Post Job Free

Resume

Sign in

Project Controls Planner Scheduler

Location:
Saint Petersburg, FL
Posted:
February 13, 2016

Contact this candidate

Resume:

Kent Gomez

St. Petersburg, Florida

actikz@r.postjobfree.com

Summary (Project Controls Professional)

Over 15 years of Project Controls planning, Programme development and cost tracking support for refinery T/A, Oil & Gas operations, power generation up-rate, outage and brown field EPC plant planning and construction

Certified, Oracle Primavera Certified P6 – Ver. 8.0+ and Primavera 3.1

Work experience exposure include EPC Planning and Scheduling new Turbine Installations and Critical Outage Projects, Power Generation C-Cycle Plant Maintenance Including Turbine Rotor and Generator Assemblies, and Coal-fired return to service remediation (Turbines, Generators, Boilers and BOP), Oil Refinery Turnaround Support, Refinery maintenance, Operations Craft Support, Forced Outages, Engineering Support, Flue Gas Expansion Joint Replacement, FGD Wet and Scrubber T/A and forensic scheduling analysis

Design/Build vertical facilities and civil projects include Port Of Miami facilities expansion, (WWTP, Water Mains and Drainage Pump Stations) in support of US Military (Iraq), and USACE assisted projects (Puerto Rico RR Airport and Ft. Carson, Colorado and New Orleans).

Certified user of Oracle/Primavera Electronic Project Planning systems including:

- P3.1 through P6 Ver. 8.0 (Power User) and Database Implementation

- Microsoft Project – including MS Office Suite & SureTrak Project Planning

- LEED AP – Scheduling In Application

- Constructware Planning System

- RMS/QCS U.S. Army Corp of Engineers Project Management Systems

- Meridian Prolog Manager and Project Talk

- (Portal/J) Passport Database

- FPSO (Floating Production Storage & Offloading) Schedule Support

- CA Clarity – NIKU MS Project Interface Implementation

- SAP – Cost Center Owner Certified (Cost Tracking)

- JD Edwards One World – Accounting Reporting Modules

- Refinery TWIC Card – current

- NERC-CIP trained and cleared

- FIDIC Contract Configuration Management

Contractor Work History

Recent Planning Consultant – GE Distributed Power, Standard Plant Planner Program Planner – GE Distributed Power Div., Fast Power LM6 PF+ GTG Product Introduction and Pilot Project (Contract, GE Alpharetta, GA)

FEB14-NOV14 Lead Project Controls Planner/Scheduler – Power Gen. propane terminals and dual fuel conversion projects for WAPA, Virgin Islands including cost tracking, engineering support CPM construction, and commissioning schedule development

SEP13-FEB14 Sr. Project Scheduler – AB Western (Alberici Constructors Ltd.) SaskPower (Canada) PT-150 Carbon Capture and Turbine Replacement turnaround (Saskatchewan Boundary Dam Power Sta.) 03MAR12-SEP12 Sr. Planner/Scheduler Supporting Freeport MacMoran Mining – Copiapo, Chile (Mine Expansion, new power generation, water main, transmission and Lift Stations) estimates to completion, PCN management support, and commissioning schedule development 2011-2012 Project Controls Manager, LakeshoreToltest U.S. Dept. Of State Embassy Housing Project, Haiti - Planning, Pre-construction Estimate and CPM Schedule Development 2010 - 2011 Project Controls Manager, ProEnergy Services – Base Load Project Controls for various turbine-electric new build projects in Venezuela using various turbine platforms including: GE LM6000, LM2500+’s, Roll Royce Trent 60’s and supporting BOP systems. Also Responsible for Primavera P7 schedule development, management, monthly reports and forensic claims analysis.

2009 - 2010 Lead Project Planner, Wyatt, Inc. (HOVENSA Oil Refinery) Build/resource/cost-load Turnaround schedule and provide manpower and material estimates for Fuel Cat Cracker Outage, including Exchangers, Boilers, Towers, Regen, Heaters, and SHU 2009 Recovery Planner, Siemens Argentina (Atucha 1Nuclear Plant) Re-base and expand project schedule – Turbines, generators, piping, condensers, revised building (piping) penetrations and estimates to completion, and prepare claims contract line item timeline 2007 – 2009 Sr. EPC Program Planning Manager, General Electric (Granite) South Africa Lead Planner providing project controls scheduling for return-to- service simple Cycle Coal-fired Plants – turbines (Rotek Engineering), rotors balancing, condensers, and boilers.

