Post Job Free

Resume

Sign in

Manager Project

Location:
Dallas, TX
Posted:
May 03, 2016

Contact this candidate

Resume:

To Whom It May Concern,

I am very goal-oriented and never frown upon a new challenge. I have in-depth experience in project management, contract negotiations, procurement, project design, construction, quality control, and lean practices in petrochemical, commercial, municipal, and manufacturing industries.

In further detail, my background in highly technical processes within operations has allowed me to be well versed in the managing of business processes across departmental boundaries.

Working in a team environment is enjoyable for me, and I know from experience what it takes to lead crews, contractors, and design teams in order to complete projects on time and within budget while minimizing operation downtime. I am willing to relocate my family for the right opportunity.

Kindest Regards,

Monte Cheek

Monte Cheek Jr.

500 N. Fulton Street, Rice, TX 75155 214-***-**** acumhw@r.postjobfree.com

Objective

Management/Project Management

Education

Bachelor of Arts and Applied Science, Business Administration 2013

Texas A&M Commerce, Commerce, TX

Six Sigma Green Belt (Project Management), SSGB 2011

Six Sigma Certification

Essentials of Chemical Engineering 2010

American Institute for Chemical Engineers, Houston, TX

Certificate of Proficiency in Computer Aided Drafting and Design 2004

Arkansas State University, Mountain Home, AR

Work Experience

Pre-Con Manager, Polk Mechanical Contractors Aug. 2015-Present

Grand Prairie, TX

Quality Manager: Responsible for reviewing scope letters for entire department prior to proposal submittal to ensure proper scope coverage and project risk analysis was covered.

Risk Manager: Responsible for determining if projects would be bid by examining quality of design, risk of project, and most importantly, profitability of project.

Relationship Establisher: Responsible for being point of contact with A&E firms to build relationships on highly complex projects.

Procurement Driven: Responsible for pricing negotiations with vendors for exotic materials of construction within our industrial division.

Technology Coordinator: Responsible for adapting estimating software to better suit our industrial division as industrial projects require different services and materials of construction than typical commercial project consist of.

Communication Specialist: Responsible for coordinating pre-construction meeting prior to construction to ensure proper project information turnover to Project Managers and Superintendents is achieved.

Change Management Leader: Responsible for change management throughout project life cycle by assisting Project Managers with proper scope management.

Senior Project Manager, Nalco Champion, an Ecolab Company May 2012-Present

Corsicana, TX

Team Leader for Special Projects: Given the task of managing the largest CAPEX project the organization ever approved.

PMI Driven Manager: Utilizing PMI standards for financially tracking the project on a basis of committed cost, variances, percent complete, budget/estimate at completion, and to-complete performance index.

Task Oriented Scheduler: Developed detailed work breakdown structure within Microsoft Project, resources assigned, to better track the project and attack critical paths.

Supply Chain Negotiator: Traveled across the country to negotiate lead times on specialty equipment. Downtime prevention and incremental startup was initiated through negotiated lead times.

Procurement Manager: Chosen to evaluate contractor and EPC firm selection. Reviewed all outgoing bid packages prior to transmittal and evaluated all incoming bids prior to awarding contracts. Responsible for setting up Master Service Agreements, Work Orders, and Vendor Documentation into SAP.

Lean Driven: Implemented Lean Practices throughout the plant by conducting Kaizen events, value stream mapping, training, and establishing a monthly 5S budget all while promoting continuous improvement.

Ad hoc Leader: Led teams across all departments to eliminate defects in current work/business processes.

Project Manager, Mountain Mechanical Contractors, Inc. Nov. 2010-Feb. 2012

Fayetteville, AR

Financial Driven PM: With scheduling software, I effectively scheduled delivery dates, critical paths, manpower, and WBS. This in turn allowed me to establish my planned values early on during the project life cycle. Utilized PMI standards in regards to tracking (i.e. earned value, cost variance, schedule variance, to-complete performance index, etc.) and correcting any deviation within my projects. Essentially results in being on time and within budget on a consistent basis.

Efficiency Creator: Effectively restructured company’s fabrication shop and implemented new detailin software for drafting department. Reduced field labor on $2 million dollar project by 30% due to PDS software that enabled us to build (2) 75+ page isometric books. Successfully turned project into an erector set within first 3 weeks of employment.

Project Closer: Provided commissioning during hospital project closeout, having not been involved with the project throughout its life cycle. Also generated closeout documents for large scale airport project under the same circumstances.

Project Manager, Corsicana Technologies, Inc. Feb. 2008 –Nov. 2010

Corsicana, TX

Skilled Project Manager: Completed 4 capital projects simultaneously that valued $8.5 million in 2008 and 2009; all projects were under budget and met their deadline

Detail-Oriented Designer: Design work done in 3D format with addition of a project model as an attachment to the scope; Produced 2D wireframe drawings from 3D objects for detailed construction drawings.

Efficiency Creator: Reduced expenses $150,000 (annualized) by designing and installing a pneumatic conveying system for sodium hydroxide (solid).

Effective, ROI-Driven Planner: Installed an injection well for waste water disposal (~$3 million project).

Proven Leader Chosen for Special Projects: Provided design and management for in-house ergonomic improvement program. Would scope, estimate, and construct projects as assigned.

Fluent User of Software: Fluent in AutoCAD, CadWorks Plant, CadWorks Equipment, Navisworks, Corpscon, SAP, E-Maintenance (CMMS), Excel, Word, project management software, and Microsoft Project.

Increased Capacity: Designed and installed capital projects which included new chemical reactors, blenders, utilities, and related piping to introduce new lines of chemistry to the organization.

Environmentally Sound: Designed and installed two capital sized scrubber projects to improve air emissions in the plant. Also designed SPCC, Spill Prevention Containment & Countermeasure, project required by new state laws.

Controlled Assets: Implemented CMMS called E-Maintenance in order to track assets throughout the plant and their break downs. Effectively created PM schedules according to down time history. This helps to prevent future problems and accounts for substantial cost savings. Goal is to have more PM work orders and less repair work orders.

Project Manager at Municipal Mechanical Constructors Jan. 2005 –Jan. 2008

Rice, TX

Field Oriented Manager: Conducted field meetings to ensure the safety of the crew, quality of their work, and deadline requirements.

Design Manager: Approved blueprints and completed all of the take-off; a BOM would be generated from take-off.

Fluent User of Software: Used design software to adjust blueprints based on the take-off that I provided.

Consistent Project Manager: Consistently completed all tasks on time and under budget. Project sizes ranged from $500K to $35million.



Contact this candidate