Post Job Free

Resume

Sign in

Engineer Project

Location:
Egypt
Posted:
May 22, 2016

Contact this candidate

Resume:

CURRICULUM VITAE

Name : AMIR MOHAMED ABDUL SAMIE AHMED

Position : Project Engineer / Piping Engineer

Nationality : Egyptian

Qualifications : 2009 – 2011 Diploma of Natural gas processing from Cairo University-

Mining and Petroleum Engineer division

: 2002 – 2007 Bachelor degree in Mechanical Engineering at Ain Shams University

Languages : English - Dutch – (Arabic– German)

Date of Birth : September 22, 1985

Status : Single

Home address : Ain Shams west, 11311

19 Mohamed Hassa-Balla St. Cairo –, Egypt,

Telephone : 00 2 (0)2- 22532307 (private) / 00 2 (010 – 012 733 07(mobile)

: 00 2 (012- 05799880 (business)

Email : acuv6a@r.postjobfree.com, acuv6a@r.postjobfree.com

Studies : Diploma of Natural gas Processing(Cairo University)

Contain: piping and pipeline transportation, Construction and storage tanks and pressure vessels,drilling, The Drilling Rig, Junk Drill pipe Design, Down hole Drilling Equipment, Drilling Fluid, Casing and Cementing, Formation Evaluation, Normal Drilling Operations, Special Drilling Operations, Drilling Problems, Completions, New developments,Natural gas reservoirs, Gas Engineering Fundamentals, and Gas Production

Petrochemical, Natural gas Utilization, Processing of Fractionation, Seperation and Purification, Instrumentation and Control, Measurements, Transportation&Storage.

Petrochemical (industries of hydrogen, fertilizer (Urea),ammonia,Ethylene oxide and vinyl choride,butadiene,Polymers and its structure and properties of polymer .Industries of polymer like High density poly ethylene and Nylone 66, Gas to Liquid Technology Like Fisher –Tropsh method. E.g. Sasol, Shell, Syncrude, Exon and Syntroleum.

B.Sc. In Power Mechanical Engineering Faculty of Engineering, Ain shams University. May (2007)

Computer experiences: MS Office (Word, Excel, Power Point), MATLAP, Microsoft access, Coraldraw-12,front page, MS-Projects,., CEASER II pipe stress analysis,AUTOCAD plant 3D Cadworks( 3D Design Modeling, Assembly, Drawing,) Software,(Isometric and PID), PDMS ( 3D Design Modeling, Assembly, Drawing,) Software AutoCAD (2D&3D), Solid Works( 3D Design Modeling, Assembly, Drawing,) Software Pipesim (Simulation of Pipe Phase),Shlumberger, PIPEPHASE, HYSYS7.2 ( Hydrocarbon simulation software), PROII

.

Training:

Pipe line design and AUTOCAD Plant 3D

CEASER II pipe stress analysis (AUC)

PMP Project management Professional attendance (OGS).

NEBOSH Attendance Safety Course

Welding inspection and Non Destructive test

Specification and codes

API 653,510,570 Attendance

Hysys for process modeling.

Gas Dehydration and Sweetening

Pump technology & troubleshooting

Fundamentals of mechanical Engineer

ASME B31.8 For Gas Transmission Pipeline

Oil & Gas Process / Facilities Fundamentals.

Cause and Effect and Failure analysis

MS- Project

Safety Training Observation Program "STOP" (GUPCO - Dupont)

Radiation training course ( AEA - GUPCO)

Environmental management system training course (GUPCO)

Safety courses in Permit to work (GUPCO)

Safety courses in Isolation tasks. (GUPCO)

Safety courses in Risk Assessment. (GUPCO)

Occupational health courses. (GUPCO)

H2S Training Course (GUPCO)

First Aid Training (GUPCO)

Manual Handling Training by Sparrow Com. (GUPCO)

Fire Fighting Training Course (GUPCO)

Lifting & Slinging Training Course (GUPCO)

Helicopter Safety Training Course (GUPCO)

Working cording to Gulden Rules course (GUPCO)

General: Work scenario: the profile will be, time to time, assigned to project teams developing proposals or executing projects related to the realization of industrial plants.

- Reporting to: Head of Piping Engineering Department

- Work location: Cairo – Egypt with possible frequent business trips or long term Assignments in Egypt and abroad (office & site support activities).

Work experience

2015-Present GS Engineering & Construction

ERC Refinery Project, Egypt

Piping Superintented Hydrotest

PRIMARY DUTIES AND RESPONSIBILITIES:

1.The Hydro test Superintendent is responsible to ensure the construction of the systems is completed in accordance with prescribed information prior to pneumatic and hydrostatic pressure tests being carried out for all test packages.

