PAUL R. QUERZE acuyro@r.postjobfree.com

**** ****** **** *****. ***** Georgia 30809

617-***-****, Mobile

SUMMARY OF QUALIFICATIONS:

35+ years design, construction, start-up and facilities maintenance.

Diverse experience including Nuclear, Commercial, Civil and Institutional projects.

Work and promote a “Zero Accident” safety program in keeping with OSHA codes and standards.

National codes and standards commonly used to include: ASME, ASTM, AWS, AWWA, NFPA, ACI, IBC, and NQA 1.

Experienced DOE and Nuclear NQA-1 10CFR Appendix B compliant projects:

* Vitrification Plant at Hanford Nuclear Reservation - Richland WA.

* MOX Facility at Savannah River Site - Aiken SC.

* Plant Vogtle Units 3&4 -Waynesboro GA.

Extensive experience with Work Package development to close out, review and maintenance of DCR's /NCR's & CAR's

Review contract and subcontracts for technical accuracy with regard to applicable project requirements.

Trained and Experienced with Root Cause Analysis, Apparent Cause Analysis and Corrective Action Programs to include

generation of CRs, CDRs and NCRs upon discovery of non-compliant and non-conforming issues.

Experienced in direct Supervision of craft personal for both construction and maintenance projects.

Strong history as a Lead supervisor with strong interpersonal and motivational skills.

CERTIFCATIONS: ACI Level 1 concrete technician, OSHA 40 HAZWOPER Trained, Root Cause Analysis, Certified Six Sigma Yellow Belt, InterNACHI International Association of Certified Home Inspectors

WORK HISTORY

1/01/15 to present INSPECTION CONNECTION of AUGUSTA, LLC. EVANS GA

Owner / Operator. Residential and commercial inspections and build surveys. Construction Management.

04/14 to 10/14 Weirich Consulting Services Inc. / MOX Project. SRS Aiken, SC.

Senior Construction Engineer/ Operations Group. – Granted unescorted access to the MOX facility. Final review of Legacy Civil and Mechanical work packages with oversight of 5 mechanical and 2 civil engineers prior to NRC turnover for final closeout. Reviewed Engineering procedures and documents. Also responsible for tracking metrics and schedule.

1/01/13 to 04/14 INSPECTION CONNECTION of AUGUSTA, LLC. EVANS GA

Owner / Operator. Residential and commercial inspections and build surveys. Construction Management.

02/12 to 11/12 CHICAGO BRIDGE & IRON (SHAW) Plant Vogtle 3&4 Waynesboro, GA

Senior Field Engineer / Lead Field Engineer Night Shift – Assigned to work at Nuclear Island #3 with unescorted access. Performed daily field work activities with the civil engineering group. Supported supervision on Planning, Constructability and sequencing activities between various craft disciplines. Oversite of embeds and concrete installation, planning of bottom head “reactor vessel” installation and grouting. Coordinated and scheduled work with site Supervision of mechanical installations. Updated and released work packages as necessary which were provided to supervision and craft at the start of each shift as part of shift turn-over.

05/09 to 02/12 BECHTEL CORP/ DULLES TRANSIT PARTNERS, LLC. VIENNA VA

MOT Superintendent- Responsible for the Labor Group & Maintenance of Traffic. Coordinated all manpower and equipment on all traffic closures for operations, scheduling of police details to support night road work. Activities including paving, striping and utilities relocation for the rail project.

QC inspector for w. DELTA rail Co. QC surveillance for concrete placements of elevated rail sections, Plinth placement for Delta subcontractor Unna Construction. Operation is “top down” construction for rail installation.

Subcontract Technical Representative - Responsibility for oversight of the Early Roadwork Contract, Established work zones for direct hire to follow and build rail facilities, Review of subcontractor Submittals, Coordinate between Design Engineering and construction. Chair progress meetings as liaison between Owner, Utilities Agencies, VDOT, and Subcontractor to resolve issues related to Quality, Schedule and Milestones.

