CURRICULUM VITAE

PERSONAL DETAILS

Name : Busril

Permanent Address : Jalan Kopi II no 4, Alai Parak Kopi, Padang

Mobile Telephone No : +62-813-****-****

Home Phone : +62-751-*******

Email address : acu0rn@r.postjobfree.com

Education : Intermediate Technical School

Position : Testing/Piping Supervisor

Place and Date of Birth : Koto Merapak 10, Januari, 1972

Nationality : Indonesian

Passport No : A.7983299

CAREER SUMMARY

A thorough and professional Testing Supervisor/Piping Supervisor / Piping Inspector Pre commissioning and Process Commissioning Supervisor with a total of Twenty two (22) years comprehensive training and experience while working for dominant companies involved in major projects of Oil & Gas Refineries, Turnaround & Revamp, Petrochemical Plant Industries / Offshore and FPSO Conversion project, topside construction platform, shipyard in Batam Indonesia. Offers an outstanding performance and safety records combined with reliability and dependability. Successfully supervised and inspection and brings notable ethics and pride to every job. Having served as piping, Structural, Pressure Vessel supervisor, welding / piping inspector, test packages supervisor, piping, Piping foreman.(craft).The field Acquired skills such as project management team, planning, supervising, quality control, implementing various task assigned. Knowledgeable of site fabrication activities, pre-commissioning and commissioning, document control and test package preparation, punch listing, as-built and mechanical completions. Experience in site Inspection ( Oil Refenery ) and fabrication construction since 2003. Familiarwith code and standard such as ASME, ANSI, AWS and API. Able to work as a teamwork.Primary function of the job perform the site inspection and follow up activities of applicable to welding and fabrication activity. Follow up the quality control measure applicable to welding as per job requirements. Witnesses the preparatory activities for the welder qualifier test and welding procedures.

SPECIALIST

Piping Inspector, Piping Supervisor, Testing Supervisor, Pressure Vessel,Pre Commissioning, Process Commissioning, Quality Control, Ship Building, Mechanical Inspector,HydroTestingt,Pneumatic Testing,Blowdry,Hydrojetting,and Boroscope.

TRAINING & CERTIFICATES

Certificate of Safety Recognition without a LTI of BECHTEL APLNG Module Yard.

Certificate of Completion Grip Tight plug GT Plug by CURTISS WRIGHT of Bechtel Corp.

Certificate Star Award of APLNG Module yard Project By Mr,Bruce Sullivan (Site Manager)

Certificate Bechtel Safety Leadership Workshop with 3day Trainning

Internal Trainning Management Orientation By Mc Dermott Indonesia

Trainning Quality Control with Conoco Philips at Mc Dermott Indonesia

Certficate of the Best CPP Platong Gas II Project Chevron Mc Dermott Indonesia

Certificate Trainning of Perfomance Authority by Connoco Philips North Belut Project at Mc Dermott

Certificate of Appreciation by KBR and Root Belanak FPSO Project at Mc Dermott indonesia

Pneumatic Testing Team (Pre-Assembly Duration: Oct.2005 until May.2007 with Certificate) Foster Wheeler Woodside

Certificate of Training Head Environmental safety (HES) by CALTEX Pacific Indonesia

Certificate of Trainning Basic Rigging from Mc Dermott Indonesia

Certificate Trainning Advance Rigger From Australia Skill Trainning (AST)

Certificate of TrainingWelding Inspector, Research for Development of material and Technical Product (B4T) Bandung. Indonesia Welding Society (IWS) Batam

Certificate Number WI: 1204.12-7

Certificate Number IWS: 345.1204

Certificate of Completion Welding Inspector (Offshore Technology Institute) of Batam

Certificate of Completion (Pipeline Engineering,Construction and Inspection) of Batam

WORKING EXPERIENCE

1.Position : Piping Supervisor

Inclusive : March 21th 2015 until 30 November 2015

Company : PT Air Energy Indonesia

Location : Exxon Mobile Cepu Limited, Tripatra Samsung Indonesia

Project : Banyu Urip Project Exxon Mobile Cepu Limited {EPC 1}Bojonegoro East Java Indonesia

To ensure test package to testing,hydrotest,pneumatic test,blowing, boroscope,and re-instatement.

To ensure after post complete package by construction erection to testing.