2.Prepare technical report, lists of outstanding items on a punch list submits it for construction to carry out the required test.

3.Monitors the hydro testing (hydrostatic and pneumatic) and handle reports on the completion of tests and to supervise line cleaning after hydro test.

4.Responsible for the examination of systems to ensure completeness, punch lists preparation, and readiness for hydro tests activities.

5.Interfaces with equipment, piping, instrumentation, electrical inspectors, civil/structural inspectors, field engineer and other field superintendent before proceeding for hydro tests of systems.

6.Interfaces with the client’s Quality Assurance representative for his presence at the test.

7.Reviews the documentation relevant to the systems and ensures the systems are constructed in accordance with the prescribed information – drawings, specifications and vendor information.

8.Coordinates with Project Manager and supervise the preparation of test activity to ensure all deficiencies are identified and punch lists are prepared

9.When the systems are to be tested, ensures the systems limits are identified, that necessary test equipment is in place and reviews completion of punch list items to ensure hydro tests may proceed.

10.Review and approve subcontractor and supplier documentation including quality plans, inspection and test plans, manufacturing/welding procedures, inspections and test procedures and manufacturing records.

11.Coordinates and monitors the hydro tests and reports on the completion of hydro tests.

12.Demonstrate a professional work ethic and actively participate as a member of the Discipline Workface Planning Team.

13.Interfaces with the Discipline Planning Teams to understand the construction schedule.

14.Assesses the impact of inefficiencies on the successful completion of planned activities and adjust the plan as required.

SECONDARY DUTIES AND RESPONSIBILITIES:

1.Complies with the highest level of safety during all stages of project execution to avoid any type of accidents. Take reasonable care of own health and safety and that of others in the workplace.

2.Complies with all statutory requirements connected with the implementation of project.

3.Assist in the proper closeout of project including transmittal of final documentation to client.

2013-2015 KHALDA PETROLEUM COMPANY(KPC)

Joint venture with Apache Corporation

AG&RZK Projects Site manager

Handling of multidisciplinary engineering/construction activities related to setting up of new facilities, expansions, upgrades and modifications for onshore oil and gas fields, long distance pipelines, and oil & gas process plants. Experience in handling major techno-commercial activities from SOR to reviewing FEED & deliverables, proposing job breakdown, cost estimate, feasibility study, bids evaluation, project planning and scheduling, and implementation of HSE programs, contract administration and construction management. Good knowledge with major international codes and standards for these projects and in implementation of projects in operating plant environments with minimum shutdowns and interruptions.

Construction Field:

-Installation of Gas, Oil and water injection flow lines with different materials (Duplex St. St., carbon steel…etc)

-Supervise the maintenance of the flow lines.

-Installation of Launchers and Receivers.

-Installation of new oil facilities.

-Sharing in the shut downs work of Gas plants such as Salam, Tarek and South Umbaraka Gas Plants.

-Installations of oil, water and gas manifolds.

-Supervise the quality control job for the welding inspection.

-Installation of oil storage tanks with several capacities (55,000 BBL, 25,000 BBL, 10,000 BBL& 4,000 BBL …etc).

-Construction and commissioning activities, welding, coating, hydro-test…..etc).

Also familiar with relevant international codes and standards including international company standards, e.g. specialist in piping activities including hot tapping of existing facilities and related safety requirements

Project, Mechanical, Piping and Pipeline Engineer

Projects Cairo Office with the following experience summary:

-M.T.O.’S and M.R.’S Preparation.

-Sharing in Tenders technical and commercial evaluation.

-Preparing the cost estimation data base and updating this data base.

-Preparing the scope of work for design, procurement and construction of Crude Oil Storage Tanks and Fire water Tanks.

Piping Specifications (e.g. supply, material, dimensional, fabrication, erection / installation, welding incl. equipment welding, testing, PMI, insulation

- List of piping special components

- Technical Bid Evaluation

- 3D- Model

- Piping isometric design and issue procedure

- Piping isometric list

- Piping isometric drawing

- Piping MTO and requisitioning procedure

- Pipe (ordinary, special and spring) support specification & summary

- Stress analysis specification and calculation (incl. notes)

- Data sheets for expansion joints, shock absorber, sliding plates and tracing manifolds

- Work Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

Supervision, and monitoring the field piping engineer activities for different piping systems (Oil, Natural Gas, Glycol, Air Utility, fire water, Flair,…etc), reading and reviewing ( GA’’2D’’, Isometric, P&ID ) drawings, punch lists flushing, pre-commissioning, commissioning, hydro test, leak tests…etc

Developing the process design for small projects or proposal consisting of a normal piping system component. And make the required bill of materials according to the international cods & standards such as:

ASME/ANSI. (B31.3, B31.8, B31.4

ASTM.

