Post Job Free

Resume

Sign in

Manager Engineer

Location:
Bolton, MA
Posted:
April 13, 2016

Contact this candidate

Resume:

Garrett Bingle (h):978-***-****

** ****** ******** **. (h): acucj0@r.postjobfree.com

Shirley, MA 01464

WORK EXPERIENCE

Gradiant Corp., Worburn, MA, 01801 April 2014- June 2015 Senior Designer

Integrating Gradiants water filtration equipment & plant design into the field with a small team.

Responsible for General Arrangements (GA’s), Process & Identification (P&ID’s) using Autocad14 & Solidworks 2015

Onsite visits in the field to check progress of build as well as to help solve any issues in the field

Implementation of EPDM Solidworks 2014/15

Writing requisitions to buy equipment needed for installs Thermo Energy Corp., (T.E.C.) Worcester, MA, 01606 Sept 2010- April 2014 Senior Designer

Working closely with Program Manager, Engineering Director & Plant Managers reporting on the installation of TEC’s equipment on long term assignment.

Responsible for BOMS, Assembly drawings & fit up issues using Solidworks 2013 Routing AutoCad14,

Development of Routing pipe fittings, Design Tables & templates in Soldworks 2013. New England Wood Pellet, Jaffery, NH 03452 Sept 2009- Sept 2010 Mechanical Designer

Working closely with owner and a small design team building a new plan facility to produce Premium Wood Pellets. This involves placement of large equipment and large CAD models using Solidworks 2009.

Responsible for assembly drawings and fit up issues as well as support to Program Manager and Plant Manager. Koch Membrane, Wilmington, MA 01887 March 2006-May 2009 Mechanical Designer

Interface with Project Managers, Controls Engineering, Product Development, and Systems Manufacturing on a variety of issues associated with industrial systems design.

Responsible for the completion of CAD models, detail drawings, Bills Of Materials (BOM’s) and Equipment Specifications for proposals and existing orders utilizing Solid Works and AutoCAD

Occasionally traveled to job sites for measurements and fit up issues. EggRock, Concord, MA 01742 Dec 2005-Feb 2006

Mechanical Designer ( Contractor )

Using Solidwork 2006 and working with another designer we develop a parts library and BOM (Bill Of Material) structure to improve quoting process.

Work closely with Production Floor Manager to create assembly drawing format that can be used easily on production floor. iRobot, Burlington, MA 01803 March 2005- Dec 2005

Mechanical Designer ( Contractor )

Sustaining G&I Industrial Robot division by Creating Assembly Models and Drawings to reflex building procedures and BOM (Bill Of Materials).

Work with other designers to help improve and understand better modeling practices in Solidworks so that ECO (Engineering Change Orders) can be implemented more efficiently as iRobot moves toward WindChill. GSI Lumonics, Wilmington, MA 01887 Aug 2004 – Dec 2004 Associate Manufacturing Engineer. ( Contractor )

Writing Work Instruction and Engineering Change Orders (ECO) for laser marking system.

Utilizing Solidworks, PDM Works, AutoCad, Oracle and BOM Markup (Bill of Material Markup Program unique to GSI Lumonics) to complete red lined drawing and BOM. (Bill of Material updates). CellTech Power, Westborough, MA 01581 June 2002 – Aug. 2004 Manufacturing Engineer/Designer

Using SolidWorks 2004 Work closely with CellTech Team to come up with new innovating designs of Solid Oxide Fuel Cell (SOFC) System designs while paying attention to manufacturing needs.

Design a new and innovating current collection system to remove electricity from system.

Using SolidWorks 2004 designed, built and implemented many new tools to speed the flow of manufacturing. Which include storage racks for our stack designs, Copper Crimping, Resistance welding holding fixture?

Designed a tube rolling & cutting device to increase our quality of ceramic tubes. This tool is used every day since it was built. Setra Systems Incorporated, Boxborough, MA 01719 June 2000 - June 2002 Manufacturing Engineer

Support Engineering with tooling and test data for existing and new products.

Produce new tool designs, drawings, and write Engineering Change Orders (ECO’s) and procedures.

Work closely with Quality Assurance on corrective actions with products.

Support Manufacturing floor with day to day issues. Lytron Incorporated, Woburn, MA June1996-June 2000 Mechanical Lab Technician/ Assistant Engineer

Set-up and select equipment for research and development tests of new and existing products.

Document tests plans, test conditions and results of tests.

Install and commissioned a variety of pump, heaters, flow meters, temperature devices and other test instrumentation.

Calibrate pressure and flow gauges, RTD’s, thermocouples, helium vacuum leak detectors and data acquisitions systems. Analytic Power Corporation, Boston, May 1992- June 1996 Mechanical Lab Technician

Built and plumbed test rigs for various fuel cell related experiments.

Performed test on experimental fuel cell and fuel cell auxiliary systems such as Proton Exchange Membrane (PEM) fuel cells, electrochemical pumps, linier motion free piston compressors, metal hydride-based hydrogen generators, and diesel fuel reformers.

Built and plumbed test rigs for various fuel cell related experiments. Education

Wentworth Institute of Technology Boston, MA; Continuing Education BDEM

Franklin Institute of Boston Boston, MA Part time 1985-1989 Full time 1990-1991, ASME1991

Electrical Journeyman 2 Winter 1995; Assabet Valley Vocational High School PROFESSIONAL ASSOCIATION, LICENSES, CERTIFICATES

Helium Spectrometer Leak Detector Certificate

Welding Certificate of accomplishment.

COMPUTER SKILLS

Familiar with AutoCAD, SolidWorks 2015, & EPDMSolidWorks, MS Office, Basic, Some acquisition software.



Contact this candidate