RESUME
Position : Construction Supervisor & inspector
( Structure/Piping/Architecture/HVAC )
Name : Johari Isham bin Ismail
Date of birth : 29 may 1967
Age : 48 years
I/C No : 670***-**-****
Nationality : Malaysian
Sex : Male
Status : Married
Qualification : Sijil Pelajaran Malaysia
Address : No 15, Jalan Bayu 23,
Bandar Seri Alam,
81750 Masai, Johor,
Malaysia
Contact no/ email : +601*-******* (Malaysia ) / 1-300-***-**** (China )
acu0ta@r.postjobfree.com
Spoken and writing : Bahasa Malaysia ( Malay ) and English
Training / Seminar attended
1985 Architecture Engineering at Federal Institute of Technology
1987ASNT Level 11 for MPI,DPI at Sime Darby Engineering
1987Corrosion protection conducted by Berger Paint
1988Welding Inspection course conducted by Sime Darby Eng.
1992Leadership & human relation skills conducted by
Malaysian Employers Federation
1993Blasting & Painting conducted by Promet Fabricator
Synopsis
With more than 25 year supervision and inspection experience for Jacket, topside, living quarter, FPSO, Barge, chemical and LNG plant, oil terminal for client such as PETRONAS, Shell, Exxon, Modec, Petro Vietnam on Project in Malaysia, Singapore, Turkmenistan,Vietnam and China.
Working Experience
Date : Nov 2014 – Present
Company : Seconded to BV China ( Know as YAMGAZ )
Position : Quality Lead ( Structure )
Project involved : Yamal LNG
-Review WPS and contractor QC personal resume submit by
contractor and make any comment
-involved in Pre inspection meeting (PIM ) to ensure contractor
-understand the work procedure and ITP before start the activity.
-Review method of statement that related with QC activity.
--Prepare weekly inspection KPI and submit to head of department
and Yard Manager
-Liaising with client representative for any Quality issue.
-Advise contractor any quality issue
-Monitor NDT inspection carried out by contractor.
-Daily monitor site activity and progress to ensure all activity
follow the procedure and specification also schedule
--Involved in Quality walk trough to ensure all approved document
and latest revision used by contractor
-To inform the Qc Coordinator any site issues.
-Monitor and advise any unsafe activity or condition and ensure
-Monitor all NCR and punch list closed.
-Carried out Fit up, Visual inspection and witness Dimensional
check.
-To prepare daily activity for all inspector and submit to
coordinator and BV manager also make arrangement inspector
work area
-Review report and complied for final documentation.
Date : Mac 2014 – Nov 2014
Company : Frontken Malaysia SDN BHD
Position : Piping Superintendence
Project involved : Tanjung Bin Oil Terminal Phase 2
-Involved in piping and tank construction supervision activity
-Review all drawing and liaise with engineering department
if there is any variation between ISO and P&ID
-Liaise with sub contractor regarding with drawing received or
any engineering issue.
-Monitor all drawing issue by engineering as per planning.
-Site condition prior to start construction activities, verify
the condition and area as per design.
-Liaise with material department about the receiving of material
and incoming material as per MTO Liaising with construction
manager any shortage of material that will effected the work
progress.
-Review Sub contractor method of statement (MOS ) and make
any comment before submit to client for approval.
-Administer construction activities, ensuring all piping scope of works are achieved in accordance with the contract requirements and timeframe, and in compliance with client’s specifications and established standards.
-Identify any potential or actual slippages and discuss with the
project Manager
-Liaises with other disciplines to ensure the optimum interface of the various operational activities.
-Prepare daily and weekly progress and manpower report and
submit to construction manager, project manager and client.
-Liaising with Project engineer and prepare recovering schedule
and catch up plan accordance from material receiving, manpower
also facilities at site.
-Liaising with QC inspector and client inspector any quality issue
-Liaising with client Project Manager to get clearance for any
activity at Brownfield area.
-Give input to construction manager any budget issue.
