Post Job Free

Resume

Sign in

Project Construction

Location:
Doha, Qatar
Posted:
February 09, 2016

Contact this candidate

Resume:

PERSONAL DETAILS :

Name

:

ARIEL C. DE GALA

Position

:

Civil Engineer Inspector

Nationality

:

Filipino

Date of Birth

:

April 20, 1967

KEY QUALIFICATIONS :

With a total of 25 years of experience from Construction Engineering Projects and Supervision works handling various types of civil construction and structural works with duties and responsibilities ranging from Project implementations and execution, Project coordination of all engineering disciplines, Supervision for building phases such as Earthwork, Formwork, Steel structural work, Brick and Tile works, Insulation works, Finishing works with some Mechanical and Electrical work, Repairing works, Maintenance works, External work and Landscaping works. Road works and all temporary facilities structures for construction works.

EDUCATION AND PROFESSIONAL QUALIFICATIONS:

Bachelor Degree in Civil Engineering – 1983 - 1988

Diploma in Secondary Education – 1979 - 1983

Diploma in Elementary education - 1973 - 1979

AFFILIATES AND KEY TRAININGS :

Gasco Habshan & Bab safety Training and Permit to Work, Gasco Safety Training Center, Dec.12, 2012 to July 10, 2014 (Validity)

Ras Gas H2S / BA Training, Qatar International Safety Center, Nov.2010– Nov. 2011

ORYX GTL / QP-SASOL, Safety Training RLIC, December 2010

Ras Gas Permit to Work (Basic and Signatory), Qatar International Safety Center

Oct. 27, 2009 to Nov. 02, 2011

Self and Time Management Skills, Spearhead Training Doha Qatar

May 25, 2008

Advance First Aid Training, Doha Industrial Safety Services, Doha, Qatar

June 22, 2007

Basic First Aid training, Doha Industrial Safety Services, Doha, Qatar

April 27, 2007

Member of Civil Engineering Association from University of Southeastern Philippines 1988 to present

Member of Sigma Epsilon an Engineering Organization Group Davao City Chapter Philippines – 1988 to present.

LANGUAGE SKILLS :

English – Good

Tagalog – Good

COMPUTER SKILLS :

Microsoft Office Tools - Word and Excel

TYPES OF PROJECT :

Structural Steel for Telecommunication Towers with 100 m maximum height, Industrial Plant Facilities for Oil and Gas Structural steel, Administrative building, Relay Station building, Sub Station building, Pathways, Rehabilitation Projects for Water supplies, Temporary Facilities Structures for Construction, Road Constructions and Manufacturing Company for Fiber Glass

FIELD OF EXPERIENCE:

2014 to Present

CEG International - Doha, Qatar (Consultancy)

Period

:

Feruary 23, 2014 to Present

Position

:

Civil Engineer Inspector

Project Title

:

School Projects package 05 Doha City & Mushiereb Project (Phase #3 area)

Project Value

:

QR. 150 million and 1.2 billion

Project Duration

:

18 months and 96 months

Client / End User

:

Ashghal / Time Qatar

Contractor

:

AL Sraiya Contracting Company, Obeyashi – HBK JV

Responsibilities

Assist the Project Manager in Implementation the Project activities as per project specification and standard as well as the compliance of the approved method of statement on the specified activities;

Monitor the performances and the progress of the contractor and sub-contractor in relation with the activities being rendered by the entire construction team;

Coordinate with all parties including the Client, Contractor and Sub-contractors with regards to the implementation of the project as well as the comformances of the project design specification and standards, drawings and other related projects documents.

Responded with appropriate action at all levels of the construction to provide a Quantity Assurances and Quality Control in accordance to the project specification and Standards;

Conduct site inspection and check promptly the submitted inspection request documents or RFI as per standard and project specification procedures and as per approved drawings;

Monitor and ensure the proper safety procedures must be implemented or applied in all construction personnel upon doing their own respective duties and responsibilities in the construction fields;

Advice and assist the contractor safety team to be vigilant in relation to the activities being rendered by all construction personnel from their respective activities in the fields;

Review the contractor progress reports at all times, Monitor the work being performed, The Materials being applied shall be incorporated from the submitted approved materials as per project specification and Qatar construction standard;

Recommend some corrective measures if any on the application of construction methods for proper construction progress and suitability measures.

Coordinate with other discipline in relation with the project construction works at the field;

Checking the correction and completion of the As Built drawing as per actual and final installation.