Project – Petrojet converting salam Desalters vessel to 3 phase production separator

The responsibility is to develop the followings:

The required piping man

Project – Cooling risers for UMB tank #4(UMB Fire Fighting)

The responsibility is to develop the followings:

The required piping man-hours to achieve the basic design and detailed design of the Piping included in a five revamp projects.

Project – WASCO Salma Plant Development - Egypt

The responsibility is to develop the followings:

The required piping man-hours to achieve the basic design and detailed design of the Piping included in this project.

Project – DIESEL STORAGE TANK.

The responsibility is to develop the followings:

Issue and review the stress analysis (selection of the critical line list, then developing the re-quired formal stress analysis using Caesar II and issued the stress analysis report to the cus-tomer and structural discipline)

2008-2013 Gulf of Suez Petroleum Company (GUPCO)

Joint venture with British Petroleum (B.P.) ( British Petroleum )

Project discipline Engineering

All the plant design & piping engineering and design activities (see deliverable list for details) required for the successful completion of the assigned project/proposal.

- Perform Quality checks on plant design & piping engineering documents issued by the Junior Plant Design & Piping Engineers

- Perform the interdisciplinary checks on the engineering documents as foreseen by the engineering procedures.

- Perform checks and reviews of documents provided by external agencies and Technology providers (licensors)

- Coordinate the plant design & piping activities of the internal team and of the subcontractors, technology providers (licensors) or other external stakeholders.

- Ensure that the relevant information flow is optimal in timing and quality.

- Identify optimal techno-economical solutions for the project smooth development.

- Ensure compliance with the applicable standards, specifications, procedures and good engineering practices with special regard to HSE and Quality.

- Maintain and foster the links with the other project functions promoting efficient and seamless interaction for fast track project execution.

- The profile shall be responsible for the above through directly executing the relevant necessary activities or coordinating the activities of Junior Plant Design & Piping Engineers assigned to him/her on a project basis. This will depend on the specific project workload scenario.

Soft skills: Strong team work attitude and ability to motivate the team members, significant communication skills, problem solving attitude, fast and multi-task execution capabilities, strong analytical mind set and imaginative problem solving ability.

Deliverable list: Activities falling under the profile’s responsibilities shall be (but not limited

to): Preparation of:

- Layout & Piping Design Criteria

- General Layout (Site Plan)

- Equipment Layout Plan (Unit Plot Plan)

- Piping Assembly Drawings Key Plan

- Piping routing studies

- Underground system routing and pavings

- Piping & Instrumentation Diagrams (P&ID’s)

- Line List

-

Provide the mechanical engineering expertise, this include preparation of engineering packages/drawings/specifications for in-house engineering projects. And Revising engineering designs prepared by international consultants.

Making the fluid handling studies for the different networks network types (gas, Oil, water). And pressure drop calculations.

Study the troubles of different operating systems and advise the suitable solution according to the international standards such as:

API (14C, 14E,)

BP specification

Provides a reliable process engineering assessment using the most widely used process simulator (HYSYS).

Evaluating pump performance and updating its performance curves according to its current condition. And participating in the design of component parts and individual units; reviewing and monitoring designs for conformance with control estimates and project specifications (Sizing and rating of Control Valve, PSV, Orifice Plate, Piping & Pipelines, Pumps, and Separators).

Acts as a reference source to other Departments. Includes liaising with Production, General Maintenance and to HSE Division, furnishing them with technical information as requested, suggesting improvements in their field of work and assisting in developing improvements initiated by them.

Reviews, comments or design Minor changes initiated by Production Dept. through

Management of Change Process

Participation in Integrity Engineering Discipline recruitment an development programs participating in the required Process Hazards Analysis (PHA) sessions.

FABRICATION ACTIVITIES

2008-2011

1- Ras Shukheir anode retrofit skids fabrication.

These skids used in cathodic protection of pipeline

Review the fabrication design of anode retrofit skids to be suitable to connect overcome corrosion.

Perform the interdisciplinary checks on the engineering documents as foreseen by the engineering procedures.

- Perform checks and reviews of documents provided by external agencies and Technology providers (licensors)

compliance with the applicable standards, specifications, procedures and good engineering practices with special regard to HSE and Quality.

Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

MTO and requisitioning procedure and 3D- Model

2- Fabrication Oil Pollution Tank Lifting Frame For 2ea 300bbl & 2ea 100bbl Tanks

Study the project scope of work

Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

MTO and requisitioning procedure and 3D- Model

3- Heli-Deck Safety Net

Study the project scope of work

Make review design of WorleyParsons

Follow the Fabrication steps.

Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

MTO and requisitioning procedure and 3D- Model

4- fab. Foam riser of tank 301 and curbed pipes

Study the project scope of work & specs for piping scope

Making Cadworks Review design and match the standards Rating and schedule

5-FAB RISER MECHANICAL REPAIR12" @ M-7

Hydrostatic test diagram

SIS –safety instruction sheet

6-fab. Foam riser of tank 312 and curbed pipes

Study the project scope of work & specs for piping scope

Work Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

7- Sand Blasting 60 / pipe 18" smls

Follow the Sand Blasting and UT-steps.

Hydrostatic test diagram

SIS –safety instruction sheet

8- GS-327 REPLACE WIND BREAKER (15 EA)

These used to prevent people from wind at platform.

Making 3D Model Review design

Prepare the detailed engineering, shop DWGS & BOQ

9- s / Ali BW & C Stairs

Making Cadworks Review design

Work Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

10- GS 327 PHASE II PROJECT (chemical skid )

These Skid used for supply the platforms with Varies types of chemical

Study the project scope of work

Study the project scope of work

Prepare the skid piping detailed DWGS

Issue and review the BOQ.

11 - R-6 Spool Fabrications.For Rehab Project With Enppi

Study the project scope of work & specs for piping scope

Issue and review the plant general arrangement

Issue and review piping isometrics

Issue and review material take off

Making Cadworks Review design and match the standards Rating and schedule

Prepare the detailed engineering, shop DWGS (piping plan& isometrics) & BOQ

12 - Boot landing.

Study the project scope of work

Issue and review material take off

Carrying out the required site visit to locate the tie-ins position, type, size and rating and choose the proper Structure to be Replace.

Work Requisitions (WR) relevant to Mechanical, Painting and Insulation activities

13- Riser guard.

That use to prevent riser from damage

Issue and review the plant general arrangement

Issue and review material take off

14- Process area Heat Exchanger inlet modification.

Issue and review the stress analysis (selection of the critical line list, then doing the required formal stress analysis using Caesar II and issued the stress analysis report to Piping discipline)

Plan & profile for the Piping

Carrying out the initial site visit for the tie-ins locations, and sizes.

September 2011 – July 2012 (11 months)

PIPING ENGINEER Worley Parsons

Project - Basic & Detailed Design And Engineering Of A New 150,000 Bbl Oil Storage Tank Proposal- Petrogulf Company) - Egypt.

The responsibility is to develop the followings:

The required piping man-hours to achieve the basic design and detailed design of the Piping network required to connect the new 150,000 Bbl Oil storage tank to the existing storage facilities piping network

Equipment Layout Plan (Unit Plot Plan)

Piping Assembly Drawings Key Plan

Piping routing studies and Stress analysis by Caesar ii 5.1

Project - Khalda Oil And Gas Company Proposal for Basic & Detailed Design for Propane tank Projects - Egypt

The responsibility is to develop the followings:

The required piping man-hours to achieve the basic design and detailed design of the Piping

Isometric drawing & bill of materials

As - built drawings of existing piping.

Piping material take off for estimation and purchasing

.

2007 – 2008 PICO Industries (EGYPT):

Mechanical Design engineer

I was responsible for installation of various instruments devices like (transmitters-RTD-thermocouple-pressure switch- level switch- H2 analyzer- CO2 analyzer-UBS-…)

Installing ultrasonic level indicator for the fuel oil tanks.

I was a member in the start up and commissioning team and made the necessary punch list.

I was a member in the team which reviews all the logic of control system.

I was responsible for installation of all the control panels and arrange the wiring.

CAREER SYNOPSIS

Amir Mohamed I’m a mechanical engineer, have a very good cleverness at more than mechanical branch such as Piping, Engineering, facilities, at Oil & Gas (onshore / offshore)

Amir Mohamed Professional knowledge: clear and solid knowledge of all the plant design & piping

Engineering related activities (see the deliverable list), ability to directly execute such

Activities. Clear and solid knowledge of plant design & piping software tools e.g.

Autodesk AutoCAD 3D, material database etc.

Amir Mohamed is Single and Strong team work attitude and ability to motivate the team members,

Significant communication skills, problem solving attitude, fast and multi-task

Execution capabilities, strong analytical mind set and imaginative problem solving

Ability.

Amir Mohamed Follow-up: vendor documentation for all piping material (e.g. Mechanical Catalogue

And Inspection Dossier)



Contact this candidate