Husam Al-Droubi

** ********** **, *** *********, Texas, 77381, USA

Cell : ++1-469-***-****, email : acu7ge@r.postjobfree.com Linked In : https://www.linkedin.com/in/husam-al-droubi-05828889 Objective : To Assume responsibility on limited contract basis of service, mounting supervision and commissioning of major projects in the field of high availability solution in both ICT and real world processes, thermal power generation, combustion and waste heat recovery, Oil & Gas, Sugar & Yeast, Petrochemical/Bioprocess, GMP, process control and SCADA/DCS/BMS

- Senior Project Manager.

- Site Works Execution Manager. (C&I, Mechanical, Electrical, and process)

- Systems Design Manager (SIS, DCS, BMS and Electromechanical)

- Safety Instrumented Systems, ESD and safety systems.

- Heat generation and Heat recovery system

- Industrial Boiler and burner installation and rehabilitation including Air, Steam, flue gas and fuel sides.

- Process analytical sheds and systems, liquid and gas phase,

- Valve and metering skids.

- Control rooms and data centers

Education : BSEE, University of Texas at Arlington, USA - 1988 Professional Training and Expertise relevant to the post applied for :

- Project Management in accordance to PMBOK by the Professional Management Institute.

- Netware Certified Engineer

- Quality and Information Systems Internal Auditor: ISO 9000

- Process measurement instrumentations: Siemens & ABB

- Distributed Control System and safety system design and architecture: Siemens S7-416H

- Business Process : BPMN Ver.2

2 6

- Information System and SCADA Security : ISO 27001

- Data Centers and Control Rooms : TIA 942

- Human resource management: KPIs, task management, and by objective.

- Pharmaceutical Plant design according to GMP.

- Medium Voltage Distribution, Switch gear, transformers, and automation: ABB

- Food & Beverage Plant design and automation with specialty in the sugar & yeast process.

- Process analytical systems with process sampling, conditioning, and measurements kiosks, sheds, and environmentally controlled containers.

Experience :

- Saacke, GmbH ( www.saacke.com ) : Jan 2014 – Present : Independent contractor. Duties included mounting supervision, Factory Acceptance Testing, Commissioning for burners for heaters and Industrial boilers, including primary air system, fuel skids, fuel preparation and forwarding, auxiliary steam and related utilities.

- Souccar For Electronic Industries, Damascus, Syria (www.souccar.com) : 1992 – Sep. 2013, founding partner, held the position of Engineering Director, along with my partner we have watched it grow from a 2 person venture into a 120+ employee enterprise, active in Information Technology and Communication. And also in the field of Industrial/process control and Electrical Power. Besides my typical duties of technical management, I was also leading the research and design activities, and have also established the Project Management Office with its own operation system and staff, this office was offering the service of Project Management to the company’s project and to third parties as well.

- Compaq Computer Corporation, Houston, Texas : 1989 – 1991, hardware design engineer in the PC advanced technology design group, I was one of the designing team members to produce the first ever notebook style PC in the PC market, I was involved in microcontroller design and programming and flexible circuit technology.

- Network Access Corporation, Richardson, Texas : 1987 – 1989, hardware design engineer for telephony switching systems, SS7 service hardware platforms and memory cards for class 5 central office exchange, CSMA/CD protocol network cards, with specific focus on designing sentry system watchdog industrial PC expansion cards for monitoring and alarming for the above services, external physical variables, power, and communication lines. 3 6

Related Project Portfolio:

# Project Name and Brief Location and

Date of

commencement

Value

(USD)

In the capacity

Of

16 Yanbu Aramco Sinopec Refinery, YASREF

Hydrocracker Unit for Fractionator of

Petroleum Gas, Optimization of the

combustion system for the heater and the

drop out doors for optimal and safe

balanced draft operartion

KSA Maintenenance

and

commissioning

enigieer

15 Khartoum North Power Plant, 16x burner

replacement: replacement of 16 burners

with fuel skids, primary air, and auxiliaries in

2 boilers for production of electrical power

at total capacity of 200MW

Sudan

2014-2015

10M Mounting

Supervisor and

Site Manager

14 DNO oil fields at Zakho, Crude oil

combustion heaters installation and

commissioning for crude oil process heating

as initial treatment before export, with

rotary cup burners

Kurdistan

2014

22 M Commissioning

Engineer

13 Kirkuk power Plant, Gas turbine inlet cooling

by means of fogging, project included water

treatment by RO and MBDI, high pressure

pumping and fogging systems installation

and control

Iraq

2013

1.2 M Mounting

Supervisor and

commissioning

engineer

12 Aljafra Oil Field, DCS and shutdown system

for the water lift, water injection, gas lift,

and well head plant extending over 20 miles

from the river bank into the oil field, with

cause and effect and safety system.

