BRIAN NICHOLLS RESUME

****A Highway * - # *** Sugar Land, TX 77478 cell - 713-***-****

actexb@r.postjobfree.com Page 1 of 5

Objective

To utilize my overall 40 years’ experience in Project Management, 28 plus years in Project Controls/Estimating and 12 years in on-site construction supervision, finance and computers as a basis for a career position in Engineering and Construction management.

Technical Software Proficiency

• Primavera 6 Ver 8.x) - Expert, 6 Plus Years – Primavera Subject Matter Expert (SME)

• Primavera Project Planner(R) (P3.1c) - Expert, 20 Plus Years,

• SureTrak(R) Project Manager (SureTrak(R)) - Expert, 10 Plus Years,

• Primavera Expedition/ Project Manager(R) - Expert, 10 Plus Years,

• MS Project - Advanced, 10 Plus Years,

• MS Office Pro - Word, Excel, PowerPoint & Access - 25 Plus Years. Professional Experience

09/2015 to Present Nicholls Consulting Services Sugar Land, TX Independent Project Controls Consulting & Expert Witness Services – Primavera Subject Matter Expert – (SME)

• Providing Consulting Services and Expert Witness Analysis in all aspects of Project Controls Cost and Scheduling Services utilizing Primavera P6 and Microsoft Project 2007, 2010 & 2013.

• Services provided to Oil & Gas, Power Transmission & Delivery, Power Generation, Industrial Services, Vendor Fabrication & Delivery, Earthmoving - Roadways & Utility Industry, Land Use/Planning and Commercial Building Construction.

• Actively seeking Expert Witness Analyst for Project Controls, Estimating and Project Management, Construction Management work as either 1099 or W-2.

• Willing to travel for extended periods of time and potential for relocation for the right position/project. 02/2015 to 09/2015 AECOM/URS White Plains, NY

Project Controls Manager – New York Power Authority Owners Rep.

• Project Controls Manager & Owners Rep for $700M Systems Upgrade for St Lawrence District BaRR & TLEM Program Development/Management & Detailed Schedule development for $700M Program Upgrades covering a 25 year duration. Client Representative in White Plains, NY for 4 months.

• Primavera 6 Program Level Schedule Development & Maintenance covering 6 Major Project schedule integrations and Microsoft Project – 2 year rolling Level 4 Detail schedule creation and management with the Client Engineering, Procurement and Construction resource loaded schedule for client personnel usage and individual management.

• Integration of MS Project detail information into the Program Level 2 Detail schedule management. 07/2011 to 02/2015 CH2M Hill Houston, TX

Project Controls Manager – Primavera 6 SME

• Project Controls Manager – EPCM Power Group – New Your Power Authority (NYPA) Transmissions and Distribution Upgrades – BaRR & TLEM Programs. Program Development/Management & Detailed Schedule development for $700M Program Upgrades covering a 25 year duration. Client Representative in White Plains, NY for 7 months.

• Project Controls Manager - Program/Project/Risk Recovery Troubleshooter o Provided hands-on solutions to financially distressed and underperforming projects to help Corporate & Project Management to overcome operational, financial, and organizational challenges, o Successfully recommended and reported upon areas for turnaround businesses to sustainable operation for successful project completion,

o Applied expertise to assist Corporate & Project Management through troubled projects viability assessments, o Recommended analysis for actions regarding project services, asset recovery, due diligence assessment, forensic claims analysis and change order management.

