OBJECTIVE: -Looking for a challenging position and to prove, enhance my capability to give optimum benefit to the organization for which I am working & I want to use my book knowledge into practical work and expect to make a positive contribution to my organization. And to be part in all companies goal.

Professional Experience : 14 years & 8 month (NATM 8 YEARS)

Key Skills Work as per Drawing (Cross Passages Excavation (NATM) Reinforcement, Concrete works, Formworks, Structure, Under Ground Excavation) Site Area Civil Work Under Safety Policy handle all aspects related to construction equipment management and the making of decisions pertaining to production on a daily basis.

Current Post : NATM Foreman, (From Jun 2015 to Till Date)

Current Company Location : Working With PSH (Porr /Saudi Bin Laden/Hamid Bin Khalid) Joint venture Green Line Underground Metro Project Doha, Qatar

Worked as a Sr.Foreman from Jan 2015 to May 2015 at Metro Tunnel Cross Passage Work with

“TRANSTONNELSTROY- AFCONS JV” Chennai Rail Metro Project Chennai, (South India)

Job Profile

N.A.T.M. Cross Passage excavation, rock support, rock anchor wire mesh, Lattice gurder alingnment, fixing, shotcrete work as per drawings. Handling all excavation work under safety policy at site

Bottom cleaning and Invert concreting work for rail line foundation.

•Supervising the sites with the Site Engineer, and monitoring of the completion of site work.

•Coordinating and handling the work with the Site Engineer and Surveyor’s to complete the task.

•Supervision of worker on site for the completion of work.

•Support for site establishment Control the men power and equipment work as per plan and arrange the shift.

•Support for site establishment Control the men power and equipment work as per plan and arrange the shift.

•Working capacity at site as per work plan, and Quality assurance, progress report and should be able to perform

WORKING EXPERIENCE: worked as a Concrete Supervisor from May 2013 to Nov. 2014 Leighton India Contractors Pvt Ltd (LIN) a part of Leighton Group - one of the world’s largest EPC& Contract Mining organization. Leighton operations in India commenced with the first contract in 1998.The project involved up-gradation of the existing 2 lane NH4 to a 6 lane toll-way including a long tunnel as well as non-toll facility at Adoshi. Since then, Leighton has demonstrated its capability by taking on projects ranging from industrial factories to IT Parks & high rise residential towers, from roads to national highways, from construction of single point moorings to laying of oil gas pipelines under the sea. Leighton demonstrates a unique combination of local knowledge and extensive international experience at each of its project which culminates from development of competitive innovative& practical solutions. Leighton’s ability to consistently deliver results to clients, shareholders & communities in India’s geographically vast & culturally diverse landscape is backed by its motivated, focused& performance-driven workforce. Leighton operates in the disciplines of Buildings, Civil and Infrastructure, Contract Mining, and Oil & Gas through its offices at Mumbai and Gurgaon (Delhi) as well as its project offices spread across the country.

Job Profile Worked as a Concrete Supervisor from May 2013 to Nov. 2014

NATM main tunnel excavation, rock supporting, Lattice, wire mess SD anchor, swellex rock anchor fixing work,

Reinforcement, lining shuter, concrete pouring work

Forpolling, pipe roofing, lattes rib fixing, wire mess fixing, rock anchor rock support work(76mm)

Support for site establishment Control the men power and equipment work as per plan and arrange the shift.

Working capacity at site as per work plan, and Quality assurance, progress report and should be able to perform

STRABAG-AG AFCONS JOINT VENTURE: Strabag AG Austria as leader of Joint Venture with Indian Construction Company Afcons was awarded the contract for the construction of the 8.8 km long & 10 m wide prestigious Rohtang Pass Highway Tunnel Project near Manali. Employer is the Government of India through its subsidiary Border Roads Organization. The Rohtang Pass in the Western Himalaya Region of Northern India with its altitude of 3,980 m ranks among the highest trafficable passes in the world. Construction costs for the tunnel including pavement amount to approx. EUR 250 mil.)

Worked as a Tunnel Forman Since June 2010 to May 2013 in “STRABAG-AG AFCONS JOINT VENTURE” 8,800 Meter’s Long Rohtang Pass Highway Road Tunnel Project under (BRO) Border Road Origination at Manali, Kullu, Himachal Pradesh.

Job Profile

Tunnel excavation, rock support,rock anchor wire mesh, shotcrete work .as per drawings. Handling all excavation work under safety policy at site.

•Supervising the sites with the Site construction manager, and monitoring of the completion of site work.

•Coordinating and handling the work with the Site Engineer and Surveyor’s to complete the task.

•Supervision of worker on site for the completion of work.

•Support for site establishment Control the men power and equipment work as per plan and arrange the shift.