Syria

2009-2010

1.8 M Project manager

11 Al-Shahba Yeast Factory, delivery,

installation, and commissioning of a dry

yeast vertical vacuum packaging machine

with capacity of 80 packs per minute (500

gr)

Syria

2009

800 K Project Manager

4 6

10 Al Ghab Sugar Company, Replacement of

control system and safety instrumented

system for the boiler house of 3 boilers

(40T/hr), and burners replacement including

DCS and SCADA.

Syria

2009-2011

4 M Site Supervisor

and field project

manager

9 Banias Refinery Corporation, Complete

Boiler rehabilitation including steam and

combustion side with Macchi (3 boilers @

230MW each). Water tube replacement,

burners, IDF&FD fans,BMS, and DCS.

2009 22M Project manager

8 Shabaa Yeast Factory, expansion and

automation of the plant from 32 Ton to 50

Ton per day of fresh bakers yeast, with

complete plat DCS upgrade and addition of

process equipment and waste water

treatment plant

2004-2006 9 M Work Package

Project manager

(DCS and

electrical system)

and liaison

officer

7 Daraa Flour Mill (200 Ton/day), complete

replacement and revamping of the electrical

power (cabling/switchgear) and control

system for the Mill running more than 500

motors, built around smart field devices and

switch gear with ASI and Profibus DP/FMS

protocols, DCS, and SCADA HMI

Daraa, Syria

2000-2002

1 M Project Manager

and Technical

Design

Consultant

6 General Fertilizer Company, DCS of the

Boiler House control System (2x100T/hr

with LPG burners) and burner management

system, liquefied air nitrogen production

plant, and Ammonia/Air mixing plant for

production of Ammonia-Urea fertilizer.

Homs, Syria,

2000-2001

800K Site Supervisor

and field project

manager

5 6

5 Tel Salhab Beet Sugar Factory(4000 Ton/Day),

complete boiler plant and sugar house

automation including beet reception, diffusion,

evaporation, crystallization, and drying. With

redundant online control system and analysis

of flue gas for O2, Co2 production for

carbonation, CO, and boiler steam and feed

water quality control system

Hama,

Syria,

1999-

2000

1.4 M Site Supervisor

and field project

manager

4 Deir Ezzor Beet Sugar Factory, (4000 Ton/Day)

automation and process control in the liming

and carbonation plant with online analysis of

pH, Baume, Brix, and turbidity values, along

with single loop controllers/PLC DCS and SCADA

interface. With motor control center, and

pneumatic controlled valves and actuators.

Dier Ezzor

– Syria,

1998

600 K Design and site

implementation

Manager

3 Al-Assad University Hospital (600 beds),

HMIS/RIS, with HR and administrative

application on turn key basis, including delivery

and networking of more that 300 workstations,

file servers, SAN, network topology and system,

with load sharing, IPS, and related data center

core and shel.

Damascus

Syria

4M

USD

Project Manager

2 Project Manager, FTTH network for Emaar

Eighth Gate project (www.emaar.com) covering

more than 1000 nodes expanding over 8

commercial buildings of 8 levels each, with

managed services, BMS, tenants billing,

security and life style.

2009 -

2010

3M

USD

Project manager

1 Control, Communication, and memory cards for

specialized applications in the telecomm

industry for watch dog monitoring, SS7

signaling, X.25 packet switching, A&D I/O and

control, security systems, VOIP, Industrial

communications

1988-

2008

10M

USD

total

Design Engineer

6 6

Personal Details :

- Dual Syrian / US Citizen, willing to travel extensively and to all areas of the world (including Hot zones in accordance to your guidelines), Arabic Mother Tong, Fluent in English, and can manage in French.

- None Smoker, Hobbies includes gardening, the outdoors, reading, and fine arts .

- No special health conditions, requirements, or reservation.

- Married with 4 children. Residing in Houston, Texas. References : Available upon request