Post Job Free
Sign in

Mechanical Engineering

Location:
Belo Horizonte, MG, Brazil
Posted:
May 25, 2016

Contact this candidate

Resume:

December **, ****

LINCOLN Gonçalves Manso - **/**/1955

Rua José Horta Costa, 191 - Bairro Alvorada - phone: 55-31-339*-**** Cntagem - MG - CEP 32042-170 .: - Brazilian - BRAZIL E-Mail: acux4h@r.postjobfree.com

OCCUPATION: Mechanical Designer, design, verification, correction. Performance: DRAWINGS AND PROJECTS ELECTRONICS (in AutoCad 2D and 3D for studies), IN MECHANICAL (Resistencia of materials), PIPE (plants, isometrics, spools, CALDEIRARIA, METALLIC STRUCTURES (calculation memory), refractory (molds in general), Junctions check and WELD procedures, MACHINING, ASSEMBLY, MAINTENANCE, FIELD SURVEY, THE BUILT, BUDGETS, Industrial CONSTRUCTION FINANCIAL, PLANNING, ETC. AVAILABLE TO TRAVEL AND WORK OR GENERAL MINE OUT, WORK FREE LANCER ON LINE.

• Knowledge and use of technical standards applicable in industrial projects (ASME, ISO, IEC, DIN, BSI, AFNOR, AMN, JIS, ASTM, IEEE, NFPA, etc

• Knowledge and use of relevant Regulatory Standards in projects (NR09, NR10, NR11, NR12, NR13, NR15, NR17, NR23, NR24, NR36, etc

• Knowledge of Office package, mainly spreadsheets in Excel; EDUCATION

University

School University of Itaúna Local Itaúna - MG Study Industrial Mechanical Engineering Conclusion 1986/1988 - Incomplete. High School

School College Arnaldo Local Belo Horizonte - MG Study Mechanical Design Conclusion 1984.

Professional experience:

To date, working with FREE LANCER

Until this, working as a freelancer

Home in Usiminas SA MECHANICAL in CUBATÃO - São Paulo, on 19/04/2010 up to 19/02/2011. Function: SENIOR TECHNICAL ASSISTANT, as DESIGNER IN Mechanics area, Steel Structure, Pipe, Boiler, Lifeline, spools, staves cooletr, hoppers receipt and dust hoods, etc., for the Reform of Blast Furnace 2, USIMINAS SA

Home in Usiminas SA MECHANICAL IN SAO LUIZ - MARANHÃO, ON 18/01/2007 until 15/12/2008.

Function: ENGINEERING COORDINATOR, as ASSISTANT TECHNICAL Senior FOR ALUMAR, team Command 16 employees of the Engineering sector (01 Calculation Engineer and 06 designers) for Pipe and generate manual spools and Spoolgen and Autocad, too functions in Auto cad

(Steel Structure, boilers, etc.) for Implementing the Expansion 02 Refinery ALUMAR (São Luiz- Maranhão), The General Built. Calculation and Lifelines projects, coordinate the contractor Lyon Engineering, with 11 professionals, drawings and projects Electrical, Instrumentation and Utilities, etc.

Home in CLB Ltda, in 2.23.06, paying Drawings services and PIPE Projects (isometrics, supports, piperack, field survey, the builting, ect) in the expansion of AÇOMINAS / GERDAU for new reheating furnace billet in water, oxygen, nitrogen and drinking water. Home in LINETEC Ltda, in 11/23/05, paying PIPE services in the expansion of Açominas / Gerdau to new reheating furnace billet in water, oxygen, nitrogen and drinking water. Home PAUL WURTH in OF BRAZIL, in 12/092005 in metallurgical activities, steel makers, in general, Steel Structures, Mechanics, etc.

CLB - Designs & Projects

From 17/01/2005 to 09/09/2005, paying Designer Services in MAGNESITA SERVICE LTDA, the industrial city of Count.

Services: NEW MECHANISM P / DRAWER VALVE, P / STEEL PANS, MOULD P / BRICKS refractory, ETC.

Emproser Engineering at Tres Marias, Minas Gerais, for the CMM. RCT - SERVICES LTD vulcanization

28/04/2003 - 20/02/2004

position: DESIGNER

development of semi-automation project, the vulcanization project conveyor belts and refractory coatings among others.

Portfolio Ltda.

19/03/2002

Position: Designer and machines Planning.

Description of activities:

- Design of a Continuous Rolling Mill

- Support sales machines and various equipment.

- Machinery Planning.

SUMMARY OF PROFESSIONAL EXPERIENCE:

Period: 26/06/2000 ä 15/11/2001

Company: EPC - Company Projects e Consultoria Ltda. In the SMS Demag:

Tropicalization Rolling Projects

- (CST - Shark, the furnace I Reform

the MANNESMANN} .no office of EPC,

Industrial Pipes services, for

Usiminas and CVRD.

Period: January to April 1999

Company: Jaco Poiri - For CBMM

Function: Project Coordinator of the Establishment of Pyrometallurgy in Araxá. KTS - Korf Steel Technology Ltda.

19/10/1992 - 05/03/0998 - Position: Designer IV

Description of activities:

- Steel Projects in general.

- The top of the Alto Reform oven I of MANNESMANN, installing new rotary hoppers system.

- Blast Furnace II MANNESMANN.

- EOF for Steel Aliperti.

- EOF II - Steel Company Pains - Divinópolis - MG

- EOF - AF's Trieste-Italy.

- Mini sintering - Perkasa / Indonesia.

- Pre-heater scrap - Daido / Japan.

- Reform of the continuous casting of PAINS, the 4th increase came and continuous dolingotamento cooling bed.

- Project installation of Mini Sintering of Mamore Mining and Metallurgy Ltda, to 80T / day, with 24 pots in a rotating carousel and support equipment..

- {Design and assembly on site) of a pilot plant in the sintering CBMM / Araxa - MG - in 11/1997.

- Design of a laboratory unit for sintering in CBMM / Araxá - MG - in 12/1997. Lanaço Ltda.

19/07/1988 - 17/10/1992

Title: Rolling Supervisor - Project

Description of activities:

- Design and calibration of channels thinning cylinders intermediaries.

- Dobretas installation.

- Diversification projects for production line.

Cia Siderúrgica Pains -. Divinópolis

27/05/1985 - 17/10/1988

Position: Mechanical Maintenance Supervisor

Responsibility of the job: Industrial Maintenance

Description of activities:

- Corrective and Preventive Maintenance of all mechanical plant equipment as:

. Cranes, Gantry Cranes, water pumps, fuel oil pumps, compressors, blowers, conveyors, mechanical cars, blower rotors, speed bumps, etc.

OPERATIONAL EXPERIENCE

- Computer drawings in the ME program.

- Computer drawings in AutoCad program versions R13 / 14/2000/2002/2004 / 2005,2010,2014.

- Computer drawings in AutoCad program - 3D (to study).



Contact this candidate