Post Job Free

Resume

Sign in

Engineer Project

Location:
Singapore, Singapore
Posted:
February 09, 2016

Contact this candidate

Resume:

RESUME

JAY S. MONTESCO

Block ***, **-** Hougang St 51

Singapore 530569

Email: actgkd@r.postjobfree.com

Mobile#: +659*******

I.GOALS AND OBJECTIVES :

To help company meet their goals and be successful while holding the position of a HVAC Project Engineer and develop my potentials to incorporate new and unique ideas for the company and adhere to the company’s vision through a commitment of service, integrity and teamwork.

II. QUALIFICATION SUMMARY :

I am a licensed Mechanical Engineer who underwent diversified training in the fields of Mechanical Engineering construction and design. I had quite an exposure to Construction Management as brought about by my work experience in Saudi Aramco Total Refinery Plant Project (SATORP) Saudi Arabia and Singapore.

III. KNOWLEDGE AND SKILLS :

E-SPIR 2000 Version 7/ Advisor program version 7.2

Autocad

Microsoft Excel and Word

Microsoft Outlook

Power Point Presentation

Familiar on Piping and Instrumentation Diagram (P & ID) drawings

Familiar with Process Flow Diagram ( PFD )

experience in Saudi Aramco Total Refinery Plant Project (SATORP) Saudi Arabia.

Experience in A & A Construction Singapore

I used my ability and knowledge on how to demonstrate the worker during installation at site.

I give to the worker the correct and latest drawing for installation at site.

IV. LANGUAGE SKILLS :

ENGLISH : Read, Write and Speak

Accomplishments :

I am working under pressure to complete the project before the deadline schedule.

V. WORK EXPERIENCE :

1.0 NAME OF COMPANY : KIN XIN ENGINEERING PTE LTD

21 Ubi Road 1, #02-02

Singapore 408724

POSITION : PROJECT ENGINEER

SCOPE OF WORK : ACMV SYSTEM

INCLUSIVE DATE : APRIL 2015 UP TO PRESENT

DUTIES AND REPSONSIBILITIES :

Study and Review Preliminary Design and Construction drawings prepared by the Architects and Consultants.

Raise Request For Approval / Information (RFA/RFI) for any discrepancy on between Tender design and working drawing given by consultant and Architect.

Prepare documents for Material submission for Consultant Approval.

Prepare Equipment schedule, installation details for consultant review and approval.

Re-design the system based on site condition if required.

Attend Consultant, Site Coordination and Progress meeting.

Site survey for progress installation on site.

Prepare for Material and equipment ordering for site installation.

Submit shop drawing to Consultant for Review and Approval.

Prepare sample board material for physical approval by consultant.

Prepare for Material take off.

Prepare monthly progress claim for work done on site.

2.0 NAME OF COMPANY : UNI ENGINEERING PTE LTD

Block 1046 #01-145, Eunos Ave. 5

Singapore 409746

POSITION : PROJECT ENGINEER

SCOPE OF WORK : ACMV SYSTEM

INCLUSIVE DATE : APRIL 2012 UP TO March 2015

DUTIES AND REPSONSIBILITIES :

Coordinates and Review Preliminary Design and Construction drawings prepared by the Architects and Consultants.

Reporting to General Manager.

Study detailed Specification, Drawing, Scope of Work & Applicable standards.

Preparation of Construction Drawings ( Shop Drawings ) & Submittals.

Taking out BQ for preparation of Quotation.

Preparation of Work Schedule & Mobilization of technician team at site.

Review Tender documents & Construction document for the variation work order.

Estimation of tools & equipment, material and items to install as per Approved Drawings and Submittals.

Preparation of material submittal, Shop drawings, Method Statements.

Installation and commissioning of field devices like Thermostat, Valve actuators, Temperature controllers, Temperature sensors, Flow switch, Flow sensor, Differential pressure Sensor and and etc for the Building Management Systems.

Checking of builders work drawing for the wall and slab openings.

Installation of HVAC Equipments like Chillers, Pumps, AHU’s, PAHU’s, FCU’s, Fans associated with Chilled Water Pipes & Air Ducts.

Carry out inspections of equipments and material with consultants.

Checking the quality of workmanship in the installation of equipments, piping and ducting in the various stages to ensure that the work is completed with close-coordination of other services and with given standards.

Co-ordination with third party Testing & Commissioning contractor to the Air & Water balancing of all HVAC systems in entire project up to the level of Consultant approval.

Coordination with other MEP services & Civil Construction site.

Analyze problems occurring during equipment performance testing.

To prepare the material take-off needed for the installation of Chillers Plant room.

Coordinate with the sub-contractor to ensure smooth work flow for installation process.

