Louie Lloyd S. Magpoc
#*** ******** **. **** ********* Subdivision
Balanga City, Bataan, Philippines
Mobile No. +639*********
Email.Add. acux2m@r.postjobfree.com
OBJECTIVE
To be able to secure a position that will serve not only for the purpose of career advancement but also
as a challenge to my knowledge and abilities to gain skills and expand comprehensions in innovative technologies.
HIGHLIGHT OF QUALIFICATIONS
Currently working offshore as a marker fitter. Years of experience working on oil and gas field. Good co-worker; excellent knowledge of the principles, methods and techniques used in structural construction and pipefitting trade; reliable employee; fast learner; competitive and hardworking; ability to read and interpret detailed sketches and blueprints for structural and pipe fitting; physical strength; strong knowledge and ability to perform manual labor or mechanical operations (construction, installation, repair, and maintenance); computer literate; excellent and effective communication skills.
RELEVANT WORK HISTORY
Adinin Works and Engineering Company ( Brunei Shell Petroleum Offshore ) Brunei Darussalam April 2014 up to present Marker Fitter
Mechanical maintenance for Brunei Shell Offshore Platforms.
Site surveys and measurements base on drawing.
Check requirements from drawings and written instructions, identifying materials
Cutting of pipes, pipe supports, platforms structural using oxygen acetylene.
Marking, lay out, fit up of pipes, pipe support, platforms structural, etc.
Alignment and installation of platform structural, pipings, support, etc.
Clearing of punchlist items.
Attends daily toolbox meeting on safety, quality and productivity.
Working, cutting/ modifying structural or piping by use of mechanical machines/ automatic tools.
Repair of existing or installation of new pipelines or platform structural.
Arabian Chicago Bridge and Iron Company ( Qurrayat Open Cycle Powerplant Ext.2 ) Qurrayat Saudi Arabia January 2013 – September 2013 Pipe / Tank Fitter A
Erection of shell plate, dixon scaffold, etc. by a mobile crane.
Lay out, fit-up and installing of materials base on drawings.
Check requirements from drawings and written instructions, identifying materials.
Attends daily toolbox meeting on safety, quality and productivity.
Hydrotest of tanks and pipe system.
Internal floating roof air raising.
Fit-up and installing of pipes and pipe supports connected inside and outside of the tank.
Sealing of roofs for cone and floating roof tanks.
Clearing of punch list items base on test packages.
Chicago Bridge and Iron Eastern Anstalt ( Takreer - Inter Refinery Pipelines II ) Mussafah, Abu Dhabi, UAE July 30, 2011 – August 19, 2012 Pipe / Tank Fitter A
Erection of shell plate, wind girder, etc. by a mobile crane.
Lay out, fit-up and installing of materials base on drawings.
Check requirements from drawings and written instructions, identifying materials.
Attends daily toolbox meeting on safety, quality and productivity.
Hydrotest of tanks and pipe system.
Floating roof air raising.
Fit-up and install of pipes and pipe supports connected inside and outside of the tank.
Sealing of roofs for cone and floating roof tanks.
Clearing of punch list items base on test packages.
EEI Corporation, No. 12 Manggahan St. Brgy. Bagumbayan, Quezon City May 1, 2010 - July 1, 2010 Scaffolding Trainee
Performs tasks as required on daily basis.
Attends daily toolbox meeting on safety, quality and productivity
Complies with project safety requirements.
Works with crew members on daily assigned tasks.
Prepares necessary tools equipment and materials needed for erection / dismantling of scaffolding task assigned for the day.
Erect / dismantle scaffolding safely and correctly in accordance with company standards.
Upholds the Company’s code of business conduct and ethics, fraud policy and conflict of interest and ensures his team’s compliance thereto.
EEI Corporation, No. 12 Manggahan St. Brgy. Bagumbayan, Quezon City June 17, 2009 – October 7, 2009 Pipe Fitter A
Review drawings and take-off materials.
Site surveys and measurement base on drawings.
Identification of materials, verification as per project requirements.
Markings, cutting, grinding, fit-up of spool. Spool fabrication.
Pipe supports / Structural fabrication.
Request for the scaffold erection prior for installation.
Air blowing of spool to remove dust / debris before installation.
Erection manually or lifting by a mobile crane with lifting calculation.
Site installation, fit-up.
Alignment of piping’s / installation of pipe supports and guides.
Alignment of piping’s to equipment and pump nozzles.
Request for Non Destructive Test ( NDT ) for the completed lines.
Clearing of punch list items base on test packages.
Preparation for hydrotest / pneumatic test for final inspection.
Water flushing / air blowing for drying up the line after hydro test.
De-blinding of isolated lines.
Pre-commissioning. Introduction of product to the line with the client.
EEI Corporation ( Petron Bataan Refinery ) Limay, Bataan July 2007 – March 2009 Pipe Fitter A
Review drawings and take-off materials.
Site surveys and measurement base on drawings.
Identification of materials, verification as per project requirements.
Markings, cutting, grinding, fit-up of spool. Spool fabrication.
Pipe supports / Structural fabrication.
Request for the scaffold erection prior for installation.
Air blowing of spool to remove dust / debris before installation.
Erection manually or lifting by a mobile crane with lifting calculation.
Site installation, fit-up.
Alignment of piping’s / installation of pipe supports and guides.
Alignment of piping’s to equipment and pump nozzles.
Request for Non Destructive Test ( NDT ) for the completed lines.
Clearing of punch list items base on test packages.
Preparation for hydrotest / pneumatic test for final inspection.
Water flushing / air blowing for drying up the line after hydro test.
De-blinding of isolated lines.
Pre-commissioning. Introduction of product to the line with the client.
TRAININGS OR SEMINARS
TROPICAL BOSIET WITH EBS AND TRAVEL SAFELY BY BOAT ( MEGAMAS BRUNEI ) ( issued: 04/05/2014 expires: 03/05/2018) ( certificate no: 005159060405149897 ) ( vantage no: 1485493 )
MOBILE CRANE LIFTING TRAINING ( CBI ABU DHABI UAE) August 2013
ACHIEVEMENTS
Best Employee of the Month – Arabian Chicago Bridge and Iron Company ( February 2013 ) Best Fitter of the Week – Arabian Chicago Bridge and Iron Company ( February 2013 )
EDUCATION
College : UNIVERSITY OF SANTO TOMAS
Bachelor in Secondary Education
Espana St. Sampaloc, Manila
2001 - 2004
Secondary : JOSE RIZAL INSTITUTE
Orani, Bataan
1997 - 2001
Elementary : ORANI NORTH ELEMENTARY SCHOOL
Orani, Bataan
1991 – 1997
PERSONAL PROFILE
Date of Birth : May 18, 1984
Place of Birth : Orani, Bataan
Address : Balanga City, Bataan
Height : 5'11"
Weight : 160 lbs.
Civil Status : Married
Religion : Roman Catholic
Sex : Male
Nationality : Filipino
Passport No. : EC1974238
REFERENCES AVAILABLE UPON REQUEST