•N.A.T.M.(Forpolling, Pipe roofing, Lattes rib fixing, wire mess fixing, rock anchor rock support work(76mm,89mm,114mm)

•Support for site establishment Control the men power and equipment work as per plan and arrange the shift.

•Working capacity at site as per work plan, and Quality assurance, progress report and should be able to perform

Since January 2010 To May 2010 Worked as a “Concrete Incharge” in “DONGA GEOLOGICAL ENGINEERING (INDIA) PVT, LTD (this is the from South Korea). At Rampur Stage II 412 M.W. Hydroelectric Power Project under (S.J.V.N.L.) at RAMPUR, SHIMLA Himachal Pradesh.

TUNNEL EXCAVATION & OVERT LINING CONCRET

Job Profile

HRT Tunnel excavation, rock support work under(NATM).

Capacity of Lining Concrete planning capacity of grouting work.

Working capacity at site as per work plan, and Quality assurance, progress report and should be able to perform.

Since January 2008 to December 2009 Worked as a Site incharge in “Handa Infrastructure Pvt. Ltd.”(Patel Engg. Ltd) at Rampur Stage II 412 M.W. Hydroelectric Power Project under (S.J.V.N.L.) at RAMPUR, SHIMLA, Himachal Pradesh.

Job Profile

•Power house office building structure construction work.

•Power house approach link roads, water drainage systems.

•274 Meter’s Long Flood protection concrete wall for Power House proction

•Service Bay Structure, EOT column, beam, tie beam reinforcement, & shuttering, supporting work.

•Control Bay Structure, column, beam, tie beam reinforcement, & shuttering, supporting work.

•Western wall beam reinforcement & shuttering, supporting work.

• Power House Dewatering pipeline Excavation & Installation work.

Since January 2007 to December 2007 Worked as a Shift In charge in “Blastech Infrastructure Pvt. Ltd.”(L&T) in Parbati Stage III 520 MW Hydroelectric Power Project under (NHPC) at Sainj, Kullu Himachal Pradesh.

Upstream and Downstream coffer dam, main dam

Job Profile

•Labour Camp, Office Building, Store Building, Workshop Building Erection work.

• Foundation excavation and embankment work.

• Grouting hole drilling and grouting work.

• Bench cutting, excavation slop establishment, site road development and supporting work (wire mess, rock bolts and grouting)

• Control the men power and equipment work plan making and arrange the shift.

Since May 2005 to November 2006 Worked as a Site in Charge in A.P.S. Hydro Pvt. Ltd. In ManeriBhali –Stage IInd. (4x76 MW) Under Uttaranchal Jal Vidut Nigam Dhrasu, Uttarkashi, Uttrakhand.

Job Profile

HRT excavation and rock supporting work under NATM (forpolling,SD anchor,wire mesh and shot Crete).

Bottom cleaning and Invert lining concreting work.

HRT, SFT Gantry Lining shutter alignment and shuttering supporting and overt lining concrete pouring works.

Grouting hole drilling and grouting work.

Control the men power and equipment.

Arrange the site shift and work planning.

Since January 2001 to March 2005 worked as a Tunnel Officer in"Kajima Daewoo" is a joint venture of Kajima Corporation (Japan) and Daewoo Corporation (Korea). Kajima Daewoo joint venture is a construction company responsible for constructing a Dam for a hydroelectric project under (NHPC) at Dharchula, Distt Pithoragarh (Uttaranchal). The office and site staff consists of persons from fourteen (14) different countries including India.

Job Profile

As A Tunnel Officer

• Tunnel Excava

•tion, lattice gurder fixing, shotcrete, Work.

•NATM forpolling wire Mesh, SD anchor, rock Support and Shotcrete Work.

•HRT, SFT, DESILT CHAMBERS Reinforcement work as per drawings.

•HRT, SFT, DESILT CHAMBERS Gantry Overt Lining, Invert Lining Concreting Planning & Pouring work.

PERSONAL DATA

Fathers Name : Mr. Surendr Kumar Garg

Date of birth : August 22 1976

Birthplace : Dehradun, Uttrakhand, INDIA

Religion : Hindu

Civil Status : Married

Passport no : L3233090 up to 11/09/2023

EDUCATIONAL BACKGROUND

COMPUTER LITERATE Diploma in the Software Development from STG Dehradun in 1999.

Civil Diploma From Delhi institute of management studies, in Jan. 2013.

Major Strength Area

Good Interaction skills, handles work pressure efficiently, inquisitive and very quick learner

References:

1. S.C. Mundepi

1100 Indira Nagar, new forest

Dehradun.Uttrakhand

Mob. 094********

2. AmitGarg

94/108, Vijay Path

Mansrover, Jaipur

Mob.094********

I hereby declare that the information furnished above is true to the best of my knowledge.