Comunication with Welding Engineering,Engineering team and Quality Control to make sure status test package ready to testing,supervise fabrication and erection of pipe spools and pipe supports according to the latest issued construction drawings

To conduct site surveys with sub-contractors engineering group; to propose new routes and locations for expansion of facilities where interference occurred

To ensure that all site activities are performed in environmentally safe and responsible manner

To conduct weekly HSE assessments and safety walk through, as well as safe and unsafe auditing

To coordinate among various construction sub-contractors and discipline supervisors the execution of piping work and verify the availability and adequacy of the materials and drawings

To verify engineering queries from sub-contractors at site and proposals, including to give recommendations

To coordinate the construction sub-contractors ensuring the compliance with the applicable specification and standard.

To evaluate the construction sub-contractors work capability according to the programs that have to be implemented and promote corrective action where necessary

To ensure the proper execution of inspection and test in accordance with the field quality control plan and monitor the adequacy result.

2.Position : Testing/Piping Supervisor

Inclusive : September 26th 2013 until September 30th 2014

Company : PTBechtel Corp Indonesia

Location : Smoe Indonesia Industrial Park Kabil Batam Indonesia

Project : APLNG Module Yard OSBL,ISBL,CRYO and Propane II.

Duties and Responsibilities

Piping Supervisor

To ensure test package to testing,hydrotest,pneumatic test,blowing,and boroscope,and re-instatement.

To ensure after post complete package by construction erection to testing.

Comunication with Welding Engineering,Engineering team and Quality Control to make sure status test package ready to testing,supervise fabrication and erection of pipe spools and pipe supports according to the latest issued construction drawings

To conduct site surveys with sub-contractors engineering group; to propose new routes and locations for expansion of facilities where interference occurred

To ensure that all site activities are performed in environmentally safe and responsible manner

To conduct weekly HSE assessments and safety walk through, as well as safe and unsafe auditing

To coordinate among various construction sub-contractors and discipline supervisors the execution of piping work and verify the availability and adequacy of the materials and drawings

To verify engineering queries from sub-contractors at site and proposals, including to give recommendations

To coordinate the construction sub-contractors ensuring the compliance with the applicable specification and standard.

To evaluate the construction sub-contractors work capability according to the programs that have to be implemented and promote corrective action where necessary

To ensure the proper execution of inspection and test in accordance with the field quality control plan and monitor the adequacy result.

3.Position : Piping and Mechanical Inspector as Client Representative

Inclusive : October 25th 2012 until July 20th 2013

Company : MISC Berhad Malaysia

Location : MMHE ( Malaysia Marine and Heavy Engineering)

Project : FPSO PhaseII Cendor Project

Duties and Responsibilities

Piping and Mechanical inspector

Verifying Welding, Construction, & NDE Procedures comply with clients Specification or Code and Standard.

Related and working to a Quality Control System.

Material Inspection.

Witness/ verify welders qualification test.

Inspection & monitoring cutting beveling, alignment for fit-up preparation.

Visual Inspection.

Line check/ punch list check as per Test Package.

Monitor testing and verify re-instatement of piping component after Hydrostatic Test To organize the preparation of piping systems for testing based on the test pack limits specified in the approved test packs

To prepare a test package as per piping system and test package priority schedule –

To attend final walkthrough of completed piping systems and verify clearing of all punch list prior to mechanical completion

To attend coordination meetings with client representatives, site manager and project management team; to assist on all commissioning activities

4.Position : Piping Supervisor

Inclusive : Juny 18th,2012 until October 15th 09th 2012

Company : PT Saipem Indonesia

Location : ENI Karimun Yard Indonesia

Project : Iraq Project PlatForm and Jacket.

Duties & Responsibilities

Piping Supervisor and Testing

Review plans and drawings in accordance with specifications, codes and standards.

Conduct activities and inspection in accordance to Project Quality Assurance Manual and Quality Control Inspection Plan.

Identify quality problems, reject non-conforming items and initiate, recommend or provide solutions to the problems

Check and approve test package and document To monitor the progress with schedules and updating to lead construction engineer

To make daily man-hour consume by sub-contractor and estimate the modification activities including additional works; to assure the conformance of budget installation

To organize the preparation of piping systems for testing based on the test pack limits specified in the approved test packs

To prepare a test package as per piping system and test package priority schedule -

To attend final walkthrough of completed piping systems and verify clearing of all punch list prior to mechanical completion

5.Position : Piping Supervisor

Inclusive : November 07th 2009 up to February 09th 2011

Company : PT. Mc Dermott Indonesia

Location : Mc Dermott Yard Batam Indonesia

Project : CPP Deck Chevron Platong Gas II And Living Quarted Of Thailand :

Duties and Responsibilities

Piping Supervisor

Respect and apply HSE rules, to Mechanical Inspector responsible for the Equipment, Piping, Structural, Painting, E/I assign.

