Post Job Free

Resume

Sign in

Project Engineer

Location:
Kota Kinabalu, Sabah, Malaysia
Salary:
7000
Posted:
February 10, 2016

Contact this candidate

Resume:

CURRICULUM VITAE

Abdul Ammarsyafiq Bin Muhd Amli

Email : actgzd@r.postjobfree.com

Contact No. : +601******** / +601********

Address : C-0-12 G/F Block C University Condo Apartment 2, Jalan Tuaran, Menggatal 88450, Kota Kinabalu, Sabah, Malaysia

Highest Education: Bachelor of Engineering (Metallurgy Engineering) OBJECTIVE

To contribute towards operations and maintenance by providing technical solutions in oil and gas facilities.

CERTIFICATES AND TRAININGS

Basic Offshore safety & Emergency Training (Petronas/PSCs Approved Course)

NIOSH Oil & Gas Safety Passport

Basic Hydrogen Sulphide Training

Authorised Entrant & Standby Person For Confined Space

PCSB Permit To Work System Assessment

SHELL Permit To Work (Applicant) Course

Fire Watcher Course

NIOSH High Pressure Water Jetting Course

Rigging & Slinging Course

Dye Penetrant Testing

Magnetic Particle Testing

Ultrasonic Testing

ACADEMIC QUALIFICATION

2006-2010 : Bachelor of Engineering (Metallurgy Engineering) from, Universiti Malaysia Perlis (2.79)

2005-2006 : Physical Science from Labuan Matriculation College 2005 : MUET (4)

2004 : Sijil Pelajaran Malaysia, SPM from (Sekolah Menengah Kebangsaan [A] Kota Kinabalu( 2A 5B 3C)

2002 : Penilaian Menengah Rendah, PMR (5A 4B)

COURSES ATTENDED:

• Material Structure

• Strength of Material

• Electrical Technology

• Engineering Mathematics (1, 2, 3)

• Engineering Skills (1, 2)

• Engineering Material Chemistry

• Engineering Mechanics

• Computer Programming

• Communication Skills & IT

• Physical Metallurgy

•Transportation Phenomenon in

Material Processing

• Quality Control

• Material Properties

• Phase Transformation

• Process Control

• Extractive Metallurgy

• Mechanical Metallurgy

• Materials Characterization

• Engineering Fluid Mechanics

• Materials Thermodynamics

• Non Destructive Testing

• Corrosion Engineering

• Engineering Alloys

• Applied Metallurgy

• Engineering in Society

• Welding Metallurgy

• Metallurgical Design

• Metallurgical Forensic Analysis

•Project Management

ADDITIONAL SKILLS:

* Hardworking.

* Able to learn quickly and practical

* Engineering Skill: programmable logical control (PLC), PCB, Autocad (basic), OrCad

(basic), Millling, Lathe

Welding, Wiring & Matlab

* Computing Skills: Microsoft Office (Intermediate). ACTIVITIES:

• Members of Rakan Muda Desa Wawasan – 2006

• Kursus Mahasiswa Biro Tata Negara, Kem Ulu Kenas Perak (UniMAP) – 2006

• AJK Majlis Berbuka Puasa PPK Bahan (UniMAP) 2006 - 2007

• Index (Industrial Exposure - UniMAP) – 2007

• Program Pengurusan Stress (UniMAP) - 2007

• Majlis Sambutan Maulidur Rasul (UniMAP) – 2007

• Pertandingan Kompang Peringkat Universiti (UniMAP) – 2007

• Kejohanan Sukan Olahraga Tertutup UniMAP 2007 - 2010

• Kejohanan Futsal Tertutup PPK Bahan (UniMAP) 2007 – 2010

• Program Menabur Bakti Di Pertubuhan Kebajikan Anak-Anak Yatim (UniMAP) - 2008

• Program Jalan Kaki (UniMAP) - 2008

• Khidmat Komuniti Bersama Masyarakat (UniMAP) – 2008

• Freshie Integration Programme 2008 (UniMAP)

• Kursus Kemahiran Komunikasi 2009 (UniMAP)

LANGUAGE PROFICIENCY

(Proficiency: 0=Poor - 10=Excellent)

Language Spoken Written

Malay 10 10

English 7 8

CAREER HISTORY

BARISAN SAMUDERA SDN. BHD

Working as Project Engineer at Barisan Samudera Sdn. Bhd (4 Oct 2010 – Recently)

Project handled during work under BSSB:

1. Maintenance inspection and videoscope / CCTV services for six (6) units of Non- Entry Pressure Vessels For Compressor K-7600 Onboard Baronia Offshore Complex (BNG-B) For Petronas Carigali Sdn.Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Drain out the oil/water from the NEPV.