• EPC - Project Controls Manager & Primavera Subject Matter Expert (SME) for Energy & Chemicals O&G Divisions responsible for development and maintenance of Project Controls Systems for; o Implementing Division Policies/Procedures and QA/QC requirements, o Primavera P6 ver 8.x Training & Standardization for Schedule Development & Maintenance, o SME – Management of Rights & Responsibilities for all Divisional licensing and Primavera access, o Global & Enterprise Database Management of all Primavera Systems and initial project setup for WBS/COA implementation and integration,

o Cost Reporting/Tracking/Earned Value Integration into all Project Controls systems and compliances, o Lead forecasting/reporting of cost/schedule performance throughout project life cycle, BRIAN NICHOLLS RESUME

3350A Highway 6 - # 307 Sugar Land, TX 77478 cell - 713-***-**** actexb@r.postjobfree.com Page 2 of 5

o Assists project team in resolution of issues involving cost, schedule, & change controls, o Define and support common methods & standard reporting format for all corporate, program and project reports, o Allocate appropriate level of project controls staff and as necessary implement financial controls processes in compliance with the departmental and project internal cost control policies and objectives, o Assist Program & Project Management with respects to insure that all departmental and project wide objectives were in line with established QA/QC Policies and Audits, o Assist Project Management in incorporating all relevant cost management procedures and reporting requirements where appropriate on Owner, In-house, Vendor, Contractor and Sub-contractor’s scope of services were timely and accurate,

o Report project standing to management as well as analyzing cost and schedule variances, recommending and implementing corrective actions,

o Proficiency in schedule creation/management and cost engineering principles and methods including;

Earned Value Systems setup and monitoring,

Budgeting and Forecasting,

Change Management Systems / Procedures,

Work Breakdown Structures (WBS) / Code of Accounts (COA) compliance and implementation,

Contingency allocation,

o Provide exceptional analytical skills for effective evaluation of project and discipline or individual performance in compliance with program and project objectives,

o Provide requisite interpersonal and communication skills to interface with and relate complex concepts/issues with all program and project levels.

o Excellent leadership, mentoring and team work skills with the ability to effectively transfer technical expertise to less experienced project control professionals,

o Ability to work under minimal supervision and effectively manage multiple/changing priorities.

• Project Controls Manager on Greenfield Fertilizer Program from Pre FEED to EPC responsible for all development of the Program/Project Controls Systems as outlined above.

• SR Project Controls Specialist Planner/Scheduler responsible for EPC/EPCM Planning and Scheduling of a major Capital Improvement projects out of the Houston Office for the E&C division as outlined above. 10/2009 to 06/2011 The Shaw Group Houston, TX & Robinson, IL SR Project Controls Planner/Scheduler 4

• SR Project Planner/Scheduler responsible for Construction Planning and Scheduling of a major Capital Improvement project for Marathon Petroleum Company in Robinson, IL.

• Responsibilities include management and maintenance of overall Project Construction Schedule, weekly updates and reports to all interested parties.

• Managing and maintaining nine (9) separate Subcontract Schedules and integration/updating sub-contract schedules into the Project Schedule.

• Responsibilities included daily dialog with Project Management, Client Staff, Engineering, Purchasing, Sub-Contracts and Site Project Superintendents to insure accurate representation of all Schedule information.

• Maintenance & Updating of Baseline and RE-Baseline data as required according to Project Management directives. 2/2007 to 9/2009 Mustang Engineering L.P. Houston, TX SR Project Controls Planner/Specialist

• Responsible for Planning, Scheduling and Cost Controls on various Mustang Engineering Capital Improvement for the Midstream, Downstream and Pipeline petrochemical projects in varying stages of planning, development, implementation at the corporate office.

• Responsibilities included daily dialog with Project Management, Client Staff, Engineering & Drafting, Purchasing and Project Sites to insure accurate representation of all Schedule information.

• Integrated and impacted all field schedules with overall project schedule. 2/2006 to 2/2007 CB&I The Woodlands, TX

Project Controls Planner/Scheduler & Cost Controls Specialist

• Responsible for Planning, Scheduling and Cost Controls on various Mustang Engineering Capital Improvement for the Midstream, Downstream and Turnaround petrochemical projects in varying stages of planning, development, implementation at the corporate office.

• Responsibilities included daily dialog with Project Management, Client Staff, Engineering & Drafting, Purchasing and Project Sites to insure accurate representation of all Schedule information.

