Post Job Free

Resume

Sign in

Project Construction

Location:
Navi Mumbai, MH, India
Posted:
May 22, 2016

Contact this candidate

Resume:

PRABHAKAR H. KOTHEKAR

Amit C.H.S., Flat No. ***, Plot No. 09, Sector-8E, Roadpali, Kalamboli, Navi Mumbai, Raigad, M.S.410218

Contact: +91-704*******, +91-986*******; Email: acuwdi@r.postjobfree.com, acuwdi@r.postjobfree.com

ACCOMPLISHED CIVIL PROJECT MANAGEMENT PROFESSIONAL

Offering 24+ years of rich experience in delivering optimal results & business value in high-growth environments in Project Management, Profit Centre Operations in the industry of manufacturing, Real Estate and Infrastructure.

PROFILE

Professionally competent Civil and structural Project Manager with career success of over 24 years in managing Industrial & Infra projects & contributing design and drawing work for civil structures/projects in reputed concerns, Successful record of accomplishment of delivering superior performances under demanding work environment to total satisfaction of the management.

Established professional credibility in the areas of project designing, planning, scheduling, coordination, resource mobilization to ensure execution within scheduled time & budget. Exceptional ability to work accurately & quickly prioritize & coordinate tasks whilst simultaneously managing the diverse range of functions from multiple sources.

Currently spearheading functions as DGM-Construction with M/S. Lodha Group, Navi Mumbai. Professional strengths in striking perfect coordination with all involved agencies including architects, consultants, site engineers, subcontractors, vendors to identify and isolate areas of obstructions to accelerate project implementation.

Expertise in implementing latest safety and quality construction / finishing methods to maximize client’s satisfaction. Technology savvy and possess proven capability in application of modern construction equipments & methodologies to boost productivity levels and work efficiency.

Capable of inducing swift project ramp up to set work tempo to ensure project delivery in strict compliance with world-class quality systems/procedures. Professional maturity in managing large workforce / cross functional teams and synchronizing their efforts to optimize productivity levels.

Areas of Expertise

Project Management Construction Management Site Management Civil Engineering Structural Engineering Resource Mobilization Operations Management Quality Management Budgeting/Cost Control Maintenance Management Drawings/Documentation Crisis Management

Performance Milestones

Credentials of being awarded by Reliance Industries Ltd towards dedication & hard work.

Received awards/appreciation by M/s Ispat Industries Ltd towards successfully completion of 900 mm dia cross country Raw water pipeline.

Holds the distinction of visiting China (Hong Kong, Beijing & Changsha) to discuss technical related issues such as IS codes, soil data, drawings, freezing of layout of our upcoming 198 Sqm and executing the Sinter Plant Project at Ispat Industries Ltd. Gettapuram Dolvi with CMI (Design Institute) & MECC.(Trade).

Key Projects Handled

Hot Strip Mill Project: Executed Civil & Pilling work in Ladder furnace, Caster, Control room, tunnel furnace, slag pit, roll shop, repair shop, slitting machine foundation soil improvement in coil yard by micro piling.

Blast Furnace Projects: Executed Piling & Civil work in furnace foundation, blower house, hot metal track foundations & laying of rail track, stock house, and control room.

Oxygen Plants: Executed Civil & Piling works in 100TPD, 37.5TPD, 300TPD, 1260TPD, 50TPD. With various types of foundations, sheds, control room, roads & drains.

Power Plant: Executed piling & some part of civil work in 256 MW Captive power plant.

198 Sqm. Sinter Plant: Executed Civil & Piling work (5700nos DMC piles & 40000Cum concrete), RCC hoppers, various foundations, 33KV Substation, control room, roads & drain.

Lime Canceling Plant: Executed civil work including structural false flooring, Kiln foundations & roads & drains.

140m high RCC Chimney: Continuous casting of 1407 cum foundation, Chimney construction with the help of slip form shuttering in the Sinter Plant.

900mm dial M. S. Raw Water Cross Country Pipeline: Admeasuring length of 30.0KM. from Nagothane to Dolvi Plant. Laid above & below ground including small creek & nallah crossing as prescribed in the MIDC permission & as per site profile.

Intake Raw water Pump House: Executed civil work in river water with cofferdam arrangement including controlled blasting at Nagothane.

Creek Crossing 900mm dia HDPE as well as M.S. pipeline: Executed across the Amba Creek 5.0m beneath the creek bed. Length of the pipe line was 600 Rmt. By floating method & bottom pull method respectively. LPG storage plant: Executed Civil & Piling work, storage tank foundations, and concrete road.

Raw water reservoir, Chemical Dozing & Filtration Plant: Executed civil work for 3.0 lacs Cum capacity RWR with counter fort walls, pump house, filtration plant & chemical dozing plant.

Plant Boundary wall: Executed civil & piling works admeasuring length 12.00Km. Boundary wall.

Jetty (port): Executed marine piles and precast RCC girders as well as cast in situ slab for 450m long jetty.

Residential and Commercial Complex in Mumbai & Alibag City.

Roads: Defty handling Construction of arterial, sub arterial road project from Sub grade to Black top with special reinforcement like Geotextile, Geogrid & Geocell within Special Economic Zone area effectively with planning, monitoring & execution. Managing construction of RCC close drain with Manholes, Culverts etc.