Purging with nitrogen gas and carry out cleaning using degreaser inside the NEPV, then gas test by Operation.

Carry out videoscope/boroscope inspection inside the NEPV.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test at nozzle of the NEPV.

Remove and replace the old gaskets and stud bolt. i. Plan to commence: 5 days (10 Nov – 14 Nov 2010) ii. Total days project executed: 5 days (10 Nov – 14 Nov 2010) iii. Total of manpower: 7 pax.

2. Maintenance cleaning and Inspection on Gas and Water Coolers for Compressor K-7600 Onboard Baronia Offshore Complex for Petronas Carigali Sdn. Bhd – Sarawak Operation.

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new stud bold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 7 days.

ii. Total days project executed: 13.12.2010 – 19.12.2010 iii. Total of manpower: 7 pax.

3. Wrapping of Corroded Piping Using Wrapseal at Baram Offshore Complex for Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 12 days.

ii. Total days project executed: 15.02.2011 – 26.02.2011 iii. Total of manpower: 5 pax.

4. Maintenance cleaning, Inspection and Specialist Services on Gas and Water Coolers of Compressor K-7300 Onboard Bokor Offshore Complex (BOK-A) for Petronas Carigali Sdn. Bhd – Sarawak Operation.

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new studbold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 10 days.

ii. Total days project executed: 07.05.2011 – 16.05.2011 iii. Total of manpower: 8 pax.

5. Maintenance cleaning, inspection and specialist services on Gas / Water and Lube Oil Cooler of Compressor K1 Onboard Tukau Offshore Complex (TKDP-B) for Petronas Carigali Sdn. Bhd – Sarawak Operation.

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new studbold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 11 days.

ii. Total days project executed: 27.07.2011 – 06.08.2011 iii. Total of manpower: 8 pax.

6. Retubing of Water Coolers (EJW/AW) for Compressor K1 Onboard Tukau Offshore Complex (TKK-A) for Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Depressurize the water cooler and drain out the remaining liquid.

Box-out the units. Remove the protection covers, both end plugs and piping.

Cut and remove all tubes from the respective tubesheet.

Insert new tubes, expand tubes end by mechanical expansion of tube sheet joints.

Perform hydrotest and hold for 60 minutes. Remove all blind spades and reconnect the flanges connection. All corroded bolts/nuts and gaskets to be changed.

Carry out leak check / monitoring during start-up and touch-up painting.

Rig down project equipments, housekeeping and handover the units to Operation.

i. Plan to commence: 10 days

ii. Total days project executed: 10 days (2 Oct – 11 Oct 2011) iii. Total of manpower: 8 pax.

7. Retubing of Water Coolers (EJW/AW) For Compressor K-7100 Onboard West Lutong Offshore Complex (WLK-A) for Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Depressurize the water cooler and drain out the remaining liquid.

Box-out the units. Remove the protection covers, both end plugs and piping.

Cut and remove all tubes from the respective tubesheet.

Insert new tubes, expand tubes end by mechanical expansion of tube sheet joints.

Perform hydrotest and hold for 60 minutes. Remove all blind spades and reconnect the flanges connection. All corroded bolts/nuts and gaskets to be changed.

Carry out leak check / monitoring during start-up and touch-up painting.

Rig down project equipments, housekeeping and handover the units to Operation.

i. Plan to commence: 10 days

ii. Total days project executed: 10 days (13 Dec – 22 Dec 2011) iii. Total of manpower: 8 pax.

8. Inspection and Videoscope/CCTV services for Vertical Fuel Gas Scrubber S-6510 Onboard West Lutong Offshore Complex (WLK-A) for Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Drain out the oil/water from the NEPV.

Purging with nitrogen gas and carry out cleaning using degreaser inside the NEPV, then gas test by Operation.

Carry out videoscope/boroscope inspection inside the NEPV.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test at nozzle of the NEPV.

Remove and replace the old gaskets and stud bolt. i. Plan to commence: 4 days (13 Feb – 16 Feb 2012) ii. Total days project executed: 4 days (13 Feb – 16 Feb 2012) iii. Total of manpower: 5 pax.

9. Maintenance Cleaning, Inspection and Specialist Services on Gas and Water Coolers of Compressor K-2400 Onboard Temana Offshore Complex (TEDP-B) for Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new studbold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 14 days.

ii. Total days project executed: 14 days (21 April – 04 May 2012) iii. Total of manpower: 10 pax.

