Post Job Free

Resume

Sign in

Technician Microsoft Office

Location:
Lake Villa, IL
Salary:
60000
Posted:
February 04, 2016

Contact this candidate

Resume:

MICHAEL CHIODO

Lindenhurst, IL *****

actegg@r.postjobfree.com 847-***-****

RELIABILITY ASSURANCE ELECTRONICS/DEVICE VERIFICATION TECHNICIAN Develop and execute comprehensive manual and automated test procedures for early development prototype electronics. Provide prototype failure issues and duplicate potential field problems, enabling developers to create solutions that maximize functionality and enhance end user experience. Collaborate effectively with cross-functional project teams, delivering strong communication and detailed documentation that drives the decision-making process.

TECHNICAL PROFICIENCIES

Networking: RF, GSM, UMTS, CDMA, WLAN, GPS, NFC, LTE, WiFi, Bluetooth Software: Microsoft Office Suite (Word, Excel, PowerPoint, Access, Outlook), Lab View Applications: Rohde & Schwarz, Hewlett Packard, Mikron, FLIR Imaging Cameras, Fluke Equipment, MTS Systems, Norman RCA Abrasion Tester, Dust Chambers, Buehler Equipment, UV and Thermotron and Salt Fog Chambers

Tools: Soldering Tools, Fume Hoods, Chemical Lab Materials PROFESSIONAL EXPERIENCE

MOTOROLA MOBILITY, Chicago, IL 1990 – 2015

Cell Phone Manufacturer

Reliability Quality Test Technician 1998 – 2015

Facilitated device verification / accelerated life testing on cell phone prototypes and related accessories. Developed testing procedures to duplicate potential field failure issues and collected evidence data.

• Managed over 40 tests simultaneously, summarizing performance issues and root causes while effectively managing all due dates.

• Tested situations including water ingress, thermal imaging, paint robustness, display / lenses, vibrators / transducers, battery / SIM bounce, chemical plastic stress, UV exposure, signaling, and environmental operating parameters; ensured appropriate capture of failure evidence and root cause development that eliminated costly problems prior to production.

• Combined separate test flows for non-destructive tests, using fewer cell phones and decreasing cost for entire test submission.

• Oversaw several types of testing apparatuses, including mechanical and electrical lab fixtures and ASTM standard equipment, ensuring clean lab environment and ISO calibration compliance. o Utilized American Standard Equipment as Norman Abrasion RCA Tool, MTS Equipment, FLIR Infrared Cameras, Thermotron Chambers, Salt Fog Chambers, Votsch UV Chambers and Vibration tables.

• Trained and supervised many technicians and contractors, providing timely and efficient guidance on test procedure methodology for over 90 individual quality test flows as well as data report logging into global database.

• Partnered with repair center on identification of failure issues, collectively organizing top 3 problems and building test procedure plans to duplicate during new prototype builds. Technician Analyzer 1990 – 1998

Performed troubleshooting and repair on cell phone assembly line electronic failure issues, using schematics for every build of each different model.

EDUCATION

BA EET, Electronic Engineering Technology, DeVry, Lombard, IL



Contact this candidate