Ensure all Equipment as per drawing and Material are strictly complying with code, standards and client specification.

To check MCR, all Material,make sure all line check is completed

Make Punch list to Line and Equipment

To check the All document suck as approved Material Procedure Specification, Procedure Qualification Record and check all information for all variable and range of approval for that procedure.

To check the variable for Equipment certificate and position limits and the history.

To check and monitor the joint Valve preparation suck as per requirement As per P& ID.

Report to Mechanical Manager and Signed by Client To organize the preparation of piping systems for testing based on the test pack limits specified in the approved test packs

To prepare a test package as per piping system and test package priority schedule –

To attend final walkthrough of completed piping systems and verify clearing of all punch list prior to mechanical completion

To attend coordination meetings with client representatives, site manager and project management team; to assist on all commissioning activities

6.Position : Piping Supervisor

Inclusive : January 26th 2006 until April 02th 2009

Company : PT Mc Dermott Indonesia

Location : Mc Dermott Yard Indonesia Batam

Project : Arthit CPP Deck Platform of Thailand and SuTuVang CPP Deck Platform Project with CuLong Thailand Project

Duties and Responsibility

Piping Supervisor

Coordination and development of pipe fabrication, planning, design and scheduling to assure compliance with technical specification and schedule requirement.. Organization and coordination of the yard space, manpower, equipment, material and consumable that will be required for fabrication work.

Supervision of the fabrication of pipe and installation work to assure that compliance with technical requirement (specification or technical spec) and safety requirement

Conduct pressure test package together with surveyor.. Monitoring of shop drawing, fabrication and detail drawing (General arrangement drawing, P- plan drawing and Isometric Drawing (Spool drawing) according with project requirement.. Lease with Client for any revise or changing for fabrication drawing. Mechanical installation / equipment installation.

Reporting to Piping Section Head (Manager) for job progress.

Respect and apply HSE rules, to assist the Certifying responsible for the piping inspection, and installation of piping system.

Assign ensure all Pipe line correctly as per drawing are strictly comply with code and standards specification.

To check the Pipe line document suck as approved Operational Test Procedure

Qualification Record and check all information for all variable and range of approval for that procedure.

To check the variable for Installation piping and position limits and the history of employment to avoid time laps.

To check and monitor the piping line preparation for Leak Test and also the jig and fixtures for distortion control.

To check the condition of Pump Equipment Vessel and condition of piping and ensure all connection is correct.

To check the material size, dimension, pipes rout as per isometric drawing, collect the data and result and submit to higher authorities.

Involve in supervision of hydro testing and pneumatic testing and flushing activities To organize the preparation of piping systems for testing based on the test pack limits specified in the approved test packs

To prepare a test package as per piping system and test package priority schedule –

To attend final walkthrough of completed piping systems and verify clearing of all punch list prior to mechanical completion

To attend coordination meetings with client representatives, site manager and project management team; to assist on all commissioning activities

7.Position : Piping Foreman

Inclusive : Juny 01th 2005 until November 01th 2005

Company : Richcall Engineering Sdh.Bhd.Malaysia

Location : Sime Darby EngineeringSdn.Bhd yard

Project : Bunga Raya E Co 2 Removal Plat form Topside of Malaysia

Duties & Responsibilities

Piping Supervisor Erection /Hydrotest

Subcontractors, according to predetermined production schedules and priorities.

Review Piping Conduct the actual material inspection to determine over, shortage & damaged materials before distributing to respective subcontractors.

Compiles and maintains material status information to expedite movement of piping material between production areas and Isometric Drawing (Bill of Materials, Take-Off,), production schedules and work orders to determine type and quantity of materials required availability and priority.

Make report on the actual quantity of materials that arrive on site which will be forwarded to our main office for their reference.

Keep the spare materials in our warehouse and distribute to subcontractors upon request.

Support other Piping Engineers/Supervisors for various activities required for smooth completion of jobs.