Assist the final inspection of the works activities, review the adequacy and accuracy of the completed works and check the punch list or snag list correction from previous inspections, monitor the completion of the work after the corrections has been made.

2012 to 2013

DESCON Engineering LTD – U.A.E (Contractor)

Period

:

August 28, 2012 to November 13, 2013

Position

:

Senior Civil Engineer

Projects Title

:

Habshan Acid Gas Flare Project ( HAGFR) and

:

Rich Amine Project 1520

:

Habshan Gasco

:

Western region Madinat Zayed Abu Dhabi U.A.E

Projects Value

:

Dhs. 40 million (Total for both Project)

Client / End User

:

Gasco Company

Contractor

:

Descon Engineering LTD

Responsibilities

Responsible for the preparation of some documents needed for the implementation of the projects such as Method of statements for the construction, Preparation for ITP for quality control, RFI forms and material submittal forms.

Analysed survey reports, maps, drawings, or sketch plans, blue print drawings, aerial photography and other related drawings to the projects.

Performed QA/QC quality control inspectors for the entire civil construction activities in the adsence of QA/QC engineers.

Responsible for the preparation of RFI (request for inspection) as per client standard specification.

Directly supervises all the site civil construction activities including the equipment being used during the entire construction period.

Responsible for the requirement and distribution of the equipment and manpower needed at the project site location.

Responsible for the health, safety and environmental management system in the entire duration for all construction activities of the project.

Monitor daily activities and coordinate with the client, site engineers, sub-contractor engineers and other related groups involving with the projects.

Inspect and monitor the progress of the project from respective sites to ensure the conformances to the design specification and safety or sanitation standards;

Provide technical advice regarding the design or solution for unexpected problems being encounter during the execution of the projects.

Direct supervision for the performance of Field Density Test (FDT) teams and materials testing to determine the adequacy and strength of the structures prior for construction with the approved third party laboratory team.

2009 to 2011

Prosperous Qatar W.L.L (Contractor)

Period

:

September 14, 2009 to December 22, 2011

Position

:

Project Engineer

Project Titles

:

Concrete Tank Foundation (Ring type foundation)

:

Paving at Analyzer house and Access at SS & SIH areas

:

Parking lots for Shuttle Vehicle

:

Installation of Road Blocker at RAS GAS main gate

:

Drain Ditch Hazard Protection

Project Value

:

QR 10 Million (Total Estimated Cost)

Project Duration

:

18 Months

Client / End User

:

Ras Gas Company (RLIC)

Contractor

:

Madina Group W.L.L ( Sub-contractor Prosperous Qatar W.L.L )

Responsibilities

Reporting directly to the operation manager and to the chief executive officer regarding the progress and development or the project.

Control, Plans and programs all construction activities inside the plant area.

Responsible for the preparation of all permits including hot and cold permit (PTW) prior to preced the site activities inside the plant area.

Responsible for the preparation of method of Statements or MS for the certain project activities inside the plant area.

Directly supervises the entire construction activities inside the plant area.

Responsible for the requirements and distribution of the equipment and manpower for the project inside the plant area.

Responsible for the health, safety and management system during the entire period or duration of all construction activities the plant area.

Monitor daily activities and coordinate directly with the site engineer assigned in the particular area in relation with the progress and ongoing avtivities inside the plant.

Represent the company during the meetings with the client in relation to the project development and progress.

Responsible for the preparation of daily, weekly and monthly reports and shall be submitted to the operation manager for the development on the ongoing construction accomplishments.

Responsible for the accuracy in term of the application and installation of the materials being used such as reinforcement bars, bar bending schedules, cutting and splicing of rebards, fixing of formworks, scaffoldings and other related materials to be used in construction.

2006 to 2009

Al Masaood Bergum – Doha Qatar (Contractor)

Period

:

October 14, 2006 to August 31, 2009

Position

:

Site Engineer

Project Title/s

:

Temporary Site Offices at NDIA Projects ( QDVC, Eversendai)

:

Permanent Double Storey Site Offices for LRT Lusail Project

:

Camp Site Facilities for all Staff and Company Workers ( Sinohydro-Gamuda JV)

:

Camp Site Facilities for all Staff and Company Workers ( Midmac Contracting)

:

Temporary Site Offices and Joint Cabins ( Al Seal Contracting)

:

Dismantling, Relocation and Reassembly of Temporary Site Facilities

at Mesaieed City (Qatar Dredging Company)

:

Temporary Site Offices and Joint Cabins ( Al Nakheel Agriculture and Trade)

:

Temporary Site Offices including Hospital and Parking Area (Hyundai Eng’g)

:

Temporary Camp Facilities for Senior and Junior Staff (CBI)

Project Value

:

QR. 30 Million(Total)

Client/End User

:

As mentioned above

Contractor

:

Al Masaood Bergum

Responsibilities

Supervises all site activities such as construction and installation of portable cabins made of Light Gauge Steel Frames materials and Wooden Frames materials for temporary accommodation of staff and workers facilities, Installation for temporary site offices and facilities of the construction firm, including earth works such as excavation, levelling and compaction, embedded structures, pluming, surveying and other related works in the construction.

Conduct actual site survey, materials estimates and quantities prior for construction implementation and installation on the acquired site locations.

Coordinate with the client and sub-contractors if any for the project site acqiured location and implementations of the project.

Coordinates with all parties including client and Sub-contractors regarding the progress of the project including additional works, variation orders, relocation and reinstallation of portable cabins and other related work activities.

Responsible for the manpower requirements on the particular project location as well as the safety and orderliness of all personnel and other works relating to the construction of the portable cabins.

Responsible for the maintenance work for all supplied and installed pre-fabricated portable cabins of entire site in doha city.

1995 to 2005

SIT / French Telecom System Inc., Philippines (Contractor)

Period

:

September 16, 1995 to April 20, 2005

Position

:

Project Site Engineer

Project Title

:

DIGITEL GSM 1800 PROJECT

Project Value

:

50 Million Pesos

Project Duration

:

Jan. 2002 – Sept. 2005

Client/ End User

:

Digital Mobile Philippines, Inc.

Main Contractor

:

Bosch Telecom company (Germany)

Project Title

:

OPS-PIA PROJECT – French Protocol ( Phil. Administrative Network)

Project Value

:

5 Million Pesos

Project Duration

:

Jan. 2002 – August 2002

Client/ End User

:

Office of the Press Secretary (Philippine Government project)

Main Contractor

:

SAGEM PHIL. (SA – France)

Project Title

:

NATIONAL TELEPHONE PROGRAM (NTP 1-2 Stage 2)

Project Value

:

40 Million Pesos

Project Duration

:

June 1998 – February 2002

Client / End User

:

Department of Transportation and Communication

Main Contractor

:

Bosch Telecom company (Germany)

Project Title

:

GLOBAL MARITIME DISTRESS AND SAFETY SYSTEM (GMDSS)

Project Value

:

30 Million Pesos

Project Duration

:

April 1999 – February 2000

Client / End User

:

Department of Transportation and Communication

Main Contractor

:

Alcatel Philippines Inc.

Project Title

:

TELETECH LEC PROJECT

Project Value

:

8 Million Pesos

Project Duration

:

November 1997 – May 1998

Client / End User

:

Easter Telecom Philippines, Inc.

Main Contractor

:

Alcatel Philippines Inc.

Project Title

:

RCPI PROJECT (Implementation of IRT 2000 System in the Philippines

Project Value

:

8 Million Pesos

Project Duration

:

December 1995 – March 1996

Client / End User

:

Radio Communication of the Philippines

Main Contractor

:

TRT – Lucent Technologies

Project Title

:

NATIONAL TELEPHONE PROGRAM (NTP 1-2 Stage 1)

Project Value

:

35 Million Pesos

Project Duration

:

April 1995 – June 1997

Client / End User

:

Department of Transportation and Communication

Main Contractor

:

Bosch Telecom ( Germany)

Responsibilities

Supervises the entire fabrication of the tower members for self-supporting towers, Guyed towers from the approved fabrication plant as per design and specification.

Supervises the Installation and Erections of self-supporting legged towers including guyed towers, Fixing and installations of all type of antennas, Beaconing lights and Grounding cable installations.

Supervises all civil works for the construction of relay station buildings, Sub-station building, foundation of self-supporting towers, guyed tower foundations, equipment and Generator set foundations including cabin shelter installations.

Coordinate with fabricator, sub-contractors, and client as well as the suppliers for the progress and development to the project.

Supervises for the installation of cables, paintings works and bolts torqueing activities on the erected telecommunication towers.

Reporting directly to my area manager or regional manager for the development and progress of the project.

Attend meetings as required and generally ensure the sub-contractor’s compliance towards the progress as per project specification and contract requirements.

