Post Job Free

Resume

Sign in

Welder tig+arc

Location:
Bangladesh
Posted:
May 20, 2016

Contact this candidate

Resume:

CURRYCULUM VITAE

APPLIED FOR THE POSITION OF WELDER 6G ( TIG+ARC )

Name :Md Joynal Abedin

Father’s Name : Md Shafi Uddin, Occupation : Farmer Mother’s Name : Zohura Begum Occupation : House Wife, Place & Date of Birth : Dhaka 02-06-1974

Permanent Address : Vill : North Shimulia, Post: Meghula, P.S : Dohar, District : Dhaka, Bangladesh.

Present Address : As above

Nationality : Bangladeshi By Birth. Religion : Islam Height : 1.67 Mtr, Weight : 70 Kgs,

Language (Spoken) : Bengali, Malaysian, Hindi, Russian & English, Written : English & Bengali.

Passport Number : BK 0017573, Expiry On : 24-JAN-2021 Place & Date Of Issue : Dhaka- 25-JAN-2016

Marital Status : Married,

Emergency Contact No : +880********** / +880**********. Email: acuvfa@r.postjobfree.com Educational qualification Class Eight passed

Recognition Of Prior Learning. Successfully Competent Of RPL Assessment welding level 1 From UCEP (under vocational board of Bangladesh, batch no 03) 27th November 2015. SEC(K) On Welding Skills Evaluation Certificate (K) At Singapore Batch July 2015. NDT Level ( II ) The Course Of NDT Level ( ll ) RT/UT/DPT/MPT, From Dona World Institute At Kolkata-India. Batch February 2015

English Spoken Course The English Spoken Course From FM Institute Bangladesh, Period 10th December 2006 To 12th Weeks.

Technical Qualification Completed Course Manual Metal Arc Welding From Bangladesh Oxygen Ltd, Period 10th December 1994 To 2nd February 1995.

Date Signature

EMPLOYMENT HISTORY

EMPLOYER NAME DESIGNATION &

QUALIFIED

DURATION PROJECT

AREA.

01 Mun Siong Engineering Welder 6g, Gtaw/Smaw, Shell Petroleum Refinery (Shutdown)

25th June 2015 To

08th oct 2025.

Sell Bokum Island

Singapore

02 C.D.C. Limited Welder 6g/6gr, By Abs

(Smaw) Oil & Gas Export Project.

13thmay-2014 To

07th Nov-2014.

Baku

Azerbaijan

03 Answer Company Limited. Welder 6g. By Krs.(Gtaw.Ss & Cs) Storage Tank & Piping.

11th-Jan-2012 To

20th-Jul-2012.

Bussan,

South Korea

04 Chevron & Zicom Welder 6g.(Gtaw/Smaw)

Oil & Gas Refinery Project.

10-Oct-2010 To 15-

Oct-2011.

Bibiyana, Sylhet

Bangladesh.

05

Bangladesh Foundry

Engineering Works.

Welder 6g/5g. ( Doly Mix ) 30

Inc,High Pressure Line.

05-Sep-2009 To 04-

Mar-2010.

Tangail.

Bangladesh.

06 Haji Malay Mashhor

General Contractor.

Welder 6g. Process

(Gtaw & Smaw )

29-Dec-2008 To 31st

July 2009.

Brunei

Darussalam.

07

Business King Limited

( Dapfcl )

Welder 6g.(Smaw)Fertilizer

Factory Gas Line.

01-May-2007 To 31-

May_2008.

Chittagong

Bangladesh.

08

Caspian Shipyard

Company Limited. ( Bp )

Welder 6g/6gr . By Abs.

Rig & Pipe Rack 1G Fcaw Auto

14-Oct-2004 To 1st-

Oct-2006.

Baku, Azerbaijan &

Aktau Kazakhstan.

09 Onda Industries

Company Limited.

Welder 6g. By Abs,

Process ( Gtaw & Smaw )

20-Mar-2001 To28-

Feb-2004.

Keppel Fels

Singapore

10

Dubai Dry Dock’s. Welder 3g/4g/&6g. By Abs,

Process (Smaw) (3g Fcaw)

11-May-1998 To 03-

June-1999.

Dubai Dry Dock’s.

U. A.E.

11 Eng Soon Engineering Pte

Limited.

Welder 3g/4g/& 6g.By Abs,

Process ( Smaw/ Fcaw )

11-Mar-1995 To 13-

Aug-1997.

Sembawang

Singapore



Contact this candidate