Issue various progr ess reports.

Manpower, equipment and material planning for cleaning, gauging, pneumatic testing, drying and leak testing.

8.Position : Piping Supervisor

Inclusive : March 29th2003 until September 26th 2004

Company : PT Mc Dermott Indonesia

Location : Mc Dermott Yard Batam Indonesia

Project : Belanak Natuna FPSO Module PT.Conoco Philips Indonesia

Duties & Responsibilities

Piping Supervisor Erection /Hydro test

Conduct the actual material inspection to determine over, shortage & damaged materials before distributing

Compiles and maintains material status information to expedite movement of piping material between production areas and subcontractors, according to predetermined production schedules and priorities.

Review Piping Isometric Drawing (Bill of Materials, Take-Off,), production schedules and work orders to determine type and quantity of materials required availability and priority.

Make report on the actual quantity of materials that arrive on site which will be forwarded to our main office for their reference. .

Coordinate with Work permit Controller and apply for a Lockout/Tag out (LOTO) permit for the respective system/equipment to work on

Provide the Work Permit Controller with all pertinent information regarding the work activities to be accomplished under the LOTO. To organize the preparation of piping systems for testing based on the test pack limits specified in the approved test packs

To prepare a test package as per piping system and test package priority schedule –

To attend final walkthrough of completed piping systems and verify clearing of all punch list prior to mechanical completion

To attend coordination meetings with client representatives, site manager and project management team; to assist on all commissioning activities

9.Position : Piping Supervisor

Inclusive : October 17th until January 17th 2003

Company : PT Timas Suplindo Engneering

Location : PT Riau Andalan Pulp&Paper (RAPP) Pangkalan Kerinci Riau

Project : PT Riau Andalan Pulp & Paper Indonesia

Duties & Responsibilities

PipingTechnician

Erection pipe spool and pipe support,hydrotest,pretest,leaktest,chemical

Test, nitrogent test, precommisioning, re-instatement spool, punch list, line walk

Inspection before and after with client to clearance

10.Position : Piping Technician

Inclusive : November 25th 2001 until September 25th 2002

Company : PT Thiess Contractor Indonesia

Location : Area 10 Duri Riau Indonesia

Project : PT.Caltex Pacific Indonesia

Duties & Responsibilities

Piping Technician

Coordination and development of pipe fabrication, planning, design and scheduling to assure compliance with technical specification and schedule requirement.. Organization and coordination of the yard space, manpower, equipment, material and consumable that will be required for fabrication work.

Supervision of the fabrication of pipe and installation work to assure that compliance with technical requirement (specification or technical spec) and safety requirement

Conduct pressure test package together with surveyor.. Monitoring of shop drawing, fabrication and detail drawing (General arrangement drawing, P- plan drawing and Isometric Drawing (Spool drawing) according with project requirement.. Lease with Client for any revise or changing for fabrication drawing.

Mechanical installation / equipment installation.

Reporting to Piping Section Head (Manager) for job progress.

11.Position : Piping Foreman

Inclusive : July 20th 2001 until November 20th 2001

Company : PT.Taikisha Engineering Indonesia

Location : Kawasan Industri EJIP Lot 36 Lemah Abang Cikarang Bekasi West Java Indonesia

Project : PT Display Devices Indonesia Jakarta

Duties & Responsibilities

Piping Foreman / Testing

Manpower, equipment and material planning for temporary piping, cleaning, gauging, pneumatic testing, drying and leak testing.

Preparation of test package, planning and execution of preparatory activities. Conduct line checking prior to pneumatic testing.

Prepares ISO drawing and Material Take-off for temporary line.

Checking pneumatic test equipments and instruments.

Preparation / review of Procedures for cleaning, gauging, drying and leak testing.

Execution and supervision of pneumatic testing, air blowing, water flushing, oil flushing and gross leak testing.

Coordinate with QC and HSE team for quality and HSE measures.

Prepare reports for client submission.

Coordinate with Work permit Controller and apply for a Lockout/Tag out (LOTO) permit for the respective system/equipment to work on.

Provide the Work Permit Controller with all pertinent information regarding the work activities to be accomplished under the LOTO.

Fully understanding the work to be done and identifying the exact plant or apparatus to work on.

Review the system/equipment isolation and the placement Lead and supervise a group of pre-commissioning worke

Preparation of test package, planning and execution of preparatory activities. Conduct line checking prior to pneumatic testing.