Attend coordination meeting to ensure all the drawings and specification are according to standard procedure. And report to General Manager if any variance between the work constructed and the tender design drawing.

At the same time to ensure all the workers are follow the rules and regulation for the Safety required on site during installation process.

Coordinates with Main contractor for the new installation and obstruction at site.

To ensure that the detailed design drawing are approved by consultant before to do any installation works to minimized rejection.

To ensure that after installation of ACMV system to check the ceiling height requirement are complied.

Supervised at site and ensure all work are as per standard requirement.

Monitor and keep tracking for the list of Design drawing to be submitted to site for construction

Plan and prepare daily schedule for work installation at site jobs.

3.0 NAME OF COMPANY : MOHAMMED RASHID

AL-KHATHLAN COMPANY

P.O BOX 3893, DAMMAM-31481

KINGDOM OF SAUDI ARABIA

(SAUDI ARAMCO TOTAL REFINERY & PETROCHEMICAL PROJECT)

POSITION : MECHANICAL ENGINEER &

SPDP/ESPIR2000 COORDINATOR & HVAC ENGINEER

SCOPE OF WORK : MECHANICAL DEPARTMENT

INCLUSIVE DATE : AUGUST 2009 TO FEB. 06, 2012

DUTIES AND REPSONSIBILITIES :

Coordinates with Main contractor for the new installation and obstruction at site.

To ensure that the detailed design drawing are approved by consultant before to do any installation works to minimized rejection.

To ensure that after installation of ACMV system to check the ceiling height requirement are complied.

Coordinate with designers, architect and owners representatives on pending work item issues

Reviews issued plans and prepare RFI’s (Request for Information) for every conflict/discrepancies between Architectural, Structural and M.E.P. Plans.

Prepare daily schedule for work installation at site jobs

Coordinates with workers and subcontractors

Provide and prepare various design documents such as HVAC, Plumbing, Fire Protection System and Piping Installation Details, layout for hook up for piping connection.

Facilitate design coordination between the vendor and engineering team

Make actual layout for equipment foundation.

Assist in fabrication team for the layout of piping and ducting works.

Supervised at site and ensure all work are as per standard requirement.

Monitor and keep tracking for the list of Design drawing to be submitted to site for construction

Evaluates progress of work against the work schedule as agreed with contractors.

Prepares and submits Construction Report and Work Evaluation Report based on actual accomplishment.

Monitor, track/control manpower work progress at jobs site

Keep field records such as: Jobsite logbook, shop drawings, monitoring, contract documents, minutes of meetings, as-built information and correspondence.

Punch listing of Balance of Works prior to turn over

Handle all inspection works of the contractors prior to use and installation of materials in the construction.

Coordinate to the Project Manager/Owner or to the Design Professionals regarding the status of the project.

E-SPLIR 2000 COORDINATOR :

Familiar with spare parts procedure, spare parts recommendation strategy, and spare parts treatment sequencing.

Expedite vendor for the release of SPIR in advance.

Coordinates with the procurement, NMR, construction progress, and interface with other discipline.

Creates SPIR in excel form for vendor template.

Using program E SPIR 2000 version 7 and Advisor program version 7.2.

Takes charge of the preparation of Spare Parts List Interchangeability Records (SPLIR or Shell E SPIR 2000) for every systems/subsystems

Coordinates with MIEC(Maintenance, Inspection, Engineering Contractor by SAIPEM) for approval of E-SPIR 2000.

Report weekly and monthly progress to PM.

Follow up to the vendor for the requirement of SPDP/E-SPIR for the review and prior to submit MIEC (Maintenance, Inspection, Engineering Contractor by SAIPEM)-Spare Parts Team for the Approval.

QA/QC ENGINEER:

FOR SPARE PARTS DATA PACKAGE (SPDP):

For the Spare Parts Data Package ( SPDP ) check and review first the spare parts before uploaded to the supplier and advisor program.

If there is some missing items for the spare part send it back to the vendor to incorporate all the missing spare parts item.

Prepare and check the supporting documentation for the Spare Parts Data Package (SPDP) before we send to the client.

After all the spare parts are uploaded in the Supplier and Advisor we will check if all data are correct and prepare ASCII File to send in the client together with the supporting document for the review and approval for the client.

FOR HVAC/PIPING:

During the construction time before we start the fabrication and installation at site we will prepare the Request For Information ( RFI ) to the client to inspection if it is approve or not.

Check the materials delivery and prepare to raise Request For Information (RFI ) to the client for the inspection.

Check the material if it is Hazardous or Non-Hazardous for the safety of people working at job site area. If the material is Hazardous we will prepare the Material Safety Data Sheet (MSDS) that workers are know this material is dangerous.

Check the material and quantity as per delivery if it is as per standard requirement for the client.

Check the quality for the on going installation at job site area if it is as per standard requirement.