10. Maintenance cleaning, inspection and specialist services on GG Lube Oil and Compressor Lube Oil Coolers of Compressor K-2400 Onboard Baram Offshore Complex (BAKP-B) for Petronas Carigali Sdn. Bhd – Sarawak Operation.

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Drain out lube oil and remove header plug for videoscope/boroscope inspection.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the lube oil.

Carry out flushing/circulating inside the lube oil cooler using Mobile Jet Oil and HC-46 Jenteram Oil.

i. Plan to commence: 5 days (8 July – 12 July 2012). ii. Total days project executed: 5 days (8 July – 12 July 2013) iii. Total of manpower: 6 pax.

11. Maintenance Inspection and Videoscope/CCTV Services for Non-Entry Pressure Vessels (NEPV) for Compressor K1 & K3 Onboard Tukau Offshore Complex

(TKK-A) for Petronas CariGali Sdn. Bhd – Sarawak Operation.

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Drain out the oil/water from the NEPV.

Purging with nitrogen gas and carry out cleaning using degreaser inside the NEPV, then gas test by Operation.

Carry out videoscope/boroscope inspection inside the NEPV.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test at nozzle of the NEPV.

Remove and replace the old gaskets and stud bolt. i. Plan to commence: 5 days (7 August – 11 August 2012). ii. Total days project executed: 5 days (7 July – 11 July 2013) iii. Total of manpower: 10 pax.

12. Proposal for CUI (Corrosion Under Insulation) Inspection For Piping Under Insulation Onboard Baram BAK-B Offshore Complex For Petronas Carigali Sdn. Bhd – Sarawak Operation.

Project Summary

Remove the old/broken aluminium cladding and insulation.

Carry out Ultrasonic Thickness Gauge Test and visual inspection on the surface of the linework.

Replace with new aluminium cladding and insulation. i. Plan to commence: Approximately 2 months and above. ii. Total days project executed: To Be Advise (TBA) – still ongoing. iii. Total of manpower: 10 pax.

Remark*

Nanocoating Trial Onboard Baram Offshore, BAK-B

New method for pipe insulation instead of using conventional insulation for eliminating CUI problem without compromising health and safety.

Carry out surface preparation on the linework, and then apply Nanocoating material.

Each layers of nanocoating will reduce the temperature of the linework. i. Plan to commence: Approximately a month and above. ii. Total days project executed: To Be Advise (TBA). iii. Total of manpower: 10 pax.

13. Maintenance Cleaning, Inspection and Specialist Services On Gas, Water and Lube Oil Cooler of Compressor K4 Onboard Tukau Platform (TKK-A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new studbold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 9 days.

ii. Total days project executed: 27.9.2012 – 5.10.2012 iii. Total of manpower: 8 pax.

14. Inspection and Videoscope/CCTV Services For Non-Entry Pressure Vessels

(NEPV) For Compressor K4 Onboard Tukau Offshore Complex (TKK-A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Drain out the oil/water from the NEPV.

Purging with nitrogen gas and carry out cleaning using degreaser inside the NEPV, then gas test by Operation.

Carry out videoscope/boroscope inspection inside the NEPV.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test at nozzle of the NEPV.

Remove and replace the old gaskets and studbolt. i. Plan to commence: 9 days.

ii. Total days project executed: 27.9.2012 – 5.10.2012 iii. Total of manpower: 8 pax.

15. Rectification of P1 (Priority 1) Piping at Tukau Field Complex (Tukau-A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

One of method that applies on the linework to prevent it from leak, cause by internal and external corrosion.

Obtain drawing (P&ID) and list of linework that need to be wrapping according the condition of line.

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: A month and above.

ii. Total days project executed: 8.12.2012 – 14.01.2013 iii. Total of manpower: 9 pax.

16. Wrapping on Corroded Linework Using Wrapseal at Bokor Offshore Complex

(BODP-B) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 5 days.

ii. Total days project executed: 14.02.2013 – 18.04.2013 iii. Total of manpower: 3 pax.

17. Rectification of P1 (Priority 1) Piping at Bokor Field Complex (Bokor-A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

One of method that applies on the linework to prevent it from leak, cause by internal and external corrosion.

Obtain drawing (P&ID), find manually (hunting) the corroded area on the linework.

Obtain the list of linework that need to be wrapped, produce API 570 calculation to determine the life span of the corroded linework

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 2 months.

ii. Total days project executed: 22.02.2013 – 26.04.2013 iii. Total of manpower: 10 pax.

18. Wrapping on Corroded Linework Using Wrapseal at Tukau Offshore Complex

(TKQ-A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 2 days.

ii. Total days project executed: 25.05.2013 – 26.05.2013 iii. Total of manpower: 2 pax.