Civil Maintenance: Efficiently managing maintenance of horizontal works in terms of roads, sewerage, storm water drains & paving work.

Mega Residential Project Infrastructure: Managing Execution of Infrastructure like roads, road finish and services such as various pipelines, sewage network, STP etc.

CAREER GLIMPSE

Dy. GM -Construction M/S. Lodha Group, Navi Mumbai since Nov’14

Managing Execution of Infrastructure like roads, footpath and services such as various pipelines, sewage network, STP etc. In the Palawa city, Dombivali.

Sr. Manager-Construction M/S. RELIANCE INDUSTRIES LTD, Hazira Surat since Aug’14-Nov-14

Petrochemicals Civil Maintenance: Efficiently managing maintenance of varies structures in the Petrochemical plant.

Managing urgent civil works during one month long shut down of Cracker Plant, Prearrangement of shut down activities and during shut down maintenance.

GM-Construction M/S. NMSEZ (RELIANCE INDUSTRIES LTD), NAVI MUMBAI since May’06-July-14

A Multi Product special economic zone situated at Uran (Dronagiri), Ulwe, Kalamboli.

Accountable for constructing world class infrastructure like, Land reclamation, Boundary wall. Roads, drainage, sewerage facility & Multi storied commercial & residential buildings & Pre Engineering Structure.

Defty handling Construction of arterial, sub arterial road project from Sub grade to Black top with special reinforcement like Geotextile, Geogrid & Geocell within Special Economic Zone area effectively with planning, monitoring & execution.

Managing construction of RCC close drain with Manholes, Culverts etc.

Overseeing all phases of project execution; approved engineering/design changes, troubleshot and resolved complex technical problems, consistently meeting project deadlines and highest possible quality standards.

Providing on-site Management and quality control to ensure projects met time and budget requirements, and were built in accordance with contract documents.

Defining scope of the project and concluded works contracts with qualified & experienced contractors on reasonable terms. Enforced work performance within terms of contract.

Drawing up project plans, schedule of activities, budget, & cost estimates, planned, procured, mobilized, and deployed resources to deliver the project within defined time and costliness.

Reviewing the operational practices, identify the areas of obstruction / quality failures and advise on system and process changes for qualitative improvement in productivity.

Accountable for the Checking of design drawings for Steel, Concrete and Civil drawings, Checking of the Model with respective connection details and of the fabrication drawings from the model.

Efficiently examining engineering proposals for constructability carry out construction feasibility and method studies.

Manager (Civil) M/S. ESSAR CONSTRUCTION LTD, GUJARAT Nov’05-May’06

Efficiently drove Cast-in-situ Piling by Hydraulic MAIT Rigs.

Performed as overall in charge of Hydraulic MAIT Rigs piling. Executing driven cast in situ piling for Mill area. Caster, Blast Furnace, Sinter Plant, Jetty, Corex Plant, MRSS.

Efficiently examined engineering proposals for constructability carry out construction feasibility and method studies.

Provided leadership to cross-functional project teams and integrated their efforts to maximize operational efficiency.

Conducted review meeting with clients, site engineers, project managers, consultants, subcontractors, and vendors etc. to take stock of work progress.

Contributed technical and managerial inputs in defining project layouts, drawing up project plan, project designing & engineering.

Dy. Manager (Projects) M/S. ISPAT INDUSTRIES LTD, MAHARASHTRA Dec’95-Nov’05

Spearheaded efforts in managing estimation & planning of the project along with day to day monitoring & expediting project activities.

Involved in timely checking & processing bills of work done.

Responsible for handling inspection of materials in factories at respective places.

Identified and isolated areas of obstructions to catalyze project implementation. Maintaining perfect coordination with architects, consultants, subcontractors etc and provided needed clearances/ managerial inputs to ensure bottleneck free project execution.

Regularly liaisoned with local authorities and statutory bodies to secure necessary clearances / approvals to ensure smooth project implementation.

Effectively deployed manpower, machines and material resources to ensure project completion within defined time and cost parameters.

Asst. Engineer (Civil) M/S. SIMPLEX CONCRETE PILES (I) LTDs, MUMBAI Jul’94-Nov’95

Deftly handled Sponge Iron Plant including execution of piling work varying from 400mm dia to 1000mm dia in DMC as well as Casing method.

Deftly conducted various tests at site as per IS standard. Organized survey to be conducted for pile point.

Involved in the preparation of BBS & get it checked through consultants

Site In-charge M/S. RAIGAD REALTORS, MUMBAI Sep’91-Mar’94

Responsible for managing execution of residential and commercial complex in Mumbai & Alibag City.

Involved in the preparation of cost estimation of the items to be executed.

Interacted with subcontractors, labours & vendors for timely completion of the project.

Managed detail checking of the on-going site as per drawings

SCHOLASTIC PORTFOLIO

M Tech (Structural); 2013 KSOU

BE (Civil); 1991 Mumbai University

Computer Proficiencies: AutoCad 2014 Power Point Staad- RCC Designing (beginning) MS-Office 2000 SAP (R/3) and Internet Intranet Applications

Date of Birth: 13th July 1969



Contact this candidate