• Integrated and impacted all field schedules with overall project schedule. BRIAN NICHOLLS RESUME

3350A Highway 6 - # 307 Sugar Land, TX 77478 cell - 713-***-**** actexb@r.postjobfree.com Page 3 of 5

2/2004 to 11/2005 Capital Excavating Inc. Chandler, AZ Civil Construction Estimator/PM

• Responsible for all aspects of the estimating process from finding new clients and coordinating the takeoffs, quantifying the required materials and associated values, defining the scope of work for all aspects and pricing of the estimates according to established company procedures.

• Developed and implemented the Estimating Spreadsheets for the gathering of all data for each estimate and subsequent pricing and relative markups for owned equipment, rented equipment, material purchases and all subcontractor work.

• Assisted in all aspects of Project Management from coordinating the startup of new projects, purchasing of materials, subcontractor management, schedule design and maintenance, coordinating owned and rental equipment and manpower, reviewed invoices for correctness and value, processed and assisted in the billing/invoicing of the ongoing work.

1/2003 to 2/2004 Edward Kraemer & Sons Phoenix, AZ. Project Controls Engineer

• Responsible for planning and tracking contract schedule via Primavera P3 scheduling software on all associated work on SR51 Design Build HOV Lanes. Original Contract Value $ 75,680,003. Change Order Value $ 8.8 Mil plus.

• Responsible for the accurate distribution of pertinent information related schedule to all project participants. This included negotiations with owners, subcontractors and vendors to take work from design intent to completed product.

• Directly involved in Cost Control measures including assisting Change Order Management and pricing of additional work as they relate to contract values and new values for each Change Order.

• Responsibilities include the preparation of the monthly billing and defending the value requested.

• Assisting in the tracking of vendor deliveries and subcontractor installed quantities for progress payments and stored materials requests.

3/2002 - 10/2002 TMP Worldwide/Shaw Constructors, Inc. Granbury, TX. Project Controls – Project Planner

• A.E.S. Granbury L.L.C., Wolf Hollow Power Plant (NG)

• On March 7, 2002 the plant owner, A.E.S. Granbury L.L.C., fired NEPCO and Shaw Constructors Inc. and Stone & Webster, part of the Shaw Group, were brought in to complete the construction of the plant.

• I rebuilt the entire schedule and cost controls programs from scratch out of Excel Spreadsheets and Access Databases then transferred this data to the Primavera P3 Schedule I was re-creating from scratch.

• Updated P3 schedule on a daily basis with information provided from the field to a “Level 4” for detail and reported progress to management on a daily basis. Integrated spreadsheets and databases to schedule for daily updating. All activities were fully resource loaded.

• Attended multiple daily meetings for progress review with Field Supervision & Foremen as well as Project Management and Sub-contractors. Provided all reference materials for meetings.

• As required by problems encountered in the field and design changes, the schedule logic was changed multiple times and additional activities were added to the construction portion and to the commissioning portion of the schedule. 12/2001 - 3/2002 Vilinc Solutions, Inc./ NEPCO Granbury, TX. Contract Controls – Schedule Consultant

• A.E.S. Granbury L.L.C., Wolf Hollow Power Plant (NG)

• Consultant on 750 MW 2x1 Combined Cycle (NG) Power Plant utilizing Primavera P3 software. Responsible for fixing the existing schedule and accurately portraying the delays to the contract as well as expanding the activity base and maintaining the schedule updates.

• Responsibilities included working with each of the 12 superintendents, 4 site engineers, 6 offsite engineers and home office personnel to define each sphere of influence and responsibility.

• Set up the format for the weekly reporting of progress in the field and in the design for ease of updating the schedule.

• Conducted site visits to verify the progress reporting and compared the daily reports and time card reports the progress as reported for schedule updates.

• Managed the weekly schedule meetings with appropriate personnel, imputed the information into P3 and reviewed the information with project executives.

• NEPCO was the construction arm of Enron and when Enron filed for bankruptcy in Dec-2001 NEPCO was given 90 days to Bond the completion of the project or be fired. NEPCO failed to Bond the project and was fired.