-Attended weekly progress meeting with client.
-Attended safety management meeting.
-Involved in Safety Planning meeting ( SPM )
-Project Authorize PTW
-Observing site safety practices and report any concern.
-To ensure all reporting in order and have been approved.
Date : August 2013 – Jan 2014
Company : Rina Services Mumbai
Position : 3rd Party Inspector
Project involved : Heera RD Phase 2 pipeline
Duties and responsibilities
-Review and make a comment on manufacture quality plan.
-Monitor contractor production activity to ensure as per specification and client requirement.
-Carried out inspection activity
-Liaising with contractor any non conformance issue
-Review and verified inspection report.
-Prepare daily report for project manager.
Date : Oct 2011 – Oct 2012 ( completed contract )
Company : Bien Dong Petroleum Operation Company ( Petro Vietnam )
( Client Rep)
Position : Construction supervisor/inspector (Architecture/Hvac )
Project involved : Biendong POC Project PQP ( LQ ) And HT Module
Duties and responsibilities
HVAC
-Resolving all problems arises due to design changes and
coordinate with field design engineers and when necessary.
Carried out incoming material inspection and advice material
controller any unsatisfactory issue
-Monitor main contractor daily progress and planning schedule.
-to record daily activity, manpower and report to Construction
manager to ensure all activity follow the planning and advice contractor
any activity behind schedule.
-Carried out leak test for refrigeration pipe and smoke test for
ducting to ensure the quality of the jointing.
-Carried out line check for ducting install as per drawing and
specification
-Daily monitoring to ensure contractors perform all works
according to specification and requirements
-Monitor and advise any unsafe activity or condition.
-Liaise with QC inspector any inspection activity
and follow up any comment by commissioning team.
-Review reporting and approved final documentation before handover to commission team.
Architecture
-Review and comment contractor Inspection Test Plan ( ITP )
before approval.
-Review drawing and make a comment before approve for
construction ( AFC )
-Advised contractor any drawing issue eg.new revision.
-Advised procurement team the requirement of material to be order/
-carried out material inspection to ensure all incoming material
as per specification and requirement before approve.
-Review and advised superior for any site technical query.
-Monitor all projects construction works to meet the schedule and
procedures
-Assist contractor in construction issue eg wall panel, flooring,
tiling, ceiling.
-Recorded daily man power and report to construction Manager.
-monitor quality of work and advise any site change
-Daily Coordination Meeting with main contractor for smooth executing of works progress, quality and safety.
-Liaise with QC inspector any inspection activity
-Daily monitor and advise any unsafe activity or condition
-Check all plumbing system and insulation in Living Quarter as per latest
drawing and follow specification
-Check and verified all equipment and signage install as per drawing
-Reported to construction manager all daily and weekly progress.
-Advices contractor to speed up the work to catch the planning
any behind schedule job.
-Support QA/QC Engineer any Quality Issue included structure
and piping discipline.
-verified any close up punch list and outstanding activity before
handover to commissioning team and to follow up any comment
raise by commissioning team
-Review reporting and final documentation
Date : Mac 2009-Aug 2011 ( completed contract )
Company : Malaysia Marine Heavy Engineering Turkmenistan
Position : Construction Supervisor (Structure/Architecture/HVAC )
Project Involved : MAGTYMGULY RISER PLATFORM-A (MCR-A)
TURKMENISTAN BLOCK 1 ( Jacket and Topside )
Client : PETRONAS CARIGALI TURKMENISTAN SDN BHD
Duties and responsibility
-Liaising with Engineering Department regarding all engineering
issued.
-Monitor AFC ( Approve for construction ) and outstanding
drawing issued for site team.
-Resolved all problems arises due to design changes and
liaising with client representative for any change order or
variation order.
-liaising with material control for dispatching construction
material to site area and ensure materials are delivered to site on
time and quantity delivered is accurate.
-Liaising with procurement and engineering department any
material issued.
-Site monitoring to ensure all work activity according to specification and requirements.
