLO
North Canton, OH 44720 773-***-****
(Work Status: US Citizen) acuz0s@r.postjobfree.com
SUMMARY OF QUALIFICATIONS
Experienced Engineer with a certified Project Management Professional (PMP) and strong background in the oil and natural gas industry. Designing natural gas gathering pipeline and facilities including metering and regulating stations. This includes developing project scope and execution, preliminary designs, estimating total project costs and economic analysis of project, equipment and pipe sizing, developing the necessary specifications and material selections for procuring material. Detailed knowledge and application of specifications, codes and standards (ASME B31.3, ASME B31.8, DOT Regulations, API Standards). Coordinate and manage multiple oil and gas engineering projects to meet design, construction and target dates and assist in achieving target budget. Incorporating ISO 9001 process to projects design and deliverables.
EDUCATION
Illinois Institute of Technology, Chicago, IL.
MS- Chemical Engineering 2012
(Energy, Environment & Economics Specialization)
University of Ilorin, Nigeria.
B.ENG - Mechanical Engineering 2001
EXPERIENCE
Access Midstream Partners/Williams Jan. 2013 - Present
Utica Unconventional Play (Facilities Engineer)
Responsible for overseeing multiple Midstream projects – pipeline and facilities
Development of the Utica Gathering infrastructure system (Approximately 200 miles of gathering line and Central Delivery Point). This includes working on HDD, Hot Tap, Pipe sizing
Responsible for Engineering on equipment sizing and selection using Promax, Enardo Sizing, Ariel Sizing for Compressor, Fisher Specification Manager for valves
Pipeline and Facilities Engineering Training of on boarding employees in operations department
Responsible for design standards and MAOP validation of Utica dry gas system
Responsible for coordination and documentation of all PSM and Process Hazard Analysis (PHA)review of facilities
Coordinate project activities with Engineering, ROW, Title, Permitting, Route Development, and other internal stakeholders and oversee QAQC of construction design package
Working closely with Production Control Group, Production Superintendents, and field personnel for optimization of company’s production growth and maximize overall value for the company
Develop project justification, scopes, schedules, cost estimates and budget tracking
Work to ensure business needs are met for the gathering system development and build out
Development and implementation of the Utica Gathering system project standards
Hess Corporation Dec. 2011 – Dec. 2012
Bakken Unconventional Play (Facilities Pipeline Engineer)
Ensure all aspects of the gathering line infrastructure projects (crude oil, low pressure gas, salt and fresh water) are carried out in a safe manner. Provide leadership in both design safety and site construction safety
Coordinate interfaces to maintain alignment between multiple stakeholders.
Lead the planning, evaluation, design and execution of various field compression facilities and crude stabilization facilities.
Performs economic analysis, project justification, cost estimation, AFE processing/submittal and budget tracking of facilities pipeline projects.
Manage the overall execution of equipment packages and modules from design through fabrication and on-site construction.
Support field construction, pre-commissioning and commissioning efforts, also working closely with field operations.
Work directly and consistently with team members and contractors to ensure adherence to project standards, procedures, scope, budgets and schedules
EN Engineering 2006 – Dec. 2011
Woodridge, IL (Pipeline Design Engineer)
(VECTREN ENERGY PROJECTS)
Bare Steel/ Cast Iron Replacement in Dayton Ohio and Indiana town (approximately 100 miles/year)
Coordinate design of construction drawing leading team of engineers and designers.
Reviewing design and supervising data computation into the Vectren GIS database and performing QA/QC.
Prepare project cost estimate and material requisitions.
(NICOR GAS PROJECTS)
Public Improvement/ Main Replacement
Handled potential conflict review of underground utilities with Nicor Gas and third parties regarding roadway infrastructure to avoid gas facilities relocation.
Designed pipeline relocation where required and coordinates all phases of projects including scope, ROW, contractor, procurement, inspection, construction and commissioning activities working closely with operations and commercial staff.
Coordinated design of retirement and installation of gas pipeline to improve the system by converting to high pressure to eliminate future repair and maintenance of the low pressure system.
Miscellaneous Revision
Designed the retirement and installation of underground regulating facilities (dual 5’X5’ Vaults). This includes field noting of surrounding area, reviewing real estate document for right of way and easements; sizing of regulators, pipe and system configuration.
Designed installation of house service regulators to improve the low pressure gas service supply to customers from existing distribution system.
Designed the retirement and installation of pipeline drip to improve the condensate removal.
Atlas International Engineering Services 2003-2005
Lagos, Nigeria (Project Engineer)
Prepared specification of bid proposals, engineering changes of existing equipment.
Analysed project economics and cost control, developed project execution plan.
Project management, assistance in fabrication and installation as required.
ExxonMobil Corporation (Mobil Producing Nigeria) 2002-2003
Lagos, Nigeria (Graduate Engineer)
Reviewed, analysed, computation and transmission of statutory monthly drilling, production and exploration reports.
Coordinated projects with the government regulatory body, for permits of pipeline installations, drilling and production, well revalidation, well completion and work over.
ExxonMobil Corporation (Mobil Producing Nigeria) 1999-2000
Eket, Nigeria (Trainee Engineer)
Designed and supervised hot tapping operation of storage tank valves revamp.
Designed modification of Edop and Ubit oil field production pig receiver for efficient pigging.
Preliminary survey study and feasibility report for the installation of QIT blower expansion of the flare area.
Conducted functional and integrity checks on production facilities such as generators, separators, pumps, liquid knock out vessel as outlined in piping and instrumentation diagram..
SKILLS
Computer Literacy: Windows Operating Systems
Software: Microsoft Office (Word, Excel and PowerPoint), AutoCAD
CERTIFICATE: Project Management Professional (PMP) – PMI Licence #1651430
ORGANIZATIONS
National Society of Black Engineers (NSBE), IIT chapter
American Society of Mechanical Engineers (ASME)
Institute of Mechanical Engineers (IMechE)