Responsible for the safety and orderliness of all personnel and other work related to infrastructures for telecommunication project.

Responsible for all materials requirement, equipment and man power distribution to respective site location in the area.

Responsible for the preparation of the necessary correspondence with respect to the financial expenses at the entire sites.

1993 to 1995

CWTan Manufacturing, Philippines

Period

:

September 27, 1993 to September 15, 1995

Position

:

Senior Plant Supervisor for Fiber Glass Fabrication

Project Title

:

Fiber Glass Manufacturing (Fabrication,Supplies and Installation)

Responsibilities

Supervises all fabrication works on fibre glass from different division such as Apollo and Filament Water Tank division, Mold Making division, Capentry division, Painting and finishing division and Engineering division for steel fabrications.

Responsible for the incoming and outgoing materials to ensure that all intended materials or items for deliveries are in good quality and in good conditions.

Coordinate with all division heads and section heads for possible production accomplishment and servicing works for all respected clients.

Supervises all field works activities such as excavation, backfilling, compaction, formworks installation, steel fixing and concreting works for the elevated water tank foundation and erection of the steel structural tower for elevated water tank.

Conduct actual site survey prior for the construction of steel tower for elevated water tank concrete foundation and checking necessary materials requirements for elevated water tank.

Coordinate with the client or owner with regards to the validity of the required permit documents for the construction works and the availability of the access of the location prior to the construction activities.

Coordinate with the main office personnel in charge regarding the possible order / change order / site services prior for the deployment of the service crew personnel to the location.

Responsible for the daily production reports, accomplishment reports as well as the monthly inventories reports of products being fabricated and installed by the skilled workers.

1991 to 1992

R.D. TUAZON CONSTRUCTION CORP., Philippines (Contractor)

Period

:

May 1, 1991 – Sept. 30, 1992

Position

:

Assitant Project Engineer

Project Title

:

Rehabilitation Project from MWSS

Project Value

:

3.5 Million Pesos

Project Duration

:

20 Months

Client/ End User

:

Manila Water and Sewerage System

Main Contractor

:

R.D. Tuazon Construction Corporation

Responsibilities

Supervises all installation works for the water pipes being connected by the skilled pipe fitters.

Responsible in securing and preparation of work permits from the engineering city government office prior to start the work activities.

Prepare assessment reports of the job being performed by the skilled construction workers and the pipe fitters.

Responsible for the weekly accomplishment reports for the billing purposes.

Coordinates with the client (Manila Water and Sewerage System) inspectors regarding the progress or activities status of pipes installation, excavation and the coordinate’s location with both head office personnel and MWSS personnel for billing and collection purposes.

Coordinate with the government official in the location or area where we are conducting the relocation works activities prior the coordination with the workers.

Perform day to day quality control inspection for construction activities and maintain records.

Responsible for day to day timesheets records for all workers at site and coordinate with the HR department.

1988 to 1990

D.D.COMENDADOR CONSTRUCTION CORP., Philippines (Contractor)

Period

:

May 01, 1988 – May 31, 1990

Position

:

Road Constraction Engineer / Field Engineer

Project Title

:

Taft – Oras Road Constraction (Phase – 1)

Project Value

:

18 Million Pesos

Project Duration

:

12 Months

Client / End User

:

Department of Public Works and Highways (Region 8)

Main Contractor

:

D.D.C. Construction Corporation

Responsibilities

Responsible in conducting road survey and plotting the data gathered from the

survey which includes the traverse and profile leveling survey.

Supervises all field works such as preparation of the road bedding, installation of

steel dowel and wooden formworks supports, compaction and leveling works of

gravel bed prior concrete pouring.

Supervises the entire road activities including concrete pouring works. Curing, earth woks, hauling of backfill materials, material testing, FDT activities and

other related materials works.

Prepares daily assessments reports of the job performance of road construction personnel including the daily time records.

Plan daily activities with regards to the road construction activities of skilled construction personnel as well as to report the defect from the construction.

Coordinate with Department of Public Works and Highways personnel with

regards to the testing of materials and the Field Density Test (FDT) as well as the concrete cube sample test.

Assist the Senior Engineers in the inspection of the permanent works including delivery of materials to verify if it conforms with contract quality requirements as well as the testing and commissioning works.

Additional Information;

Address : #36 block 18 Multinational Village Phase IV, Paranaque city

Tel no : +632*******, +639*********, +974********

E-mail : actgo0@r.postjobfree.com



Contact this candidate