-Monitor daily progress as per plan, daily man power and report to construction Manager.
-Request all facilities required at site during work activity also
monitor consumable.
-Verified and approved permit to work.
-To inform the construction manager any issue encounter at site and
make a proposal to minimize the cost impact
-Monitor and advise any unsafe activity or condition
-Involved in Emergency Rescue Team.
-Liaising with QC department any quality issue and inspection.
-Ensure all NCR and punch list closed before MCD.
-Supervised all weighing and load out activity and liaise with construction
Manager any facilities/manpower required.
- To ensure the safety condition during load out.
-supervised and monitor tie down activity and ensure all support
Install as per drawing..
-Conduct visits and inspection a newly building structure
complied with client requirement and safety regulation.
-Perform final inspection for camp to ensure all finishing and equipment meet client requirement and drawing.
- To prepare and assist in progress claims and taking off process
- Liaise with QC department for inspection and final documentation.
Other responsibilities
-Involved in safety walk about and make a comment any
-unsaved condition and activities
-Involved in Emergency rescue team
-Supervised civil construction on road construction
Date : Sept-nov 2006 ( Completed Contract )
Company : Seconded to Modec international LLC Singapore
( client rep ) at Jurung Shipyard Singapore
Position : Piping Inspector
Project Involved : MODEC LLC FPSO
Duties and responsibility
-Witness main contractor inspection on piping activities.
(fit-up, visual, line check, hydro test)
-Review of test package prior hydro test.
-To ensure all inspection and NDT ( if required ) was carried out
before hydro test
-Drafting weld mapping fill in necessary requirement for each
-ISO drawing prior to specification.
-Drafting and controlling of as built isometric for test
package as per site condition.
-Supervised and compilation of piping test package according
to test limit.
-Monitor work progress and reporting to Project Manager.
make a redline mark up any site change and send to engineering for as built.
-Raise NCR any activity not as per specification.
-Documentation control.
Date : 1998 to 2006 ( completed contract )
Company : Sime Darby Engineering Pasir Gudang ( Main contractor )
Position : Supervisor and Inspector ( Structure/Piping/ Architectural )
Project Involved :MODEC LLC FPSO
Client :Modec International
Project Involved :Bunga Raya ‘E’ Topside/Living Quarter
Client :Talisman Malaysia Limited
Project Involved :MODEC BAOBAB Field Development Project.
Client :Modec International
Project Involved :B11 DRA Topside.
Client :Sarawak Shell Berhad
Project Involved :Angsi ‘C’ and ‘E’ Jacket and topside
Client :Petronas Carigali Sdn Bhd
Project Involved :Angsi ‘B’ topside
Client :Petronas Carigali Sdn Bhd
Project Involved :Angsi ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd
Project Involved :RDP-A and RCPP Jacket
Client :Petronas Carigali Sdn Bhd
July 1993-Mei 1998 :Promet Fabricator Sdn Bhd ( Main contractor )
Position : Supervisor and Inspector ( Structure/Piping/ Architectural )
Project Involved :Tapis ‘E’ topside
Client :Esso Production Malaysia Inc.
Project Involved :Sotong ‘A’ Jacket and Topside
Client :Petronas Carigali Sdn Bhd
Project Involved :Eastman Chemical Copolymer Plant
Client :Foster Wheeler
Project Involved :Fabrication new barge
Client :President Marine
Project Involved :Semco Gaint III ( fabrication jacket fendering system)
Client :SAIPEM
Project Involved :Lawit ‘A’ Topside
Client :Esso Production Malaysia Inc.
Project Involved :Calm buoy
Client :Petronas Pernapisan Sdn Bhd
Project Involved :Guntong ‘D’- 168 Man Living Quarter
Client :Esso Production Malaysia Inc
Project Involved :D35-QA Living Quarter and Module Support Frame
D35 Telecom tower
D35-ra Riser Platform and Bridge
Client :Sarawak Shell Berhad
Dec 1989-Mei 1993 :Malaysia Shipyard And Engineering Sdn Bhd
( Malaysia Marine Heavy Engineering )
( Main contractor )
Position :Structure/ Architecture Supervisor/QC
Project Involved :Bardegg Topside And Living Quarters
Client :Petronas Carigali Sdn Bhd.