• NEPCO took all relevant information including the Integrated Project Schedule I created when they left the site. 10/2002 - 1/2003 Nicholls Consulting Services Granbury, TX & Houston, TX 11/2000 - 12/2001 Nicholls Consulting Services Orlando, FL. & Tucson, AZ. BRIAN NICHOLLS RESUME

3350A Highway 6 - # 307 Sugar Land, TX 77478 cell - 713-***-**** actexb@r.postjobfree.com Page 4 of 5

Scheduling and Documentation Consultant

• Consultant on Commercial, Residential and Heavy Civil/Infrastructure contracts using state of the art computerized scheduling and documentation control software from Primavera Systems. Expert in Primavera P3, SureTrak and Expedition. Over 10 years’ experience in the use of Primavera software.

• Marketed construction related software programs in Scheduling, Documentation Control, Estimating and Job Cost Accounting to companies and trained appropriate personnel in the usage of the programs. Prepared and maintained software systems and training when changes in the software updates required additional training. 1/1998 – 11/2000 Valley Crest a division of Environmental Industries Orlando, FL. Project Engineer and Estimator

• Responsible for the accurate distribution of pertinent information related to the project assignment. This included negotiations with owners, subcontractors and vendors to take work from design intent to completed product for hardscape, rockwork, landscape and irrigation on multi-million dollar high visibility contracts in Orlando, Florida at Universal Studios and Disney sites. Responsibilities included computerized documentation control and scheduling using CPM to keep control of information and progress.

• Directly involved in Cost Control measures including Change Order Management and pricing of directive work as they relate to contract values and new values for each directive.

• Purchasing and procurement of materials for the original contract and directive work with timely delivery of materials for installation according to contract schedule.

• Estimating responsibilities included the development of all costs and sales pricing for all Change Order/Directive work for each contract/subcontract and preparation of cost data and final estimates for Project Management review and approval. High functional efficiency in computerized environments and estimating programs as well as development of spreadsheets for pricing, tracking and manipulating costs and values. As comfortable working in strictly estimating environments not directly related to specific contracts and directives.

6/1997 – 1/1998 Beers Construction Company Orlando, FL. Project Scheduler

• Responsible for planning and tracking contract schedule via Primavera P3 scheduling software on all associated work on the Marvel Superhero Island contract at Universal Studios Islands of Adventure, (UIOA). Project included sitewide underground utilities, seven multi-use buildings, roller coaster and interracial colored hardscape concrete work. Created schedule and daily maintenance of information from field as to progress. Gathered all pertinent information from field and office supervision to create weekly reports used at weekly progress meetings with owners and subs. Contract value $32,000,000.00 +/- not withstanding change orders.

5/1994 – 6/1997 Johnson Bros. Corporation Orlando, FL. Contract Controls/Project Scheduling Supervisor

• Responsible for planning and tracking a Combined Cycle (Coal-Gasification) Power Plant via P3 all associated work on the Sitework contract for TECO Polk Power Station Unit1. Maintained on a daily basis all information from the field regarding progress and materials delivery. Created the weekly and monthly reports required for weekly and monthly meetings with owners and subcontractors. Sitework contract value $33,500,000.00

• Responsible for the creation and administrative oversight of the project schedule for the Civil contract for TECO Polk Power Station Unit1. Original contract value $12,400,000.00 +/- ending contract value $15,600,000.00 +/- in six months.

• Responsible for the planning and tracking via P3 all associated work on the Infrastructure Sitework contract at Universal Studios Island of Adventure. Project included Mass Excavation, Import Borrow, Underground Utilities

(sanitary sewer, storm water drainage, chilled water supply and return, industrial water, potable water, natural gas, electrical and communications conduits and wiring), Paved Roadways, Cast In Place Walls with and without formliners, Keystone Walls and Bridges.

• My responsibilities in scheduling included the tracking of the Procurement Process from Change Orders to completed installation and tracking of all associated costs and man-hours. Additional responsibilities included managing daily report used to track material installation and ultimately formatting and preparing the monthly progress payment request for Johnson Bros. as well as processing all subcontractor pay requests.