19. Wrapping on Corroded Linework Using Wrapseal at Baronia Offshore Complex

(BNDP-B) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 3 days.

ii. Total days project executed: 26.06.2013 – 28.06.2013 iii. Total of manpower: 2 pax.

20. Wrapping on Leaked 10”-VH-0359-1143 Linework Using Wrapseal at Baronia Offshore Complex (BNG-B) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 1 day.

ii. Total days project executed: 30.06.2013

iii. Total of manpower: 2 pax.

21. Chemical Cleaning and Inspection On Printed Circuit Heat Exchanger (PCHE) Onboard Kanowit Offshore Complex (KAKG-A) For Petronas Carigali Sdn. Bhd

– Sarawak Operation

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Install positive isolation. Set up close loop/circulation system.

Soaking the unit with biodegradable cleaning chemical, Citric Acid descaler (STE-3) and Neutralizer/Passivator (DE-2). Flush the unit with potable water.

Carry out maintenance cleaning using high pressure water jetting, and then perform Ultrasonic Thickness Gauging Test, Dye Penetrant Test and Videoscope/Boroscope inspection.

Carry out leak test on the unit.

Remove positive isolation, change-out gaskets and bolt/nuts. Perform bolt tightening.

i. Plan to commence: 7 days.

ii. Total days project executed: 19.07.2013 – 26.07.2013 (Tentative) iii. Total of manpower: 12 pax

22. Inspection and Videoscope/CCTV Services For Non-Entry Pressure Vessels

(NEPV) Onboard Tukau Offshore Complex (TUKAU-A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Drain out the oil/water from the NEPV.

Purging with nitrogen gas and carry out cleaning using degreaser inside the NEPV, then gas test by Operation.

Carry out videoscope/boroscope inspection inside the NEPV.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test at nozzle of the NEPV.

Remove and replace the old gaskets and studbolt. i. Plan to commence: 6 days.

ii. Total days project executed: 24.9.2013 – 29.9.2013 iii. Total of manpower: 7 pax.

23. Maintenance Cleaning, Inspection and Specialist Services On Gas, Water and Lube Oil Cooler of Compressor K-7200 Onboard West Lutong Platform (WLK- A) For Petronas Carigali Sdn. Bhd – Sarawak Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new studbold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 9 days.

ii. Total days project executed: 9.10.2013 – 17.10.2013 iii. Total of manpower: 8 pax.

24. High Pressure Water Jetting Cleaning and Inspection On Printed Circuit Heat Exchanger (PCHE) Onboard Yetagun Offshore Complex (YET-B) For PC Myanmar (Hong Kong) Limited

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Erect temporary platform. Then, install positive isolation.

Carry out maintenance cleaning using high pressure water jetting, and Videoscope/Boroscope inspection.

Carry out leak test on the unit.

Dismantle temporary platform, remove positive isolation, change-out gaskets and bolt/nuts. Perform bolt tightening.

i. Plan to commence: 10 days.

ii. Total days project executed: 03.01.2014 - TBA (Tentative) iii. Total of manpower: 18 pax.

25. Wrapping Using Wrapseal On Corroded Nozzles Of Vessel V-210 Onboard Tembungo Platform (TBG-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 1 day.

ii. Total days project executed: 04.04.2014

iii. Total of manpower: 2 pax.

26. Maintenance & Cleaning On Five (5) Units Of Pressure Vessels Onboard Samarang Platform (SMP-A & SMDP-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Erect temporary platform. Then, install positive isolation.

Purging using nitrogen gas (N2) and carry out gas test by authorized personnel before open manhole.

Open manhole and TENORM inspection by other contractor. Setup air ventilation to maintain the level of gas inside the vessel.

Perform cleaning inside the vessels and internal side inspected by other contractor.

Reinstate manhole, remove positive isolation, change-out gaskets and bolt/nuts. Carry out purging using N2 gas.

Dismantle temporary platform, housekeeping, standby for start-up and handover the unit to operation.

i. Plan to commence: 10 days.

ii. Total days project executed: 15.05.2014 – 19.05.2014 iii. Total of manpower: 16 pax.

27. Wrapping Using Wrapseal On Corroded Nozzles Instrument Gas Scrubber S-1 Onboard Samarang Platform (SMJT-C) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 1 day.

ii. Total days project executed: 20.05.2014

iii. Total of manpower: 3 pax.

28. Wrapping Using Wrapseal On Thinning Nozzles Compact Manifold 2L Onboard Samarang Platform (SMK-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Carry out surface preparation on the corroded linework.

