Post Job Free

Resume

Sign in

Maintenance Engineering

Location:
Dayton, OH
Posted:
April 28, 2016

Contact this candidate

Resume:

RAJIV KUMAR GUPTA

E-mail: acuj5p@r.postjobfree.com, Tel.: 937-***-****, 937-***-****

Professional Summary

Seeking a career opportunity in Production/Maintenance. Currently have 28 years in the field of Production/Maintenance, with the most recent being with Ludhiana Beverages Pvt. Ltd, Ludhiana, a FBO of COCA-COLA as a Senior Production Manager. Efficiently carried out all the Production Operations and ensured the supply chain of all the required materials in various stages of production. Efficiently carried out all the maintenance activities for minimum breakdowns and maximum production output with optimum mechanical efficiency. Successfully implemented 5’S Concept on the shop floor and checked the quality of the raw materials for improving productivity and the reduced scrap. Proven skills in formulating and implementing new ideas and strategies for increasing production and increasing revenues. Strong leadership skills, excellent relationship management skills with proven ability to coordinate with diverse employees.

Professional Work History

Ludhiana Beverages Pvt. Ltd October 2002 – December 2015

Senior Production Manger

Managed maintenance activities including annual maintenance contracts, breakdown maintenance of all the equipment and preventing maintenance to ensure high 'Uptime'.

Increased plant efficiency from 65% to 78% and the mechanical efficiency from 75% to 90%; improved furnace oil yield from 65% to 90% and the carbon dioxide yield from 62% to 78%.

Planned, directed, coordinated and assigned manpower to meet the aggressive production schedules.

Assigned the appropriate maintenance & production engineers, supervisors, maintenance & electrical personnel & operators for the higher throughput and optimum 'Uptime'.

Managed and implemented the preventing maintenance program consisting of the equipment history, repair records and the assets log.

Maintenance of various machines like Bottle Washer, Fillers, Caser, Un-caser, CIP System, ETP, Paramix, Pasteurization system, Homogenizer, Boiler, EBI (Empty Bottle Inspection), Conveyors, Refrigeration, Air Compressors, Air Handling Units, Plate and tubular heat exchangers.

Managed and implemented the permits related to hot work, working in the confined spaces and working at the heights.

Managed and implemented the energy conservation program in the plant.

Maintained the fire-fighting equipment & the fire-fighting procedure/systems.

Played important role in implementation of systems like ISO 9001, ISO14001, FSSC 22000 and OHSAS 18001 & compliance with the global audits.

Indian Naval Service March 1987 – March 2002

Experience- 15 years’ experience in Mechanical/Marine Engineering, including 6.5 years at management level mentioned below:

Steam Turbine (15000 HP each )

Boilers (Babcock & Wilcox Water Tube, 147000lbs/hr

Turbo Alternators (750KW)

Various types of diesel engines

Hydraulic Equipment & Systems

Fire fighting equipment & systems

Distilling Plants (60 ton/day)

Various steam and motor driven pumps

Technical Experience

In charge of machinery trails team in MTU (KOL) at Garden Reach Shipbuilders & Engineering Ltd

Overseeing team (WOT) Kolkata at Garden Reach Shipbuilders & Engineering Ltd

In charge of the Engineering Department at warship

NHQ New Delhi/Directorate of system engineering

Administrative Experience

Carried out the duties of master chief regulator. Responsible for effective deployment of manpower, implementation of machinery maintenance techniques such as, planned preventive maintenance, condition based predictive maintenance and defect rectification of machinery of the optimum operational availability.

Liaison with the upper management, store depots, naval dockyard, civil repair authorities and equipment manufacturers/suppliers.

Added on the job training of new trainees on board and had experience about safety and security of the men and material.

Projects

Completed KINLEY Water project at LBPL Unit- II in four months in 2003

Upgraded the exiting line within a stipulated period of 2.5 months in 2007-2008

Upgraded the CSD line with new machinery filler, bottle washer, caser, crate washer from KHS and EBI and maaza line with new hilden filler, homogenizer, maaza pulp handling and juice preparation system from Tetra Pak, new conveyor within a stipulated period of 3.5 months in 2008-2009.

Education

Thapar Polytechnic- Patiala, Punjab, India 1983 - 1986

Associates in Mechanical Engineering- 1st class with Honors

Professional Training

Marine Engineering courses

Leadership Course

Management Course

Noise & Vibration Course

Basic Fire Fighting

Skills

Windows, MS-Office and Internet

Energy conservation

Natural resources

Steam system

OSHA

Fire Fighting system



Contact this candidate