MARK K. SEELEY

**** *** ****** *****

Flint, MI. 48507

Cell: 810-***-****

actddh@r.postjobfree.com

OBJECTIVE

To obtain a position as a Certified Welder that will allow me to utilize my education and experience with opportunities to advance.

EXPERIENCE

BOILERMAKER, GUBMK, Cumberland City, TN. 10/11-12/11

Removed catalyst boxes from upper level of SCR.

Reinstalled new catalyst boxes to said system.

Clean, inspected and repaired lower levels of SCR.

Certified Welder, Force Protection, Charleston, S.C. 08/11-09/11

Removed/Installed new suspension on MRAP vehicles.

Removed mounting brackets using carbon arc gouging,

Reinstalled mounting brackets using GMAW flux-core.

BOILERMAKER, GUBMK, Drakesboro, KY. 03/11-04/11

Repair welded 3 large ID fans in the precip assembly using7018electrodes.

Part of a team that refurbished cleaning hammer assemblies on said project.

Certified Welder, BAE, Kandahar, Afghanistan 07/10-10/10

Removed/Installed new suspension on the MRAP(RG-33).

Removed mounting brackets by using the carbon-arc gouging.

Reinstalled mounting brackets using GMAW-P process.

Boilermaker, IL. Power, Power Maintenance & Constructors, Baldwin, IL. 09/09-10/09

Installed expansion joints in large exhaust duct work.

Installed 3 inch stainless steel bolts in duct work.

Completed 10 hour OSHA safety training.

Boilermaker, Iatan Power Plant, APCom Power, Kansas City, MO. 10/08-11/08

Performed SMAW on structural steel I-beams using 7018 electrodes.

Prepared said I-beams for welding by grinding double bevel groove.

Preheated double bevel groove according to D1.1 Code.

Boilermaker, Bechtel, Oak Creek, WI. 04/08-09/08

Performed SMAW on I-beams using 7018 electrodes per D1.1 Code.

Performed FCAW on 1/4” thick stainless steel duct work per D1.6 Code.

All welds were Penetrant Tested(PT) according to ANSI.

Boilermaker, Allen Steam Station, PSI Industries, Charlotte, N.C. 03/08-04/08

This system was a Clean Coal expansion project, EPA mandated.

Performed FCAW using .035 Inconel wire on duct work per AWS D1.6 Code.

Boilermaker, Barry Steam Plant, Fluor, Mobile, AL. 10/07-03/08

Performed SMAW on I=beams using 7018 electrodes per D1.1 Code.

Performed FCAW on 1/4” thick ss duct work according to D1.6 Code.

All welds were Penetrant Tested(PT) according to ANSI.

Boilermaker, Bechtel, Oak Creek, WI. 04/07-09/07

Performed SMAW on I-beams using 7018 electrodes according to D1.1 Code.

Performed FCAW on 1/4” thick ss duct work according to D1.6 Code.

Welder/fitter, Fluor Daniels; Ghent, KY. 01/07-03/07

Used 308 & 309 stainless steel electrodes per AWS D1.6.

Performed SMAW on I-beams using 7018 electrodes per D1.1 Code.

Welded FCAW carbon steel duct work using .045 wire per D1.1 Code.

Welder/fitter, Marshall Steam Station; The Shaw Group, Terrell, N.C. 01/06-10/06

Welded FCAW .045 wire per AWS D1.1 on EPA Mandated Clean Air Project.

Fabricated duct work for coal fired boilers that directed exhaust through a

slurry filtering system.

Welder/fitter, Midwest Controls & Engineering, Holly, MI. 08/98-09/05

Performed SMAW per AWS D1.1 using 6010, 6011, 7018 and 7024

electrodes on a variety of weldments installed on mechanical assembly lines.

Performed SMAW using 308 and 309 per D1.6 Code on many weldments.

Welded FCAW using .035 and .045 wire per AWS D1.1 Code on most frames

for assembly lines.

CERTIFICATION

American Welding Society API 1104 Certified Associate Welding Inspector (CAWI).

American Welding Society D1.1 SMAW

American Welding Society D1.1 FCAW

Certified through BAE GMAW-P .045 wire.

International Boilermakers Union - Local 687

Certified 10-Hour OSHA class (Construction Safety & Health).

EDUCATION

Associate in Science, Mott College, Flint, MI. 1986