Post Job Free

Resume

Sign in

structural superintendent/ foreman

Location:
Brunswick, GA
Salary:
flexible
Posted:
May 31, 2016

Contact this candidate

Resume:

*** ****** **. *********,** *****

acu1cl@r.postjobfree.com Cellular:912-***-****)

To Whom it may concern,

I am submitting the enclosed resume for consideration of a Superintendent/Foreman. My background has given me the hands on experience in all facets of infrastructure (heavy marine,dock, and bridges).Specializing in pile driving, form,& deck (D.O.T) building bridge/marine ports that would I believe contribute greatly to your company’s goals and objectives.

You will see after reviewing the enclosed resume, I have made numerous contributions to my present, and past employer/s that has benefited the bottom line .These accomplishments are derived from my strong interpersonal and communication skills, attention to detail, and unparalleled work ethic .A key talent that I can bring your company includes a practical approach to construction with a constant eye for controlling costs and finishing the project/s

under budget, without compromising safety, or diminishing quality .My reputation precedes me for listening and analyzing employee’s ideas and thoughts on creating a safe and productive work environment.

I am enthusiastic about exploring opportunities with your company and look forward to meeting/speaking with you .I will contact you in the next few days to answer any questions and schedule an interview at your convenience.

Thank you for your consideration.

Sincerely, Joshua Relihan

OBJECTIVE:

It is my professional commitment to diligently apply my previous work experience and education to meet the challenges of my everyday working environment. In addition, it is my personal ambition to continually expand and enhance my professional skills.

SUMMATION OF SKILLS:

§ Over 15 years Construction experience

§ Mobilizing in, and out

§ Equipment procurement, and set up

§ Pile Driving Experience

§ Concrete

§ Drill Shafts

§ Auger Cast

§ Pipe

§ H-Beam

§ Sheets (All types, and sizes)

§ Timber

§ Composite

§ Have experience in all facets of pile driving. From super heavy Bridge Foundation Pile, Coffer cells, Drill Shafts, to light Residential, foundation pile, and docks.

§ Structural, Decks, Diaphrams, overhangs, set up & operate Bidwell

§ Welding

§ Substructure

Columns

§ Caps

§ Bulkheads

§ Crane Rail Caps

M.S.E Wall

§ Form Systems

§ EFCO

§ Simmons

§ Hunnebeck Italia

§ Gang, Wood, Jahn and Gates

§ Decks (Conventional, P.T)

§ Tensioning Rod and Cable

EXPERIENCE: 5/14 - Present

Waterfront Marine

Substructure Superintendent

Project:Portsmouth Tunnel Project MLK Bridge (80M)

Responsibilities: ALL pile driving operations, Footers, Columns, Caps, Heavy Lifts(Setting Bulb T's)

Work plans, critical lift plans, standard lift plans, CLP's, Coding Time

Resp for equipment procurement, template design, hiring of personel

When I hired on they were two months behind schedule. I achieved pile production as the job was bid in two weeks. IN four weeks I quadrupled pile production as the job was bid(3 pile a day). I saved an estimated 35k my first month with the company on just equip rental alone. Three to Five crews (Up to 50 ppl), also managed subcomtractors

7/14/12 - 3/14

JCR Construction

Owner - Operator

Built residential docks, and Bulkheads/Sea Walls

Foundation pile ( i.e. Private homes e.t.c)

Balfour Beatty

Night Super

Project: Truman Parkway/Savannah,Georgia (160M) 03/2011 – 07/2012

Responsible for driving pile,advancement of work trestle,advancement of all false work

Supervision of multiple crews Carpenter, pile drivers, finishers e.t.c

Planning and coordination with subs and D.O.T

Coding time, Daily reports, e.t.c

Pours, Critical lift planning

Skanska – Tidewater 08/2008 – 12/10

Pile Driving Foreman

Project: Bridge Of Lions Replacement / Rehab, St. Augustine, Florida (76.8M)

Supervision of installation and removal of sheet pile for Coffer dams

Oversees 2 crews, day and night shift

Removal of all old drill shaft

Responsible for setting girders, critical lifts (plans)

Concrete pours

Timesheets, daily reports, e.t.c

Schedule projections

All wet work (off barges)

Archer Western Contractors 06/2008 – 08/2008

Pile Super(Set-up and Train key Personel)

Project: I-10 and I-195 Interchange, Jacksonville, Florida (157M)

Training of new pile foreman and crew

Supervise instillation and removal of sheet pile for coffer dams

Timesheets, daily reports, pile logs, e.t.c

Schedule projections

Fabrication of Templates for Test and Production Pile

Cantilever Templates and Conventional Templates; 2 and 3 stage

Planning and Coordination with Night Crew

Retaining and Replacement of Personnel

Supervision of installation of all test pile (PSC 24” x 110’, 120’)

Supervision of installation of all production pile.

All dry work.

American Bridge Company 01/2007 – 02/2008

Asst. Superintendent

Project: Dames Point Container Terminal, Jacksonville, Florida (12M)

Supervision of installation and removal of sheet pile for Coffer dams, and bulkhead (3,000 Linear Feet)

Oversaw multiple crews (carpenter, and pile drivers)

Concrete pours

Timesheets, daily reports, pile logs, e.t.c

Schedule projections

Fabrication of Templates for Test and Production Pile9

Planning, Coordination, and Supervision of Subcontractors

Retaining and Replacement of Personnel

Supervision of installation of all test, and production pile (438) (Pipe 30” x 81’)

Tensioning of tie rods for tie-back wall, forming and pouring cross-ties for crane rail, forming of cantilever wall, and bulkhead

Misener Marine Company 08/2005 – 01/2007

Pile Foreman

Project: Moran Towing Pier, Jacksonville, Florida (400K)

Oversaw multiple crews (carpenter, and pile drivers)

Concrete pours

Timesheets, daily reports, pile log, e.t.c

Schedule projections

Fabrication of Templates for Test and Production Pile

Used all floating jigs, All survey work

Planning and Coordination with Construction Manager

Retaining and Replacement of Personnel

Worked primarily on barges

Supervised all falsework, rebar placement, and forming for caps

Leard Huggins Inc.

Pile Foreman 5/2000 – 6/2002

Various Projects in Sav.Ga

Rincon,Ga Powerplant,Bay St. shoring,Myrtle Beach Outfall

Prep and set up for job,mobilize in and out of jobs

Coordinate with contractor and subcontractors

Recchi / GLF

Leadman/Foreman

Project: Sidney Lanier Bridge (Cable Stay) Brunswick, Georgia (121M)

8/1997 – 05/2000

Installation of Coffer dams

Set up and pouring of footers

Setting girders

Columns, Tower Legs, Hammerhead caps, Decks(Forming)

Set up and operate Bidwell

Hanging of iron in South Towers

Drove all piling for South Approach, footers and caps

Push and tension cable for stays

90% of work off barges

REFERENCES:

Bob Fitzgerald: Construction Manager, Misener Marine #954-***-****

Jeff Addison: Owner Coastal Foundations #912-***-****

Dan Williams MCM Marine Superintendent #321-***-****



Contact this candidate