Project Involved :BDO 6 Megaskid Topside
Client :Petronas Carigali Sdn Bhd
Project Involved :Baronia I and J Jacket
Client :Petronas Carigali Sdn Bhd
Project Involved :Dulang ‘D’ Topside
Client :Petronas Carigali Sdn Bhd
Dec 1986-Nov 1989 :Sime Sembawang Engineering Sdn Bhd
( Sime Darby Sdn Bhd )
( Main contractor )
Position :Structure/ Piping QC
Project Involved :Dulang ‘A’ and ‘B’ Jacket
Client :Petronas Carigali Sdn Bhd
Project Involved :Palas ‘A’ Gas Injection Module
Client :Petronas Carigali Sdn Bhd
Project Involved :Seligi ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
Project Involved :Guntung ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
QC Duties and responsibilities
-Monitor welding consumable issued and recorded
-monitor and verified all backing and holding activities and recorded
-To ensure all equipment used at site calibrated.
-In charge and carried out inspection for welder qualification
-Test and welding procedure qualification test.
-Prepare and updated weld summary and remind contractor any
outstanding inspection.
-Monitor daily activities followed specification and requirement.
-Carried out material verification,fit-up and visual inspection.
-Witness slump and cube test for grouting. ( for architecture )
-carried out insulation, flooring, wall panel, ceiling inspection
and liaising with client and engineering any architecture issue.
-Attended progress meeting with client and raised any quality issue
-Monitor welder performance
-Liaise and make a request to NDT department.
-Liaising with client rep for any change order or variation order
-Carried out line check for piping and ensure as per drawing.
-Raised red line mark up to engineering any site change.
-Complied test pack for piping and ensure all document completed
before submit to client for approval before hydrotest.
-Monitor and verified hydrotest and flushing activities and
documented.
-Raise NCR any activity not as per specification.
-To ensure all punch list completed before MCD
-Monitor and carried out inspection Galvanizing activity.
-Final documentation.
Supervisor Duties and responsibilities
-Liaising with Engineering Department regarding all engineering
issued.
-Monitor AFC ( Approve for construction ) and outstanding
drawing issued for site team.
-To liaise with the Project Manager on the proper implementation and execution of works to ensure that all works including those executed by sub-contractors are in accordance with the drawings, specifications and conditions in the main contract
-To plan in advance all site activities and the proper execution
-Resolved all problems arises due to design changes and
liaising with client representative for any change order or variation order.
-liaising with material control for dispatching construction material to site area.
-Liaising with procurement and engineering department any material issued.
-Site monitoring to ensure all work activity according to specification and requirements.
-Request all facilities and consumable required at site during work activity
-Verified and approved permit to work.
-monitor and advise any unsafe activity or condition
-Liaising with QC department any quality issue and inspection.
-To ensure all NCR/ punch list closed before MCD.
-Supervised all load out activity such as installation of skid way.
-To ensure the safety condition during load out.
-Supervised and monitor tie down activity.
-Liaise with QC department for final documentation.
Sept 1986-Nov 1986 :Consultant Inspection Testing Services
Position :Assistant QC Inspector
Project Involved :Guntung ‘B’and ‘C’- Jacket and Cap
Client :Esso Production Malaysia Inc
-Prepare weld summary and update
-Assisting inspector to witness PWHT
-Assisting inspector to witness welding procedure
-and welder qualification test (WQT&WPQT)
-Assisting inspector to carried out incoming material
-Inspection, material verification inspection, fit-up and visual
Inspection.
-Carried out daily monitoring to ensured all work followed
-Specification and requirement.
-Raise NCR any activity not as per specification.
-Prepare inspection report