6/07 to 11/08 BECHTEL NATIONAL, INC. Hanford Nuclear Reservation Vitrification Plant Richland, WA

Senior Field Engineer- Assigned to the HLW (HIGH LEVEL WASTE) Building. Performed daily field work activities in the civil engineering group to include daily inspections, constructability and sequencing along with required rigging requirements to install and complete active work packages. Oversight of rebar, embeds and concrete installation as well as Design Change Notices, Engineer Change Notices and close out of issues with QC on any Non-Conforming records. Tracked weekly pay requisitions for quantities installed. Coordinated scheduled and reviewed shop drawing submittals for form work subcontractor (Symons Forms). Maintained, updated and closeout of work packages.

12/00 to 4/07 BECHTEL Central Artery/Tunnel (CAT) Project. Boston,MA Contract Closeout - Finalize contracts, punch lists and final inspections along with completed as-built documentation. Coordinate Certificate of Occupancy & Inspections with the City of Boston Department of Public Safety along with the State of Massachusetts inspectors. Review all code and contract requirements for final turnover.

Senior Mechanical Start up Engineer: Operations/Start-up & Testing BECHTEL Central Artery/Tunnel (CAT) Project Witnessed and coordinate all Life Safety systems and Hydro tests for Stand Pipe Fire Systems in conjunction with City of Boston and Boston Fire Department project wide “Roadway, Tunnels and Facilities”. Rigging and final setting and installation of equipment and controls. Lead point of contact of early opening I-90 from the existing prudential tunnel throughout the Ted Williams tunnel to East Boston at Logan Airport. Authored procedures for start-up, testing of rotating equipment and installation, pipe installation, testing Sprinkler systems and Stand pipe, HVAC, Tunnel smoke evacuation system, installation, testing and as-built documentation along including weld maps for compliance to applicable national and local codes, maintenance of operations, procedures for facilities and tunnels storm water and low point pump stations. Review of test results and secondary review of material and equipment submittals and approval. Project wide systems O&M manuals and as-built drawings. Work Package turnover documentation for acceptance and compliance to the Massachusetts Turnpike Authority “MTA”.

12/99 to 11/00 Consultant, Boston, MA.Construction Superintendent- Phase II Sony Stadium Theater with food Court in Revere MA. Managed schedule, sub-contractors, quality control, project safety, estimating and procurement.

03/92 to 12/99 Bechtel, Central Artery/Tunnel (CAT) Project. Boston, MA.

Civil Field Engineer- I-93 South Interchange, $128M Sentimental Precast Concrete Viaduct, Ramps, Boat Section, Streets, Utilities. Completion & Turnover of Storm Water Pump Station to Mass Turnpike Authority. Traffic Engineer: Worked with contractor on alerts & advisories; attended meeting with Mass Turnpike, Boston Traffic Dept. & Mass Highway Dept. for implementation; reviewed maintenance of traffic setups; scheduled state and city police details. Utility Coordinator: Interfaced with Boston Edison Co. Boston Gas, Bell Atlantic and Boston Water And Sewer.

Civil Field Engineer- South Boston Interchange, 318M Cut/Cover Highway Tunnel, Transit Tunnel & Station, Streets & Utilities. Coordinated with office engineer and contractor on payments and quality control program; planed field staffing. Traffic Engineer: Worked with contractor on Alerts & Advisories, attended meetings with Mass Turnpike, Boston Traffic Dept. & Mass Highway Dept. to implement concerns on above; conducted maintenance of traffic daily inspections for public safety.

Mechanical/Civil Field Engineer – Boston Water and Sewer, 2.7M Replacement Sanitary Pump Station. Lead Field Engineer overseeing contractor for inspection of work, installation, Quality Control and Payments. Responsible for maintenance of temporary pump station during construction of the Boston Water and Sewer system. Conducted finial inspections with project Operations group and city Departments for Certificate of Occupancy. Expedited “work-off” of final punch list. Coordinate turnover to Boston Water and Sewer, along with training of operations staff and completing as-built drawings. Served as contact for On-call warranty/maintenance of operating station until final acceptance by “BWSC”.