Check also the design for Issued For Construction if during the installation and erection are not following the standard.

Prepare hydro-test for Piping works.

4.0 NAME OF COMPANY : ENERTHRUST INCORPORATED

G/F Perla Comse bldg. # 26 Stanford Street Cubao, Quezon City

POSITION : Project In-Charge

SCOPE OF WORK : Plumbing, Fire Protection and

HVAC Installation

INCLUSIVE DATE : October 2007 up to July 2009

DUTIES AND REPSONSIBILITIES :

Handle all inspection works of the contractors prior to use and installation of materials in the construction.

Attend the site coordination meeting for all the Contractor and Sub-contractor to solve and discuss site pending issue.

Coordinate with designers representatives on pending work item issues.

Monitor, track/control manpower work progress at jobs site

Punch listing of Balance of Works prior to turn over.

Keep field records such as: Jobsite logbook, shop drawings, monitoring, contract documents, minutes of meetings, as-built information and correspondence.

Punch listing of Balance of Works prior to turn over

Handle all inspection works of the contractors prior to use and installation of materials in the construction.

5.0 NAME OF COMPANY : Jaca Contruction and Management Construction

Toledo, Cebu

POSITION : Project In-Charge

SCOPE OF WORK : Plumbing and Sanitary Works

INCLUSIVE DATE : May 2006 up to October 2007

DUTIES AND REPSONSIBILITIES :

Coordinate to the Project Manager/Owner or to the Design Professionals regarding the status of the project.

Attend the site coordination meeting for all the Contractor and Sub-contractor to solve and discuss site pending issue.

Handle all inspection works of the contractors prior to use and installation of materials in the construction.

Coordinate with designers and owners representatives on pending work item issues

Monitor, track/control manpower work progress at jobs site

Punch listing of Balance of Works prior to turn over

Keep field records such as: Jobsite logbook, shop drawings, monitoring, contract documents, minutes of meetings, as-built information and correspondence.

Punch listing of Balance of Works prior to turn over

Handle all inspection works of the contractors prior to use and installation of materials in the construction.

Coordinate to the Project Manager/Owner or to the Design Professionals regarding the status of the project

PROJECT REFERRENCE:

Dulwich College Project

Bukit Batok West Avenue 8, Singapore

CET East Campus Project

Avenue 5 Paya lebar, Singapore

Hotel Phoenix Specialist Centre Project

Orchard Road, Singapore

Additional & Alteration the HEEREN

260 Orchard Road, Singapore

SAUDI ARAMCO TOTAL REFINERY PROJECT

Jubail, Kingdom Of Saudi Arabia

LEXMARK PLAZA TOWER 1 CEBU PROJECT

Industrial Building

Twenty-Three (23) Storey Building

Cebu Business Park, Mabolo, Cebu City

THE PERSIMMON TOWER 1-4 CEBU PROJECT

Residential Condominium

Fifteen (15) Storey Building

Mabolo, Cebu City

ROBINSON CYBERGATE CENTER PROJECT

Ten (10) Storey Building (2 Storey Mall and Commercial Center)

Don Gil Garcia, Fuente Osmenia Ave. Cebu City

VI. PERSONAL INFORMATION

1.0 Nationality : Filipino

2.0 Date of Birth : September 16, 1983

3.0 Age : 32

4.0 Gender : Male

5.0 Status : Married

6.0 Height : 170 cm

7.0 Weight : 55 kg

8.0 Fin No. : G5275452L

9.0 Passport No. : EC3769195

VII. EDUCATIONAL BACKGROUND :

COLLEGE - Bohol Island State University –

Tagbilaran City Main Campus

North Avenue Tagbilaran City

Degree: BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

2000-2006

SECONDARY - Dr.Cecilio Putong National High School

North Avenue Tagbilaran City

1996-2000

ELEMENTARY - Cabawan Elementary School

Cabawan District Tagbilaran City

1990-1996

VIII. EXAMS TAKEN :

Board Examination for Mechanical Engineer - APRIL 2008 Passed

IX. AFFILIATION :

Philippines Society of Mechanical Engineers (PSME)

Member, 2008 up to present

X. CHARACTER REFERENCES :

1.0William Chua

Director

Uni Engineering Pte. Ltd

+659*******

2.0TECK YONG NG

Director

Parkwell Engineering Pte. Ltd

A & A HEEREN Project

+658*******

3.0ENGR. ERLINDO PALAGANAS JR.

Construction Manager

Jubail, Kingdom Of Saudi Arabia

Muhammad Rashid Khathlan Co. (MRK)

+966*********

XI. SINGAPORE CERTIFICATE :

1)BCSS – Building Construction Safety Supervisor

2)WAH - Working At Height Supervisor



Contact this candidate