Prepares ISO drawing and Material Take-off for temporary line.

Checking pneumatic test equipments and instruments.

Preparation / review of Procedures for cleaning, gauging, drying and leak testing.

Execution and supervision of pneumatic testing, air blowing, water flushing, oil flushing and gross leak testing.

Coordinate with QC and HSE team for quality and HSE measure

12.Position : Piping Foreman

Inclusive : May 05th 2001 until July 10th 2001

Company : PT.Mantra Sakti Bersatu

Location : Kawasan Industri Jababeka Bekasi West Java Indonesia

Project : PT. Fuch Oil Indonesia

Duties & Responsibilities

Piping Techician

Conduct the actual material inspection to determine over, shortage & damaged materials before distributing to respective subcontractors.

Compiles and maintains material status information to expedite movement of piping material between production areas and subcontractors, according to predetermined production schedules and priorities.

Review Piping Isometric Drawing (Bill of Materials, Take-Off,), production schedules and work orders to determine type and quantity of materials required availability and priority.

Make report on the actual quantity of materials that arrive on site which will be forwarded to our main office

13.Position : Piping Foreman

Inclusive : October 20th,1999 until June 07th 2000

Company : PT.Truba Jurong Engineering Indonesia

Location : North Duri Co GenerationPower Plant Project Job T-6041 /T-4052

Project : PT.Caltex Pacific Indonesia Duri Riau Indonesia

Duties & Responsibilities

Piping Foreman

Review Piping Isometric Drawing prepared to erction spool and support, production schedules and work orders to determine type and quantity of materials required availability and priority.

Make report on the actual quantity of materials that arrive on site which will be forwarded to our main office.

14.Position : Piping Leadman

Inclusive : February 25th 1999 until July 10th,1999

Company : PT.Truba Jurong Engineering Indonesia

Location : Kabupaten Muara Enim South Sumatera Indonesia

Project : PT.Musi PulpMill and Paper Project

Duties & Responsibilities

Piping Leadman

Erection pipe spool and pipe support, hydrotest, pretest, leaktest, chemical

Test, nitrogent test, precommisioning, re-instatement spool, punchlist, linewalk

Inspection before and after with client to clearance.

15.Position : Piping Foreman

Inclusive : July 14th1998 up October 25th,1998

Company : PT.Truba Jurong Engineering Indonesia.

Location : Bontang East Kalimantan indonesia

Projectt : PT.Pupuk Kaltim Popka Project

Duties & Responsibilities

Piping Foreman

Erection pipe spool and pipe support, hydrotest, pretest, leaktest, chemical

Test with nitrogent, pree-commisioning, re-instatement spool, punch list, line walk

Inspection before and after with client to clearance.

16.Position : Foreman

Inclusive : August 12th,1997 up to Juny 17th 1998

Company : PT.Truba Jurong Engineering Indonesia

Location : Bosowa Maros Suoth Sulawesi Indonesia

Project : PT Semen Bosowa Portland

17.Position : General Foreman

Inclusive : June 09th 1997 up to December 24th,1997.

Company : PT.Truba Jurong Engineering Indonesia

Location : Pangkalan Kerinci Riau

Project : PT.Riau Andalan Pulp and Paper BSP Paper Machine Project.

18.Position : Piping Foreman

Inclusive : August 26th 1996 up to June 06th 1997

Company : PT Promits Engineering and Construction Indonesia

Location : Suralaya Serang Merak West Java

Project ; PLTU Suralya Steam Power Plant Project unit #5,6 and 7.

19.Position : Pipe Fitter

Inclusive : July 05th 1995 up to August 07th 1996

Company : PT.Truba Jurong Engineering Indonesia

Location : Suralaya Serang Merak West Java

Project : PLTU Suralaya Steam Power Plant Project unit #5 and 6.

20.Position : Pipe Fitter

Inclusive : May 13th,1994 up to January 23th 1995.

Company : PT.Mc ConnelDowell Indonesia PT.Resources Jaya Tehnik Management Indonesia

Location : Pangkalan Kerinci Riau Indonesia

Project : PT.Riau Andalan Pulp and Paper Indonesia

The above of Curriculum Vitae (CV) my used as record of my last education and job experience and agree,that company will be thrushes of statement containd.

Best Regards

Busril