Apply Seal Stick Putty/DEVCON on the corroded linework for rebuild the surface.

Apply wrapseal on the corroded linework to strengthen the wall of linework.

i. Plan to commence: 1 day.

ii. Total days project executed: 21.05.2014

iii. Total of manpower: 2 pax.

29. Maintenance Cleaning, Inspection and Specialist Services On Gas Cooler (E- 3105) and Lube Oil Cooler (E-3095) Onboard Samarang Platform (SMG-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new stud bold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 12 days.

ii. Total days project executed: 22.05.2014 – 02.06.2014 iii. Total of manpower: 8 pax.

30. Maintenance Cleaning On IPP KO Vessel V-2910 at Sabah Gas Terminal

(SBGAST) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Erect temporary platform. Then, install positive isolation.

Purging using nitrogen gas (N2) and carry out gas test by authorized personnel before open manhole.

Open manhole and TENORM inspection by other contractor. Setup air ventilation to maintain the level of gas inside the vessel.

Perform cleaning inside the vessels and internal side inspected by other contractor.

Reinstate manhole, remove positive isolation, change-out gaskets and bolt/nuts. Carry out purging using N2 gas.

Dismantle temporary platform, housekeeping, standby for start-up and handover the unit to operation.

i. Plan to commence: 5 days.

ii. Total days project executed: 22.07.2014 – 26.07.2014 iii. Total of manpower: 5 pax.

31. Maintenance & Cleaning On Eighteen (18) Units Of Pressure Vessels Onboard Erb West & Kinarut Platform (EWG-A/EWP-A/KNDP-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Erect temporary platform. Then, install positive isolation.

Purging using nitrogen gas (N2) and carry out gas test by authorized personnel before open manhole.

Open manhole and TENORM inspection by other contractor. Setup air ventilation to maintain the level of gas inside the vessel.

Perform cleaning inside the vessels and internal side inspected by other contractor.

Reinstate manhole, remove positive isolation, change-out gaskets and bolt/nuts. Carry out purging using N2 gas.

Dismantle temporary platform, housekeeping, standby for start-up and handover the unit to operation.

i. Plan to commence: 13 days.

ii. Total days project executed: 16.08.2014 – 28.08.2014 iii. Total of manpower: 18 pax.

32. Maintenance & Cleaning On Test Separator V-800 Onboard Samarang Platform

(SMJT-C) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Erect temporary platform. Then, install positive isolation.

Purging using nitrogen gas (N2) and carry out gas test by authorized personnel before open manhole.

Open manhole and TENORM inspection by other contractor. Setup air ventilation to maintain the level of gas inside the vessel.

Perform cleaning inside the vessels and internal side inspected by other contractor.

Reinstate manhole, remove positive isolation, change-out gaskets and bolt/nuts. Carry out purging using N2 gas.

Dismantle temporary platform, housekeeping, standby for start-up and handover the unit to operation.

i. Plan to commence: 2 days.

ii. Total days project executed: 01.11.2014 – 02.11.2014 iii. Total of manpower: 8 pax.

33. Maintenance Cleaning, Inspection and Specialist Services On 2nd Stage Compressor Gas Cooler (E-3100) and Lube Oil Cooler (E-3080) Onboard Samarang Platform (SMG-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Determine the inlet and outlet line to carry out positive isolation

(spading/despading).

Remove the header plug from header box using impact wrench (required air supply).

Mix the degreaser with water. Carry out cleaning inside the tubes using the high pressure water jet.

Carry out IRIS and videoscope inspection to check the condition of tubes.

Carry out non-destructive testing such as ultrasonic thickness gauge test and dye penetrant test of header box and nozzle of the cooler.

Replace with new stud bold, gasket, header plug and washer. Also, apply the new paint.

i. Plan to commence: 4-5 days.

ii. Total days project executed: 04.11.2014 – 09.11.2014 iii. Total of manpower: 8 pax.

34. Maintenance & Cleaning On Test Separator V-3036 Onboard Samarang Platform

(SMG-A) For Petronas Carigali Sdn. Bhd – Sabah Operation

Project Summary

Isolate and depressurize the unit and drain out remaining fluids.

Erect temporary platform. Then, install positive isolation.

Purging using nitrogen gas (N2) and carry out gas test by authorized personnel before open manhole.

Open manhole and TENORM inspection by other contractor. Setup air ventilation to maintain the level of gas inside the vessel.

Perform cleaning inside the vessels and internal side inspected by other contractor.

Reinstate



Contact this candidate