Civil Field Engineer- Ted Williams Tunnel Tie-in, 248M Cut/Cover Highway Tunnel, Boat Section, Streets, Utilities relocation and Material Disposal contract. Responsible of set-up & maintenance oversite of dirt disposal Facility at Subaru Pier and Spectacle Island, Including all marine operations, crane barge rigging and safety requirements, construction of two docks and maintenance. Tracking, testing and disposal of material generated fromC04A2 contract and others, supporting down town excavations. Point of contact for environmental compliance per EPA, DEP and City of Boston requirements. Along with permit issues with the Army Corp. of Engineers. Successful turnover of Subaru Pier and Spectacle Island facilities to follow-on contractor. Hazardous waste remediation of RCRA/CERCLA and Non-RCRA Bills of Lading and manifests for the State of Massachusetts at Subaru Pier stockpile and test facility. Inspection and coordination of Nagel slurry wall construction cross bracing and excavation. Inspection and coordination of cofferdam tie-in to the Ted Williams Tunnel construction, waterproofing and back-fill. Inspection and testing of waterproofing, Tie-back detensioning and back-fill of East Tunnel box. Utility Coordinator for Massport Haul Road, Summer Street and Northern Avenue to City of Boston. Inspection of installation of replacement Summer Street Pump Station for BWSC Including start-up, testing, turnover, training and warranty issues.

11/85 to 03/92 Self-employed, Winchester/Billerica, MA. Architectural & CM Consultant – Design and contract drawings for residential and light commercial construction in the greater Boston area. Develop special programs; Establish and monitor construction budgets on restoration and rehab projects. Managed schedule, sub-contractors, estimating and procurement. Prepared final punch lists and completed for final turn over and acceptance with owner and developer.

Superintendent- projects around New England to include: 8500 sq. ft. Day Care Center for Corp. Kids/ Cabot, Cabot & Forbes, Mansfield, MA. Addition to South Willow Street Fire Station, Manchester, NH. Rehab and tenant fit up for Manchester Airport Authority at Manchester Airport NH. 5000 sq.ft. Dunkin Donuts and Video library, Milford, NH. 5 M. (2) Twenty, unit apartment buildings at Merrimack College, Andover MA. 12,500 sq. ft. warehouse addition for Serono Labs, Randolph, MA. 4000 sq. ft. Office renovation at the Pilot House, Boston MA. 400,000 sq. ft. condo project in existing mill building, Lincoln, RI. 14 M Office/ Industrial building for Tamboni Corp. New office building for the Greek Diocese of Boston, Brookline MA; New 12 story tower build for the Travel Lodge in Brookline Ma. and a new branch building for the Shawmut Bank, Peabody, MA.

05/78 to 11/85 Shepley Bulfinch Richardson & Abbot. Boston, MA.

Architectural Draftsman and Job Captain- all phases of production work; produced schematic design development and construction documents. Conducted field walk downs, punch list and documentation for contractor payments. Introduced CAD system and adapted it for architectural use. Trained personal to utilize a system designed to provide an efficient and flexible tool in marketing, production and facilities management. Projects included, Bristol County Courthouse, New Bedford, MA; Renovation of McLaine's Hospital Belmont, MA; Renovations at Mass General Hospital, Boston, MA; New Tower building and Nuclear Medicine facility at Danbury Hospital, Danbury CT; New Tower Building at Children's Hospital, Boston MA; New African/Asian pavilion on the mall at the Smithsonian, Washington DC.

EDUCATION and PERSONAL DEVELOPMENT PROGRAMS

Boston Architectural Center Architectural Design 1978 – 1982 Wentworth Institute of Technology Architectural Engineering Technology 1976 – 1978

References furnished upon request