Eskom New Coal EPC Planning Consultant for new 4800 MW Coal- fired Plant (Project Bravo & Medupi) including permitting, engineering and owner Project Execution Schedule for Boiler, Turbine mechanical installation

2006 – 2007 Project Controls Planning Manager, Alcoa Aluminum Jamaica Review contract and engineering deliverables to expedite deployment of project schedule for Early Works Bauxite Plant Expansion, bauxite mining sub-projects, and new Hydro-metallurgical Residual Deposit Areas – civil quantities exceeding 2 million cubic yards (cut to fill) 2005 – 2006 Consultant - Cost/Scheduler, Glaxo Smith Kline (GSK) Puerto Rico Take-over planning and scheduling effort for critical FDA Compliance CAPA 01 Project. Built IMS for client adhering to court decree scope and validation specifications incorporating QMS Implementation, Interim Controls, EDM Document Management System, and GMP Documents

2004 – 2005 Sr. Prog. Scheduler, Environmental Chemical Corp, Kir Kush, Iraq Provided war zone program and project controls in support of US Military Construction (AFCEE, CPA and the New Iraqi Army). Managed Primavera database administration for existing regional projects, providing monthly reporting narratives and metrics. Provided aggressive field support for rapid build Airfield and Runway Projects, WWTP, WTP, HDPE water main piping, and EPC scheduling for a large diesel power generation station and switch yards. 2003 – 2004 Dick Construction – 14 Story U.S. Federal Courthouse, Miami, FL Project Scheduler for large vertical EPC GSA project in downtown Miami, FL. Manage contract schedule, update installed quantities, analyze Programme variance (from Baseline), generate look-ahead schedule forecasting, draft monthly Executive Narrative and project metrics reports. Review subcontractor tender bids and schedules, and support subcontractor progress payment procedures. 2002 – 2003 Sr. Scheduler and Cost Tracker, Foster Wheeler Environmental – Miami, Florida

Build/manage integrated master schedule for large civil-vertical port expansion projects and intermodal facilities. Interfaced daily with, and provided reporting outputs to P&O Ports Program management. 2000 – 2002 Sr. Planner, Haliburton Energy Services, Inc – Niznevartovsk, Russian Federation

Provided project controls and scheduling support for TNK oil field rehab and exploration in Western Siberia. Managed EXIM Bank compliance requirements, project scheduling, cost tracking, materials and equipment inventories. Draft monthly executive reports. 1999 – 2000 Sr. Project Planner, J.A. Jones Management Services, Inc. Provided program and field scheduling support for CONCAP team repairing extensive hurricane damage to facilities at the Roosevelt Roads Naval Air Station, PR including airport runways, bulk earthwork Grading, elevations stockpile areas, and airfield terminal construction. Draft pre-construction estimates and schedule for Naval Air Force bomb damage repairs at the Atlantic Fleet Weapons Training Facility on the Island of Vieques, Puerto Rico. Re-mobilized to Ft. Carson in Colorado Springs, CO and developed Project Controls (PMO) department for expanding military housing and remediation project. 1997 – 1999 Planner/Scheduler, St. Croix Basic Services – (Amarada Hess Oil Refinery)

Developed critical path turnaround schedules, equipment, scaffolding and material estimates for process unit maintenance including turbine and generators (EDG). Provide O&M and Capital projects CPM scheduling for refinery expansion, craft and engineering support, ALKY units, boilers, general piping, heaters, visbreakers, relief valve groupings, graduated towers, trays, rotary equipment, DU/DD reactor and platform reactors.

Education/Certifications

Business Systems Admin - Montserrat University, West Indies 1994 Associate of Arts Program, Merritt Collage, Oakland, California High School, Saints Peter and Paul, St. Thomas, Virgin Islands Microsoft Professional Certification (MPC No. 979455 – 1998) SAP Cost Center Owner Training – Primary through Advanced Project Management Institute – PMI No. 220825

Certified/trained - Oracle/Primavera Project Planning Systems – P6/P7

*Anticipate sitting for PMP Exam early 2015

Federal Communications Commission (FCC) Extra Class License current – No.000******* KP2S, High Frequency radio station operations including VHF and satellite

TWIC Card curren - Transportation Worker Identification Credential US passport and inoculations are current.

Canadian Work Visa current (2013 – 2014)

* Non-smoker, avid sailor, and amateur Photographer



Contact this candidate