• My responsibilities included the maintenance of the computer network for a 10 person Microsoft Network and the documentation control program called Expedition by Primavera Systems. I set up the system and assisted in the maintenance and training of appropriate personnel, adjusted the program as needed and recreated the reports needed to control the flow of information. Original Contract Value $14,650,000.00 +/- ending contract value

$20,000,000.00 +/- with over 200 change orders.

BRIAN NICHOLLS RESUME

3350A Highway 6 - # 307 Sugar Land, TX 77478 cell - 713-***-**** actexb@r.postjobfree.com Page 5 of 5

1/1993 – 5/1994 Nicholls Consulting Services Lakeland, FL. Estimating/ Scheduling Consultant

• Consultant on heavy civil/infrastructure contracts using state of the art computerized estimating and scheduling software. Established database on public entity bids and unit prices for public works contracts. Marketed pricing and time on network to companies and individuals to compare their pricing structures to the industry marketplace in Central Florida.

• Marketed construction related software programs in Scheduling, Documentation Control, Estimating and Job Cost Accounting to companies and trained appropriate personnel in the usage of the programs. Prepared and maintained software systems and training when changes in the software updates required additional training. 5/1992 – 1/1993 Westinghouse Remediation Services Tampa, FL. Environmental Estimator – Technical Writer

• Environmental Estimator: Responsible for materials and Labor quantity takeoffs for environmental cleanup sites for a T&M contract with the Florida Department of Transportation as well as EPA government projects and private sites.

• Technical Writer: Responsible for producing in house proposals for specific requests from private and government agencies for cleanup services. Directly responsible for two proposals to the FDOT related remedial T&M contracts in Districts 3 & 6 that totaled $6 million dollar over three year period. 6/1989 – 6/1992 Nicholls Consulting Services Las Vegas, NV. Estimating/ Scheduling Consultant

• Consultant on heavy civil/infrastructure contracts using state of the art computerized estimating and scheduling software. Established database on public entity bids and unit prices for public works contracts. Marketed pricing and time on network to companies and individuals to compare their pricing structures to the industry marketplace in Las Vegas, Nevada.

8/1986 – 6/1989 Self-Employed Financial Planner Phoenix, AZ. Independent Financial Planner

• Responsibilities include prospecting and maintaining client portfolios and investor relations. Sales of Mutual Funds and Life Insurance products and other financial services. Created and copyrighted a retirement workbook called “ The Professional Educators Guide to Retirement”. This workbook was designed for individuals who worked in the educational system or for a nonprofit organization to understand the retirement programs available through payroll deducted retirement funding.

• This workbook increased my marketing abilities and created more clients and a substantial increase in commissions.

8/1983 – 7/1986 Ramsey Concrete Phoenix, AZ.

Project Manager/Estimator/Superintendent

• Responsible for CPM scheduling, estimating, scheduling manpower, materials and equipment, cost and quality controls and direct supervision of select groups and job-sites. 5/1982 – 7/1983 P & R Construction Phoenix, AZ.

Construction/Operations Manager

• Responsible for entire field operations of concrete, rebar and masonry divisions and all work on all job-sites. Ultimately responsible for profit and loss on all projects, project management and all contracts for the company. 5/1980 – 4/1982 Parrish Concrete Placement Tucson & Phoenix, AZ. General Manager/Superintendent of Field Operations/Job-site Super/Foreman

• Fully responsible for Phoenix operations. Office and Field coordination as well as bottom line responsibility for profit and loss on projects.

• Job-site Superintendent/Foreman on multiple job-sites in the Tucson area. 5/1975 – 4/1980 Interstate Construction Co. Tucson, AZ. Manager/General Field Superintendent/Finisher/Carpenter Foreman

• Progressed from Laborer to Finisher/Carpenter Foreman within 1 year. Within 3 years promoted to Manager/General Field Superintendent Directly responsible for growth of company from 1977 through 1979 from

$600,000 to over $6 million a year for two years as manager. Responsible for all Project Management on all sites and contracts.

References available upon request.